Building record · BIN 3397443

230 Livingston Street

230 Livingston Street, Brooklyn, NY 11201

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3397443

230 Livingston Street

Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn

A consolidated public-record view · updated Sep 18, 2026

DOB filings
10
Active-status
5
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings10
Open or active-status records5
First included filingNov 30, 2018
Latest recorded changeSep 18, 2026

The lot

What is already here?

The lot holds a 26-story condominium built in 2009, with 271 homes, on a 18,145 sq ft lot.

  1. Floors 19–26Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 54.7 m. Nothing on that side reaches this floor.
  2. Floors 2–18Homes271 homes are recorded on this lot — about 11 homes to a floor, and the apartments assessed on this block run to a typical 1,237 sq ft (115 m²). The city does not publish which floor any of them is on.
  3. Floor 1Street levelStreet level. The lot is recorded as mixed residential and commercial, so this floor is where the commercial space is.
  • Street levelMixed residential and commercial
  • Homes271 recorded · typically 115 m² · valued $429,538
  • Above the southern skylineFrom about floor 19 — the tallest thing within 60 m to the south is 54.7 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 83 m over 26 floors, as the city counts them. 3 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
2009
Floors
26
Residential units
271
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C6-4
Lot area
18,145 sq ft
Building area
228,246 sq ft

Housing violations

13 violations are open against this address under the Housing Maintenance Code. 2 of them are the class the city calls immediately hazardous.

  • 2Immediately hazardous
  • 8Hazardous
  • 3Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

The apartments

96 condominium apartments are assessed on this block, and the typical one is 1,237 sq ft (115 m²). They run from 70 to 181 m².

The city values the typical one at $429,538. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

3 apartments on this tax block changed hands in the year the city last published, at a median of $4,350,000, from 2,100,000 to 4,350,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

NYC TRANSIT

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 23, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 58 notices on file; the most recent was issued May 31, 2018.

  • No report and / or late filing (facade)

    Issued May 31, 2018 — FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017

  • Construction

    Issued Jul 22, 1997

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3397443. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 10 alteration filing. Its latest status categories are 5 approved, 5 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Nov 30, 2018
Latest recorded change
Sep 18, 2026
Highest proposed story count
26 stories
Highest proposed unit count
311 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 230 Livingston Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Application filed for temporary construction fence. Filing B00103269-I1.

    01
  2. Alteration approved

    Filing B00103269-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for B00103269-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Installation of sidewalk shed in accordance with nycc 2014 chapter 33. no change in egress, use, or occupancy. Filing B00315649-I1.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for B00315649-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration filed

    Structural modification within cellar and 1st floor as per plans filed herewith. No change in use, egress, or occupancy. Filing B00317316-I1.

    06
  7. Alteration filed

    Sprinkler modification within sub-cellar and ground floor as per plans filed herewith. No change in use, egress, or occupancy. Filing B00315860-I1.

    07
  8. Alteration filed

    Mechanical modification to sub cellar, cellar, and 1st floor as per plans filed herewith. No change in use, egress, or occupancy. Filing B00315828-I1.

    08
  9. Alteration approved

    Filing B00315828-I1 reached an approved status.

    09
  10. Alteration filed

    Plumbing modification within sub cellar, cellar, and 1st floor as per plans filed herewith. Connect to existing gas meter at sub cellar level gas meter room Gas riser from sub cellar to sub cellar per filed drawing. Filing B00315851-I1.

    010
  11. Alteration approved

    Filing B00317316-I1 reached an approved status.

    011
  12. Alteration approved

    Filing B00315860-I1 reached an approved status.

    012
  13. Alteration approved

    Filing B00315851-I1 reached an approved status.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for B00317316-I1. That is not by itself confirmation of activity on site.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for B00315828-I1. That is not by itself confirmation of activity on site.

    015
  16. Permit recorded for alteration

    DOB lists a first permit date for B00315851-I1. That is not by itself confirmation of activity on site.

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for B00315860-I1. That is not by itself confirmation of activity on site.

    017
  18. Alteration now approved

    The latest status recorded for B00103269-I1 is “Permit Entire.”

    018
  19. Alteration filed

    Plumbing modification within sub cellar, cellar, and 1st floor as per plans filed herewith. No change in use, egress, or occupancy. Filing B00315851-P1.

    019
  20. Alteration approved

    Filing B00315851-P1 reached an approved status.

    020
  21. Alteration filed

    Plumbing modification within sub cellar, cellar, and 1st floor as per plans filed herewith. Connect to existing gas meter at sub cellar level gas meter room Gas riser from sub cellar to sub cellar per filed drawing. Filing B00315851-P2.

    021
  22. Alteration approved

    Filing B00315851-P2 reached an approved status.

    022
  23. Alteration signed off

    DOB recorded a sign-off for B00315649-I1.

    023
  24. Alteration now completed

    The latest status recorded for B00315649-I1 is “LOC Issued.”

    024
  25. Alteration filed

    Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300 psf. Filing B00583802-I1.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for B00583802-I1. That is not by itself confirmation of activity on site.

    026
  27. Alteration now approved

    The latest status recorded for B00315851-P1 is “Approved.”

    027
  28. Alteration now approved

    The latest status recorded for B00315851-P2 is “Approved.”

    028
  29. Alteration signed off

    DOB recorded a sign-off for B00315828-I1.

    029
  30. Alteration now completed

    The latest status recorded for B00315828-I1 is “LOC Issued.”

    030
  31. Alteration signed off

    DOB recorded a sign-off for B00315851-I1.

    031
  32. Alteration now completed

    The latest status recorded for B00315851-I1 is “LOC Issued.”

    032
  33. Alteration signed off

    DOB recorded a sign-off for B00317316-I1.

    033
  34. Alteration now completed

    The latest status recorded for B00317316-I1 is “LOC Issued.”

    034
  35. Alteration now approved

    The latest status recorded for B00315860-I1 is “Permit Entire.”

    035
  36. Alteration signed off

    DOB recorded a sign-off for B00583802-I1.

    036
  37. Alteration now completed

    The latest status recorded for B00583802-I1 is “LOC Issued.”

    037
  38. Alteration filed

    INSTALLATION OF AN AWNING WITH BUSINESS NAME (HiSun Market) ON STOREFRONT AT FIRST FLOOR LEVEL OF THE STORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO DISTURBING EXTERIOR WALL. Filing B01449274-I1.

    038
  39. Alteration approved

    Filing B01449274-I1 reached an approved status.

    039
  40. Permit recorded for alteration

    DOB lists a first permit date for B01449274-I1. That is not by itself confirmation of activity on site.

    040
  41. Alteration now approved

    The latest status recorded for B01449274-I1 is “Permit Entire.”

    041