DOB filing B01397579-P1
Alteration filing at 202 36 Street
Building record · BIN 3398687
220 36 Street, Brooklyn, NY 11232
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 18 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3398687
220 36 Street
Sunset Park (West), Brooklyn
A consolidated public-record view · updated Sep 24, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 6-story office building built in 1907, on a 48,000 sq ft lot.
Owner of record
1-10 BUSH TERMINAL OWNER LP
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 27, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 69 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3398687. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 18 alteration filing. Its latest status categories are 1 under review, 4 approved, 13 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 220 36 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 18 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Erect illuminated accessory wall sign, non-advertising, non-flashing sign, no change in use, egress, or occupancy. Filing B00000720-I1.
DOB lists a first permit date for B00000720-I1. That is not by itself confirmation of activity on site.
Installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. sidewalk shed filed under chapter 33 of the 2014 NYC building code. Filing B00002554-I1.
DOB lists a first permit date for B00002554-I1. That is not by itself confirmation of activity on site.
Installation of medium duty pipe scaffolding as per plans for remedial repairs. no change in use occupancy or egress under this application. pipe scaffolding filed under chapter 33 of the 2014 NYC building code. sidewalk shed filed under separate application. Filing B00002559-I1.
DOB lists a first permit date for B00002559-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00000720-I1.
Installation of new plumbing fixture as per plans filed herewith. Filing B00308263-I1.
Filing B00308263-I1 reached an approved status.
Sprinkler work on partial cellar and 1st floor as per plans filed herewith. Filing B00350890-I1.
Filing B00350890-I1 reached an approved status.
Filing herewith for installation of HVAC equipment (Industry City 2-1-B Powerhouse). Filing B00334236-I1.
DOB lists a first permit date for B00334236-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00334236-I1.
DOB lists a first permit date for B00308263-I1. That is not by itself confirmation of activity on site.
Structural work on partial 1st floor as per plan filed herewith. Filing B00358218-I1.
Filing B00358218-I1 reached an approved status.
Filing herewith for installation of new gas riser servicing (4) HVAC units. Filing B00374801-I1.
Filing B00374801-I1 reached an approved status.
DOB lists a first permit date for B00374801-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00358218-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00350890-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00308263-I1.
Filing herewith plumbing work for temporary heaters for outdoor dining as per plans. No change in use, egress or occupancy. Filing B00414478-I1.
Filing B00414478-I1 reached an approved status.
DOB recorded a sign-off for B00350890-I1.
DOB lists a first permit date for B00414478-I1. That is not by itself confirmation of activity on site.
Filing herewith plumbing work for temporary heaters for outdoor dining as per plans. No change in use, egress or occupancy. Filing B00414478-P1.
Filing B00414478-P1 reached an approved status.
Filing herewith for installation of new gas riser servicing (4) HVAC units. Filing B00374801-P1.
Filing B00374801-P1 reached an approved status.
DOB recorded a sign-off for B00358218-I1.
The latest status recorded for B00308263-I1 is “LOC Issued.”
The latest status recorded for B00334236-I1 is “LOC Issued.”
The latest status recorded for B00350890-I1 is “LOC Issued.”
The latest status recorded for B00358218-I1 is “LOC Issued.”
The latest status recorded for B00374801-P1 is “Approved.”
The latest status recorded for B00414478-P1 is “Approved.”
The latest status recorded for B00000720-I1 is “LOC Issued.”
Window replacement at partial firstfloor at an existing six story building BIN no 3398687. no change inuse. egress or occupancy. Filing B00495640-I1.
Filing B00495640-I1 reached an approved status.
DOB lists a first permit date for B00495640-I1. That is not by itself confirmation of activity on site.
Installation and removal of plumbing fixtures. Filing B00482915-I1.
Proposed construction on 1st floor as per plans filed herewith. Filing B00482853-I1.
Filing B00482915-I1 reached an approved status.
DOB lists a first permit date for B00482915-I1. That is not by itself confirmation of activity on site.
Filing herewith for installation of HVAC equipment. Filing B00519611-I1.
Filing B00519611-I1 reached an approved status.
DOB lists a first permit date for B00519611-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00495640-I1.
The latest status recorded for B00495640-I1 is “LOC Issued.”
DOB recorded a sign-off for B00519611-I1.
The latest status recorded for B00519611-I1 is “LOC Issued.”
DOB recorded a sign-off for B00374801-I1.
The latest status recorded for B00374801-I1 is “LOC Issued.”
Filing B00482853-I1 reached an approved status.
DOB lists a first permit date for B00482853-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00482853-I1.
The latest status recorded for B00482853-I1 is “LOC Issued.”
DOB recorded a sign-off for B00482915-I1.
The latest status recorded for B00482915-I1 is “LOC Issued.”
DOB recorded a sign-off for B00414478-I1.
The latest status recorded for B00414478-I1 is “LOC Issued.”
DOB recorded a sign-off for B00002554-I1.
The latest status recorded for B00002554-I1 is “LOC Issued.”
DOB recorded a sign-off for B00002559-I1.
The latest status recorded for B00002559-I1 is “LOC Issued.”
Alteration of existing sprinkler system including the relocation & replacement of sprinkler heads along with the removal of the existing pre-action system as indicated on the drawings filed herein. Filing B01447752-I1.
Mechanical work to remove existing crac split system at roof, new ductwork at 6th floor as per plans filed herewith. Filing B01447752-S1.
Filing B01447752-S1 reached an approved status.
The latest status recorded for B01447752-S1 is “Approved.”
Filing B01447752-I1 reached an approved status.
Interior renovation at partial 5th and 6th floors, unit aa, as per plans filed herewith. Filing B01397579-P1.
DOB lists a first permit date for B01447752-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01447752-I1 is “Permit Entire.”
The latest status recorded for B01397579-P1 is “Objections.”