DOB filing B00005279-I1
Alteration filing at 65 Irving Place
Building record · BIN 3418380
65 Irving Place, Brooklyn, NY 11238
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3418380
65 Irving Place
Clinton Hill, Brooklyn
A consolidated public-record view · updated Aug 5, 2021
A building-level summary of matched filings, active-status records and published identifiers.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3418380. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 3 alteration filing. Its latest status categories are 1 recorded as completed, 2 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 65 Irving Place.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Proposed installation of temporary pipe scaffold for new building as per plans. work shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application. Filing B00005279-I1.
DOB lists a first permit date for B00005279-I1. That is not by itself confirmation of activity on site.
Proposed installation of temporary pipe scaffold for new building as per plans. work shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application. Filing B00005279-P1.
Filing B00005279-P1 reached an approved status.
Proposed installation of temporary pipe scaffold for new building as per plans. work shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application. Filing B00005279-P2.
Filing B00005279-P2 reached an approved status.
The latest status recorded for B00005279-P1 is “Approved.”
The latest status recorded for B00005279-P2 is “Approved.”
DOB recorded a sign-off for B00005279-I1.
The latest status recorded for B00005279-I1 is “LOC Issued.”