DOB filing B00006484-I1
Alteration filing at 540 Fulton Street
Building record · BIN 3424477
540 Fulton Street, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3424477
540 Fulton Street
Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn
A consolidated public-record view · updated Jan 27, 2023
A building-level summary of matched filings, active-status records and published identifiers.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3424477. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 4 alteration filing. Its latest status categories are 2 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 540 Fulton Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Herewith filed application for installation of construction fence. Filing B00006484-I1.
DOB lists a first permit date for B00006484-I1. That is not by itself confirmation of activity on site.
Installation of a heavy duty sidewalk shed as per plans in conjunction with nb construction. no change in use, egress or occupancy. sidewalk shed to comply with chapter 33 of NYC building code of 2014. Filing B00100449-I1.
DOB lists a first permit date for B00100449-I1. That is not by itself confirmation of activity on site.
Installation of a temporary scaffold as per plans in conjunction with nb construction . no change in use, egress or occupancy. scaffold shall comply with 2014 NYC building code, chapter 33. Filing B00115579-I1.
DOB lists a first permit date for B00115579-I1. That is not by itself confirmation of activity on site.
Installation of a heavy duty sidewalk shed as per plans in conjunction with nb construction. no change in use, egress or occupancy. sidewalk shed to comply with chapter 33 of NYC building code of 2014. Filing B00100449-P1.
Filing B00100449-P1 reached an approved status.
DOB recorded a sign-off for B00100449-I1.
The latest status recorded for B00100449-I1 is “LOC Issued.”
DOB recorded a sign-off for B00115579-I1.
The latest status recorded for B00115579-I1 is “LOC Issued.”
The latest status recorded for B00100449-P1 is “Approved.”
The latest status recorded for B00006484-I1 is “Permit Entire.”