Building record · BIN 3425134

325 Henry Street

325 Henry Street, Brooklyn, NY 11201

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3425134

325 Henry Street

Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn

A consolidated public-record view · updated Jan 26, 2022

DOB filings
4
Active-status
3
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings4
Open or active-status records3
First included filingMar 19, 2021
Latest recorded changeJan 26, 2022

The lot

What is already here?

The lot holds a 4-story condominium built in 2016, with 8 homes, on a 7,785 sq ft lot.

Built
2016
Last altered
2017
Floors
4
Residential units
8
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
7,785 sq ft
Building area
24,127 sq ft
Historic district
Cobble Hill Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3425134. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 4 alteration filing. Its latest status categories are 1 recorded as completed, 3 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Mar 19, 2021
Latest recorded change
Jan 26, 2022
Highest proposed story count
Not stated
Highest proposed unit count
8 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 325 Henry Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    PHB Existing gas at cook top New piping after valve strait up to terrace. Existing plumbing at W/D . Cold water and drain to terrace. Shut off valve and drain for winteraization. Core drill up to terrace. No change in use, egress or occupancy. Filing B00485419-I1.

    01
  2. Alteration approved

    Filing B00485419-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for B00485419-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    PHB Existing gas at cook top New piping after valve strait up to terrace. Existing plumbing at W/D . Cold water and drain to terrace. Shut off valve and drain for winteraization. Core drill up to terrace. No change in use, egress or occupancy. Filing B00485419-P1.

    04
  5. Alteration approved

    Filing B00485419-P1 reached an approved status.

    05
  6. Alteration now approved

    The latest status recorded for B00485419-P1 is “Approved.”

    06
  7. Alteration filed

    PHB Existing gas at cook top New piping after valve strait up to terrace. Existing plumbing at W/D . Cold water and drain to terrace. Shut off valve and drain for winteraization. Core drill up to terrace. No change in use, egress or occupancy. Filing B00485419-P2.

    07
  8. Alteration approved

    Filing B00485419-P2 reached an approved status.

    08
  9. Alteration now approved

    The latest status recorded for B00485419-P2 is “Approved.”

    09
  10. Alteration filed

    PHB Existing gas at cook top New piping after valve strait up to terrace. Existing plumbing at W/D . Cold water and drain to terrace. Shut off valve and drain for winteraization. Core drill up to terrace. No change in use, egress or occupancy. Filing B00485419-P3.

    010
  11. Alteration approved

    Filing B00485419-P3 reached an approved status.

    011
  12. Alteration now approved

    The latest status recorded for B00485419-P3 is “Approved.”

    012
  13. Alteration signed off

    DOB recorded a sign-off for B00485419-I1.

    013
  14. Alteration now completed

    The latest status recorded for B00485419-I1 is “LOC Issued.”

    014