Building record · BIN 3425369

2859 Flatbush Avenue

2859 Flatbush Avenue, Brooklyn, NY 11234

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 9 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3425369

2859 Flatbush Avenue

Barren Island-Floyd Bennett Field, Brooklyn

A consolidated public-record view · updated Nov 24, 2025

DOB filings
9
Active-status
5
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings9
Open or active-status records5
First included filingMay 8, 2019
Latest recorded changeNov 24, 2025

The lot

What is already here?

The lot holds a 3-story garage or fuel station built in 2016, on a 110,303 sq ft lot.

  1. Floor 3Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 6.2 m. Nothing on that side reaches this floor.
  2. Floor 2Nothing on record
  3. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 3 — the tallest thing within 60 m to the south is 6.2 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 17.4 m over 3 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
2016
Floors
3
Residential units
0
Building type
Garage or fuel station
Land use
Commercial and office
Zoning district
C8-1
Lot area
110,303 sq ft
Building area
147,187 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 3, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 15 notices on file; the most recent was issued Apr 25, 2023.

  • Low pressure boiler

    Issued Apr 25, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Apr 25, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Apr 25, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3425369. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 9 alteration filing. Its latest status categories are 4 recorded as completed, 5 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
May 8, 2019
Latest recorded change
Nov 24, 2025
Highest proposed story count
Not stated
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 2859 Flatbush Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 9 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Tmobile - Installation of antenna sectors with related RRU's, and mw antennas on the roof. Installation of exterior cabinets on steel platform on the roof. All work is in compliance with TPPN 5/98. No change in use, egress, or occupancy. Filing B00062690-P1.

    01
  2. Alteration approved

    Filing B00062690-P1 reached an approved status.

    02
  3. Alteration filed

    Revised places per fdny objection letter dated june 5 2023 2023-tmengr-004016-plan. Filing B00219399-I1.

    03
  4. Alteration filed

    Extension of existing gas piping to flammable burn unit in paint spray booth. no change co, egress, zoning.OT- GEN CON JOB #321984796. MS- MECHANICAL JOB# B00219399. SP-SPRINKLER JOB #B00219450. Filing B00219426-I1.

    04
  5. Alteration filed

    Extension of existing sprinkler system piping to paint spray booth and mixing room for fire suppression. no change to egress, co, or zoning. ot job#321984796. ms job# b00219399. pl job# b00219426. Filing B00219450-I1.

    05
  6. Alteration approved

    Filing B00219450-I1 reached an approved status.

    06
  7. Alteration filed

    Install illuminated non-advertising business accessory sign on the wall. Filing B00305968-I1.

    07
  8. Alteration approved

    Filing B00305968-I1 reached an approved status.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for B00305968-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration approved

    Filing B00219426-I1 reached an approved status.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for B00219426-I1. That is not by itself confirmation of activity on site.

    011
  12. Alteration signed off

    DOB recorded a sign-off for B00305968-I1.

    012
  13. Alteration now completed

    The latest status recorded for B00305968-I1 is “LOC Issued.”

    013
  14. Alteration now approved

    The latest status recorded for B00062690-P1 is “Approved.”

    014
  15. Alteration filed

    Extension of existing gas piping to flammable burn unit in paint spray booth. no change co, egress, zoning.OT- GEN CON JOB #321984796. MS- MECHANICAL JOB# B00219399. SP-SPRINKLER JOB #B00219450. Filing B00219426-P1.

    015
  16. Alteration approved

    Filing B00219426-P1 reached an approved status.

    016
  17. Alteration now approved

    The latest status recorded for B00219426-P1 is “Approved.”

    017
  18. Alteration filed

    Extension of existing gas piping to flammable burn unit in paint spray booth. no change co, egress, zoning.OT- GEN CON JOB #321984796. MS- MECHANICAL JOB# B00219399. SP-SPRINKLER JOB #B00219450. Filing B00219426-P2.

    018
  19. Alteration approved

    Filing B00219426-P2 reached an approved status.

    019
  20. Alteration now approved

    The latest status recorded for B00219426-P2 is “Approved.”

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for B00219450-I1. That is not by itself confirmation of activity on site.

    021
  22. Alteration approved

    Filing B00219399-I1 reached an approved status.

    022
  23. Alteration filed

    Revised places per fdny objection letter dated june 5 2023 2023-tmengr-004016-plan. Filing B00219399-P1.

    023
  24. Alteration approved

    Filing B00219399-P1 reached an approved status.

    024
  25. Alteration now approved

    The latest status recorded for B00219399-P1 is “Approved.”

    025
  26. Alteration filed

    Extension of existing sprinkler system piping to paint spray booth and mixing room for fire suppression. no change to egress, co, or zoning. ot job#321984796. ms job# b00219399. pl job# b00219426. Filing B00219450-P1.

    026
  27. Alteration approved

    Filing B00219450-P1 reached an approved status.

    027
  28. Alteration now approved

    The latest status recorded for B00219450-P1 is “Approved.”

    028
  29. Permit recorded for alteration

    DOB lists a first permit date for B00219399-I1. That is not by itself confirmation of activity on site.

    029
  30. Alteration signed off

    DOB recorded a sign-off for B00219426-I1.

    030
  31. Alteration now completed

    The latest status recorded for B00219426-I1 is “LOC Issued.”

    031
  32. Alteration signed off

    DOB recorded a sign-off for B00219450-I1.

    032
  33. Alteration now completed

    The latest status recorded for B00219450-I1 is “LOC Issued.”

    033
  34. Alteration signed off

    DOB recorded a sign-off for B00219399-I1.

    034
  35. Alteration now completed

    The latest status recorded for B00219399-I1 is “LOC Issued.”

    035