Building record · BIN 3425857

70 Atlantic Avenue

70 Atlantic Avenue, Brooklyn, NY 11201

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 34 independently sourced records, including 19 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3425857

70 Atlantic Avenue

Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn

A consolidated public-record view · updated Aug 20, 2026

DOB filings
34
Active-status
19
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings34
Open or active-status records19
First included filingJan 3, 2019
Latest recorded changeAug 20, 2026

The lot

What is already here?

The lot holds a 5-story health facility built in 2022, on a 33,345 sq ft lot.

  1. Floors 2–5Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as public facilities and institutions.
  • Street levelPublic facilities and institutions
  • Above the southern skylineFrom about floor 10 — the tallest thing within 60 m to the south is 27.4 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 25.9 m over 5 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
2022
Last altered
2019
Floors
5
Residential units
0
Building type
Health facility
Land use
Public facilities and institutions
Zoning district
R6
Lot area
33,345 sq ft
Building area
160,505 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 14 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3425857. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 34 alteration filing. Its latest status categories are 19 approved, 15 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jan 3, 2019
Latest recorded change
Aug 20, 2026
Highest proposed story count
Not stated
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 70 Atlantic Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 34 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00111770-I1.

    01
  2. Permit recorded for alteration

    DOB lists a first permit date for B00111770-I1. That is not by itself confirmation of activity on site.

    02
  3. Alteration filed

    Installation of construction fence during new building construction, filed separately. construction fence shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application. Filing B00332213-I1.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for B00332213-I1. That is not by itself confirmation of activity on site.

    04
  5. Alteration filed

    Installation of heavy duty sidewalk shed during nb construction, filed sep. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00376438-I1.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for B00376438-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Installation of scaffold as per drawings. scaffold shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application. Filing B00402505-I1.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00402505-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration filed

    Installation of temporary roof protection at adajecent property (88 atlantic ave) during nb construction, filed sep. temporary roof protection shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00462417-I1.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for B00462417-I1. That is not by itself confirmation of activity on site.

    010
  11. Alteration filed

    Installation of temporary overhead protection at adjacent property (94 atlantic ave) during nb construction, filed sep. overhead protection shall comply with ch #33 of the NYC bldg code. no change in use, occupancy or egress under this application. Filing B00491961-I1.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for B00491961-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    Installation of dual 6000# capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the NYC bldg code. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing B00509282-I1.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for B00509282-I1. That is not by itself confirmation of activity on site.

    014
  15. Alteration filed

    Installation of plywood fence during nb construction filed sep. plywood fence shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application. Filing B00511649-I1.

    015
  16. Permit recorded for alteration

    DOB lists a first permit date for B00511649-I1. That is not by itself confirmation of activity on site.

    016
  17. Alteration filed

    Installation of temporary overhead protection at adjacent property (94 atlantic ave) during nb construction, filed sep. overhead protection shall comply with ch #33 of the NYC bldg code. no change in use, occupancy or egress under this application. Filing B00491961-P1.

    017
  18. Alteration filed

    HEREWITH FILING FOR NEW BOILER INSTALLATIONS ON THE FIFTH FLOOR IN CONJUNCTION WITH NB 320908559. Fuel oil storage tanks are filed and being installed under application B00485257. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Filing B00496230-I1.

    018
  19. Alteration approved

    Filing B00491961-P1 reached an approved status.

    019
  20. Alteration filed

    Herewith filing for sprinkler/standpipe systems in conjunction with nb applicationjob# 320908559 for the cobble hill building to provide fire protection systems through new building. no change in use, egress, oroccupancy. Filing B00501438-I1.

    020
  21. Alteration approved

    Filing B00496230-I1 reached an approved status.

    021
  22. Alteration filed

    Herewith filing for installation of a 12,000 gallon, single wall, primary fuel oil tank in the sub-cellar (3-hr tank vault)and a 290 gallon fuel oil day tank on the fifth floor. no change to use, egress, or occupancy. Filing B00485257-I1.

    022
  23. Alteration filed

    Herewith filing for emergency generator in conjunction with nb applicationjob# 320908559 for the cobble hill building. no change in use, egress, oroccupancy. Filing B00485233-I1.

    023
  24. Alteration approved

    Filing B00485233-I1 reached an approved status.

    024
  25. Alteration filed

    Installation of dual 6000# capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the NYC bldg code. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing B00509282-P1.

    025
  26. Alteration approved

    Filing B00509282-P1 reached an approved status.

    026
  27. Alteration filed

    Installation of a temporary system scaffold stair tower as per drawings. stair tower shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00551206-I1.

    027
  28. Permit recorded for alteration

    DOB lists a first permit date for B00551206-I1. That is not by itself confirmation of activity on site.

    028
  29. Alteration approved

    Filing B00485257-I1 reached an approved status.

    029
  30. Alteration now approved

    The latest status recorded for B00491961-P1 is “Approved.”

    030
  31. Alteration now approved

    The latest status recorded for B00509282-P1 is “Approved.”

    031
  32. Alteration approved

    Filing B00501438-I1 reached an approved status.

    032
  33. Alteration filed

    Installation of a temporary system scaffold stair tower as per drawings. stair tower shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00551206-P1.

    033
  34. Permit recorded for alteration

    DOB lists a first permit date for B00501438-I1. That is not by itself confirmation of activity on site.

    034
  35. Alteration approved

    Filing B00551206-P1 reached an approved status.

    035
  36. Alteration now approved

    The latest status recorded for B00551206-P1 is “Approved.”

    036
  37. Permit recorded for alteration

    DOB lists a first permit date for B00496230-I1. That is not by itself confirmation of activity on site.

    037
  38. Permit recorded for alteration

    DOB lists a first permit date for B00485257-I1. That is not by itself confirmation of activity on site.

    038
  39. Alteration filed

    Installation of temporary work platforms as per drawings. temporary work platforms shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00610544-I1.

    039
  40. Permit recorded for alteration

    DOB lists a first permit date for B00610544-I1. That is not by itself confirmation of activity on site.

    040
  41. Alteration filed

    Installation of temporary work platform as per drawings. work platform shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00630960-I1.

    041
  42. Permit recorded for alteration

    DOB lists a first permit date for B00630960-I1. That is not by itself confirmation of activity on site.

    042
  43. Alteration filed

    Installation of temporary work platforms as per drawings. temporary work platforms shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00610544-P1.

    043
  44. Alteration approved

    Filing B00610544-P1 reached an approved status.

    044
  45. Alteration now approved

    The latest status recorded for B00610544-P1 is “Approved.”

    045
  46. Alteration filed

    Installation of temporary work platforms as per drawings. temporary work platforms shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00610544-P2.

    046
  47. Alteration approved

    Filing B00610544-P2 reached an approved status.

    047
  48. Alteration now approved

    The latest status recorded for B00610544-P2 is “Approved.”

    048
  49. Alteration filed

    Installation of temporary work platforms as per drawings. temporary work platforms shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00610544-P3.

    049
  50. Alteration approved

    Filing B00610544-P3 reached an approved status.

    050
  51. Alteration now approved

    The latest status recorded for B00610544-P3 is “Approved.”

    051
  52. Alteration filed

    Installation of heavy duty sidewalk shed during nb construction, filed sep. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00376438-P1.

    052
  53. Alteration filed

    Installation of plywood fence during new building construction, filed separately. plywood fence shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application. Filing B00332213-P1.

    053
  54. Alteration approved

    Filing B00332213-P1 reached an approved status.

    054
  55. Alteration now approved

    The latest status recorded for B00332213-P1 is “Approved.”

    055
  56. Alteration approved

    Filing B00376438-P1 reached an approved status.

    056
  57. Alteration now approved

    The latest status recorded for B00376438-P1 is “Approved.”

    057
  58. Alteration filed

    Installation of plywood fence during new building construction, filed separately. plywood fence shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application. Filing B00332213-P2.

    058
  59. Alteration filed

    Installation of heavy duty sidewalk shed during nb construction, filed sep. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00376438-P2.

    059
  60. Alteration approved

    Filing B00332213-P2 reached an approved status.

    060
  61. Alteration now approved

    The latest status recorded for B00332213-P2 is “Approved.”

    061
  62. Alteration approved

    Filing B00376438-P2 reached an approved status.

    062
  63. Alteration now approved

    The latest status recorded for B00376438-P2 is “Approved.”

    063
  64. Alteration filed

    Installation of heavy duty sidewalk shed during nb construction, filed sep. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00376438-P3.

    064
  65. Alteration approved

    Filing B00376438-P3 reached an approved status.

    065
  66. Alteration now approved

    The latest status recorded for B00376438-P3 is “Approved.”

    066
  67. Alteration signed off

    DOB recorded a sign-off for B00402505-I1.

    067
  68. Alteration now completed

    The latest status recorded for B00402505-I1 is “LOC Issued.”

    068
  69. Alteration filed

    Installation of heavy duty sidewalk shed during nb construction, filed sep. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing B00376438-P4.

    069
  70. Alteration approved

    Filing B00376438-P4 reached an approved status.

    070
  71. Alteration now approved

    The latest status recorded for B00376438-P4 is “Approved.”

    071
  72. Alteration filed

    Herewith filing for sprinkler/standpipe systems in conjunction with nb applicationjob# 320908559 for the cobble hill building to provide fire protection systems through new building. no change in use, egress, oroccupancy. Filing B00501438-P1.

    072
  73. Alteration signed off

    DOB recorded a sign-off for B00509282-I1.

    073
  74. Alteration now completed

    The latest status recorded for B00509282-I1 is “LOC Issued.”

    074
  75. Alteration signed off

    DOB recorded a sign-off for B00551206-I1.

    075
  76. Alteration now completed

    The latest status recorded for B00551206-I1 is “LOC Issued.”

    076
  77. Alteration filed

    Herewith filing for emergency generator in conjunction with nb applicationjob# 320908559 for the cobble hill building. no change in use, egress, oroccupancy. Filing B00485233-P1.

    077
  78. Alteration filed

    HEREWITH FILING FOR NEW BOILER INSTALLATIONS ON THE FIFTH FLOOR IN CONJUNCTION WITH NB 320908559. Fuel oil storage tanks are filed and being installed under application B00485257. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Filing B00496230-P1.

    078
  79. Alteration filed

    Herewith filing for installation of a 12,000 gallon, single wall, primary fuel oil tank in the sub-cellar (3-hr tank vault)and a 290 gallon fuel oil day tank on the fifth floor. no change to use, egress, or occupancy. Filing B00485257-P1.

    079
  80. Alteration approved

    Filing B00485257-P1 reached an approved status.

    080
  81. Alteration now approved

    The latest status recorded for B00485257-P1 is “Approved.”

    081
  82. Alteration approved

    Filing B00496230-P1 reached an approved status.

    082
  83. Alteration now approved

    The latest status recorded for B00496230-P1 is “Approved.”

    083
  84. Alteration approved

    Filing B00501438-P1 reached an approved status.

    084
  85. Alteration now approved

    The latest status recorded for B00501438-P1 is “Approved.”

    085
  86. Alteration approved

    Filing B00485233-P1 reached an approved status.

    086
  87. Alteration now approved

    The latest status recorded for B00485233-P1 is “Approved.”

    087
  88. Permit recorded for alteration

    DOB lists a first permit date for B00485233-I1. That is not by itself confirmation of activity on site.

    088
  89. Alteration filed

    Installation of construction fence during new building construction, filed separately. construction fence shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application. Filing B00332213-P3.

    089
  90. Alteration approved

    Filing B00332213-P3 reached an approved status.

    090
  91. Alteration now approved

    The latest status recorded for B00332213-P3 is “Approved.”

    091
  92. Alteration signed off

    DOB recorded a sign-off for B00376438-I1.

    092
  93. Alteration now completed

    The latest status recorded for B00376438-I1 is “LOC Issued.”

    093
  94. Alteration signed off

    DOB recorded a sign-off for B00491961-I1.

    094
  95. Alteration now completed

    The latest status recorded for B00491961-I1 is “LOC Issued.”

    095
  96. Alteration signed off

    DOB recorded a sign-off for B00485257-I1.

    096
  97. Alteration now completed

    The latest status recorded for B00485257-I1 is “LOC Issued.”

    097
  98. Alteration signed off

    DOB recorded a sign-off for B00462417-I1.

    098
  99. Alteration now completed

    The latest status recorded for B00462417-I1 is “LOC Issued.”

    099
  100. Alteration signed off

    DOB recorded a sign-off for B00610544-I1.

    0100
  101. Alteration now completed

    The latest status recorded for B00610544-I1 is “LOC Issued.”

    0101
  102. Alteration signed off

    DOB recorded a sign-off for B00630960-I1.

    0102
  103. Alteration now completed

    The latest status recorded for B00630960-I1 is “LOC Issued.”

    0103
  104. Alteration filed

    Herewith filing for sprinkler/standpipe systems in conjunction with nb applicationjob# 320908559 for the cobble hill building to provide fire protection systems through new building. no change in use, egress, oroccupancy. Filing B00501438-P2.

    0104
  105. Alteration approved

    Filing B00501438-P2 reached an approved status.

    0105
  106. Alteration now approved

    The latest status recorded for B00501438-P2 is “Approved.”

    0106
  107. Alteration signed off

    DOB recorded a sign-off for B00332213-I1.

    0107
  108. Alteration now completed

    The latest status recorded for B00332213-I1 is “LOC Issued.”

    0108
  109. Alteration signed off

    DOB recorded a sign-off for B00511649-I1.

    0109
  110. Alteration now completed

    The latest status recorded for B00511649-I1 is “LOC Issued.”

    0110
  111. Alteration signed off

    DOB recorded a sign-off for B00111770-I1.

    0111
  112. Alteration now completed

    The latest status recorded for B00111770-I1 is “LOC Issued.”

    0112
  113. Alteration signed off

    DOB recorded a sign-off for B00501438-I1.

    0113
  114. Alteration now completed

    The latest status recorded for B00501438-I1 is “LOC Issued.”

    0114
  115. Alteration signed off

    DOB recorded a sign-off for B00485233-I1.

    0115
  116. Alteration now completed

    The latest status recorded for B00485233-I1 is “LOC Issued.”

    0116
  117. Alteration signed off

    DOB recorded a sign-off for B00496230-I1.

    0117
  118. Alteration now completed

    The latest status recorded for B00496230-I1 is “LOC Issued.”

    0118
  119. Alteration filed

    NYU Cobble Hill X-Ray and Control Room Conversion - Plumbing modifications as per plans filed herewith. No change in use, egress, or occupancy. Filing B01412294-S2.

    0119
  120. Alteration approved

    Filing B01412294-S2 reached an approved status.

    0120
  121. Permit recorded for alteration

    DOB lists a first permit date for B01412294-S2. That is not by itself confirmation of activity on site.

    0121
  122. Alteration now approved

    The latest status recorded for B01412294-S2 is “Permit Entire.”

    0122