DOB filing B01462270-I1
Alteration filing at 2286 Cropsey Avenue
Building record · BIN 3425955
2286 Cropsey Avenue, Brooklyn, NY 11214
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 26 independently sourced records, including 17 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3425955
2286 Cropsey Avenue
Gravesend (West), Brooklyn
A consolidated public-record view · updated Sep 18, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 23-story condominium built in 2019, with 151 homes, on a 45,688 sq ft lot.
The apartments
302 condominium apartments are assessed on this block, and the typical one is 889 sq ft (83 m²). They run from 50 to 219 m².
The city values the typical one at $216,255. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
17 apartments on this tax block changed hands in the year the city last published, at a median of $870,355, from 756,005 to 10,875,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
CROPSEY AIRS FEE HOLDER LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
19 homes at this address are currently listed for sale by Coldwell Banker and RE/MAX. Prices move; the brokerage’s own page is the one that is current, and every row here links to it.
| Unit | Rooms | Size | Price | Per sq ft | Listed by |
|---|---|---|---|---|---|
| Unit 13FFor sale | 2 bd · 2 ba | 946 sq ft88 m² | $995,000 | $1,052 | Coldwell Banker |
| Unit 20GFor sale | 2 bd · 2 ba | 770 sq ft72 m² | $863,000 | $1,121 | Coldwell Banker |
| Unit 20GFor sale | 2 bd · 2 ba | 770 sq ft72 m² | $863,000 | $1,121 | RE/MAX |
| Unit 10BFor sale | Price not read | Coldwell Banker | |||
| Unit 10DFor sale | Price not read | Coldwell Banker | |||
| Unit 10DFor sale | Price not read | RE/MAX | |||
| Unit 13FFor sale | Price not read | RE/MAX | |||
| Unit 19HFor sale | Price not read | Coldwell Banker | |||
| Unit 19HFor sale | Price not read | RE/MAX | |||
| Unit 21AFor sale | Price not read | Coldwell Banker | |||
| Unit 21AFor sale | Price not read | RE/MAX | |||
| Unit 6BFor sale | Price not read | Coldwell Banker | |||
| Unit 6BFor sale | Price not read | RE/MAX | |||
| Unit 6EFor sale | Price not read | Coldwell Banker | |||
| Unit 6EFor sale | Price not read | RE/MAX | |||
| Unit 6FFor sale | Price not read | Coldwell Banker | |||
| Unit 6FFor sale | Price not read | RE/MAX | |||
| Unit 8EFor sale | Price not read | Coldwell Banker | |||
| Unit 8EFor sale | Price not read | RE/MAX |
Read from the brokerages’ own published listings on September 22, 2026. A home drops off this table the next time they publish a list without it — usually because it sold or let, though a listing can also expire or be withdrawn. What we know is that it is no longer offered, which is why this shows what they have today rather than what we were told once. Everything on the market across the city.
Violation record
No open violations are recorded for this building. 6 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3425955. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 26 alteration filing. Its latest status categories are 16 approved, 1 under review, 8 recorded as completed, 1 closed or withdrawn. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 2286 Cropsey Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 26 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of sidewalk shed as per plans. sidewalk shed live load 300 psf, shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application. Filing B00217319-I1.
DOB lists a first permit date for B00217319-I1. That is not by itself confirmation of activity on site.
Installation of sidewalk shed as per plans. sidewalk shed live load 300 psf, shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application. Filing B00217319-P1.
Filing B00217319-P1 reached an approved status.
Installation of pipe scaffold as per plans. pipe scaffold shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy. Filing B00290171-I1.
DOB lists a first permit date for B00290171-I1. That is not by itself confirmation of activity on site.
Installation of sidewalk shed as per plans. sidewalk shed live load 300 psf, shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application. Filing B00217319-P2.
Filing B00217319-P2 reached an approved status.
Installation of sidewalk shed as per plans. sidewalk shed live load 300 psf, shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application. Filing B00217319-P3.
Filing B00217319-P3 reached an approved status.
Installation of 300kw emergency generator as required by code. Filing B00348342-I1.
Installation of 300 gallon integral fuel oil tank and 75 gallon day tank for the emergency generator. Filing B00348607-I1.
Installation of sidewalk shed as per plans. sidewalk shed live load 300 psf, shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application. Filing B00217319-P4.
Filing B00217319-P4 reached an approved status.
Filing B00348342-I1 reached an approved status.
Filing B00348607-I1 reached an approved status.
Installation of overhead protection and supported scaffold as per plans filed herewith. No change to use, egress or occupancy under this application. Filing B00433544-I1.
DOB lists a first permit date for B00433544-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00217319-P1 is “Approved.”
The latest status recorded for B00217319-P2 is “Approved.”
The latest status recorded for B00217319-P3 is “Approved.”
The latest status recorded for B00217319-P4 is “Approved.”
Filing for approval of interior work for educational spaces. Filing B00463970-I1.
Herewith filing for mechanical HVAC installation as alteration job type. Filing B00508617-I1.
Herewith filing for plumbing and sprinkler installation as alteration job type. Filing B00508723-I1.
Filing B00508617-I1 reached an approved status.
Filing B00508723-I1 reached an approved status.
Installation of sidewalk shed as per plans. sidewalk shed live load 300 psf, shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application. Filing B00217319-P5.
Filing B00217319-P5 reached an approved status.
The latest status recorded for B00217319-P5 is “Approved.”
Herewith filing for plumbing and sprinkler installation as alteration job type. Filing B00508723-P1.
Installation of overhead protection and supported scaffold as per plans filed herewith. No change to use, egress or occupancy under this application. Filing B00433544-P1.
Filing B00433544-P1 reached an approved status.
The latest status recorded for B00433544-P1 is “Approved.”
Filing B00508723-P1 reached an approved status.
The latest status recorded for B00508723-P1 is “Approved.”
Filing B00463970-I1 reached an approved status.
Installation of overhead protection and supported scaffold as per plans filed herewith. No change to use, egress or occupancy under this application. Filing B00433544-P2.
Filing B00433544-P2 reached an approved status.
The latest status recorded for B00433544-P2 is “Approved.”
Installation of overhead protection and supported scaffold as per plans filed herewith. No change to use, egress or occupancy under this application. Filing B00433544-P3.
Filing B00433544-P3 reached an approved status.
The latest status recorded for B00433544-P3 is “Approved.”
Installation of spyder crane in conjunction with nb 320978064. this application involves no change in use, occupancy or egress. Filing B00637462-I1.
Filing B00637462-I1 reached an approved status.
DOB lists a first permit date for B00637462-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00463970-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00433544-I1 is “Permit Issued.”
DOB lists a first permit date for B00508617-I1. That is not by itself confirmation of activity on site.
Installation of 300 gallon integral fuel oil tank and 75 gallon day tank for the emergency generator. Filing B00348607-P1.
Filing B00348607-P1 reached an approved status.
The latest status recorded for B00348607-P1 is “Approved.”
DOB lists a first permit date for B00348607-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00217319-I1.
The latest status recorded for B00217319-I1 is “LOC Issued.”
Installation of 300 gallon integral fuel oil tank and 75 gallon day tank for the emergency generator. Filing B00348607-P2.
Filing B00348607-P2 reached an approved status.
The latest status recorded for B00348607-P2 is “Approved.”
Installation of 300 gallon integral fuel oil tank and 75 gallon day tank for the emergency generator. Filing B00348607-P4.
Filing B00348607-P4 reached an approved status.
The latest status recorded for B00348607-P4 is “Approved.”
Filing for approval of interior work for educational spaces. Filing B00463970-P1.
Filing B00463970-P1 reached an approved status.
The latest status recorded for B00463970-P1 is “Approved.”
DOB lists a first permit date for B00508723-I1. That is not by itself confirmation of activity on site.
Herewith filing for plumbing and sprinkler installation as alteration job type. Filing B00508723-P2.
Filing B00508723-P2 reached an approved status.
The latest status recorded for B00508723-P2 is “Approved.”
DOB recorded a sign-off for B00290171-I1.
The latest status recorded for B00290171-I1 is “LOC Issued.”
DOB recorded a sign-off for B00637462-I1.
The latest status recorded for B00637462-I1 is “LOC Issued.”
DOB recorded a sign-off for B00508723-I1.
The latest status recorded for B00508723-I1 is “LOC Issued.”
The latest status recorded for B00634407-I1 is “Filing Withdrawn.”
DOB recorded a sign-off for B00348607-I1.
The latest status recorded for B00348607-I1 is “LOC Issued.”
DOB recorded a sign-off for B00508617-I1.
The latest status recorded for B00508617-I1 is “LOC Issued.”
DOB lists a first permit date for B00348342-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00348342-I1.
The latest status recorded for B00348342-I1 is “LOC Issued.”
DOB recorded a sign-off for B00463970-I1.
The latest status recorded for B00463970-I1 is “LOC Issued.”
Proposed interior renovation on partial 3rd floor. ceiling, flooring, partition works as per plan. no change in use, bulk, egress or occupancy. Filing B01451013-I1.
The latest status recorded for B01451013-I1 is “Plan Examiner Review.”
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application. Filing B01462270-I1.
DOB lists a first permit date for B01462270-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01462270-I1 is “Permit Entire.”