DOB filing B00079198-I1
Alteration filing at 415 Red Hook Lane
Building record · BIN 3425971
415 Red Hook Lane, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3425971
415 Red Hook Lane
Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn
A consolidated public-record view · updated Dec 28, 2020
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 21-story condominium built in 2015, with 108 homes, on a 8,958 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3425971. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 3 alteration filing. Its latest status categories are 2 recorded as completed, 1 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 415 Red Hook Lane.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of heavy duty sidewalk shed during building alteration, filed separately. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application. Filing B00079198-I1.
DOB lists a first permit date for B00079198-I1. That is not by itself confirmation of activity on site.
Installation of plywood fence, as per drawings. plywood fence shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application. Filing B00079207-I1.
DOB lists a first permit date for B00079207-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00079198-I1.
DOB recorded a sign-off for B00079207-I1.
Installation of construction fence. Filing B00272601-I1.
Filing B00272601-I1 reached an approved status.
DOB lists a first permit date for B00272601-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00272601-I1 is “Permit Entire.”
The latest status recorded for B00079198-I1 is “LOC Issued.”
The latest status recorded for B00079207-I1 is “LOC Issued.”