DOB filing B01443421-I1
Alteration filing at 3325 Neptune Avenue
Building record · BIN 3426147
3325 Neptune Avenue, Brooklyn, NY 11224
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 11 independently sourced records, including 9 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3426147
3325 Neptune Avenue
Coney Island-Sea Gate, Brooklyn
A consolidated public-record view · updated Aug 31, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 24-story elevator apartment building built in 1974, with 334 homes, on a 165,454 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 3, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 16 open notices on record for this building, out of 282 notices on file; the most recent was issued Aug 23, 2013.
Issued Aug 23, 2013
Issued Feb 7, 2000
Issued Feb 7, 2000
13 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3426147. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 11 alteration filing. Its latest status categories are 9 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 3325 Neptune Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 11 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Erect an illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. no change in use, egress or occupancy. Filing B00343332-I1.
Filing B00343332-I1 reached an approved status.
Mechanical work related to the Alt 2 GC as shown on drawings filed herewith. No change of use, egress or occupancy. Filing B00346906-I1.
Plumbing work related to the Alt 2 GC as shown on drawings filed herewith. No change of use, egress or occupancy. Filing B00346907-I1.
Filing B00346906-I1 reached an approved status.
Filing B00346907-I1 reached an approved status.
DOB lists a first permit date for B00343332-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00343332-I1.
Mechanical work related to the Alt 2 job #340731523 to be filed through DOB NOW as shown on drawings filed herewith. No change of use, egress or occupancy. Filing B00349747-I1.
Plumbing work related to the Alt 2 #340731523 to be filed through DOB NOW as shown on drawings filed herewith. No change of use, egress or occupancy. Filing B00349749-I1.
Mechanical work related to the Alt 2 #340731596 as shown on drawings filed herewith. No change of use, egress or occupancy. Filing B00349756-I1.
Filing B00349756-I1 reached an approved status.
Plumbing work related to the Alt 2 #340731596 as shown on drawings filed herewith. No change of use, egress or occupancy. Filing B00349757-I1.
Filing B00349757-I1 reached an approved status.
Filing B00349747-I1 reached an approved status.
Filing B00349749-I1 reached an approved status.
DOB lists a first permit date for B00349749-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00349757-I1. That is not by itself confirmation of activity on site.
Filing to replace existing sprinkler heads in refuse system. work to supersede previous job #300256657 as shown on drawings filed herewith. no change in use, egress or occupancy. Filing B00358363-I1.
Filing B00358363-I1 reached an approved status.
DOB lists a first permit date for B00349747-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00349756-I1. That is not by itself confirmation of activity on site.
Mechanical work related to the Alt 2 GC as shown on drawings filed herewith. No change of use, egress or occupancy. Filing B00346906-P1.
Plumbing work related to the Alt 2 GC as shown on drawings filed herewith. No change of use, egress or occupancy. Filing B00346907-P1.
Filing B00346907-P1 reached an approved status.
Filing B00346906-P1 reached an approved status.
DOB lists a first permit date for B00346907-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00358363-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00343332-I1 is “LOC Issued.”
The latest status recorded for B00346906-P1 is “Approved.”
The latest status recorded for B00346907-I1 is “Permit Entire.”
The latest status recorded for B00346907-P1 is “Approved.”
The latest status recorded for B00349747-I1 is “Permit Entire.”
The latest status recorded for B00349749-I1 is “Permit Entire.”
The latest status recorded for B00349756-I1 is “Permit Entire.”
The latest status recorded for B00349757-I1 is “Permit Entire.”
DOB lists a first permit date for B00346906-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00346906-I1 is “Permit Entire.”
DOB recorded a sign-off for B00358363-I1.
The latest status recorded for B00358363-I1 is “LOC Issued.”
Suspended Scaffold installation for facade repairs and inspections. Filing B01443421-I1.
DOB lists a first permit date for B01443421-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01443421-I1 is “Permit Entire.”