DOB filing B01278320-I1
Alteration filing at 420 Albee Square
Building record · BIN 3426190
420 Albee Square, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 48 independently sourced records, including 23 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3426190
420 Albee Square
Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn
A consolidated public-record view · updated Aug 31, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 35-story condominium built in 2025, on a 18,600 sq ft lot.
Owner of record
EVERSTONE DU LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 1 open notice on record for this building, out of 46 notices on file; the most recent was issued Aug 16, 1993.
Issued Aug 16, 1993
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3426190. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 48 alteration filing. Its latest status categories are 25 recorded as completed, 23 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 420 Albee Square.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 48 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Filing for installation of curb cut, in conjunction with nb #321191027 and bpp #340562395. Filing B00019151-I1.
Filing B00019151-I1 reached an approved status.
Installation of fence as per plans. no change in use, egress or occupancy. Filing B00098269-I1.
DOB lists a first permit date for B00098269-I1. That is not by itself confirmation of activity on site.
Installation of heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00097442-I1.
DOB lists a first permit date for B00097442-I1. That is not by itself confirmation of activity on site.
Installation of pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00190805-I1.
DOB lists a first permit date for B00190805-I1. That is not by itself confirmation of activity on site.
Installation of pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00199540-I1.
DOB lists a first permit date for B00199540-I1. That is not by itself confirmation of activity on site.
Installation of pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00281744-I1.
Installation of fence as per plans. no change in use, egress or occupancy. Filing B00281736-I1.
DOB lists a first permit date for B00281744-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00281736-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00281736-I1.
Installation of pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00279342-I1.
DOB lists a first permit date for B00279342-I1. That is not by itself confirmation of activity on site.
Boiler application being filed in conjunctionwith new building. Filing B00302221-I1.
Installation of fuel tank for emergency generator in conjunction with new building. Filing B00302297-I1.
Filing B00302297-I1 reached an approved status.
Filing B00302221-I1 reached an approved status.
DOB recorded a sign-off for B00190805-I1.
DOB recorded a sign-off for B00199540-I1.
Install illuminated d/f blade sign (1 wsq). Filing B00347101-I1.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300psf. Filing B00368412-I1.
DOB lists a first permit date for B00368412-I1. That is not by itself confirmation of activity on site.
Filing B00347101-I1 reached an approved status.
Pipe scaffolding installation per plan, no change in egress, use or occupancy. Filing B00375522-I1.
DOB lists a first permit date for B00375522-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00302221-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00302297-I1. That is not by itself confirmation of activity on site.
Installation of temporary 33' high pipe scaffold originating (off roof) for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code. Filing B00381643-I1.
DOB lists a first permit date for B00381643-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00347101-I1. That is not by itself confirmation of activity on site.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300psf. Filing B00368412-P1.
Filing B00368412-P1 reached an approved status.
Boiler application being filed in conjunctionwith new building. Filing B00302221-P3.
Filing B00302221-P3 reached an approved status.
Installation of temporary 33' high pipe scaffold originating (off roof) for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code. Filing B00381643-P1.
Filing B00381643-P1 reached an approved status.
Installation of temporary 33' high pipe scaffold originating (off roof) for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code. Filing B00381643-P2.
Filing B00381643-P2 reached an approved status.
Installation of temporary construction fence as per plans. no change in use, occupancy or egress. Filing B00439536-I1.
DOB lists a first permit date for B00439536-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00190805-I1 is “LOC Issued.”
The latest status recorded for B00199540-I1 is “LOC Issued.”
The latest status recorded for B00281736-I1 is “LOC Issued.”
The latest status recorded for B00302221-P3 is “Approved.”
The latest status recorded for B00368412-P1 is “Approved.”
The latest status recorded for B00381643-P1 is “Approved.”
The latest status recorded for B00381643-P2 is “Approved.”
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300psf. Filing B00368412-P2.
Installation of temporary 33' high pipe scaffold originating (off roof) for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code. Filing B00381643-P3.
Filing B00381643-P3 reached an approved status.
The latest status recorded for B00381643-P3 is “Approved.”
Filing B00368412-P2 reached an approved status.
The latest status recorded for B00368412-P2 is “Approved.”
DOB recorded a sign-off for B00097442-I1.
The latest status recorded for B00097442-I1 is “LOC Issued.”
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300psf. Filing B00368412-P3.
Filing B00368412-P3 reached an approved status.
The latest status recorded for B00368412-P3 is “Approved.”
Installation of temporary 33' high pipe scaffold originating (off roof) for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code. Filing B00381643-P4.
Filing B00381643-P4 reached an approved status.
The latest status recorded for B00381643-P4 is “Approved.”
Installation of temporary 33' high pipe scaffold originating (off roof) for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code. Filing B00381643-P5.
Filing B00381643-P5 reached an approved status.
The latest status recorded for B00381643-P5 is “Approved.”
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300psf. Filing B00368412-P4.
Filing B00368412-P4 reached an approved status.
The latest status recorded for B00368412-P4 is “Approved.”
170172 - herewith filing atl-2 ot arch work type for school fit-out floors 1-6. Filing B00457502-I1.
Installation of temporary 33' high pipe scaffold originating (off roof) for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code. Filing B00381643-P6.
Filing B00381643-P6 reached an approved status.
The latest status recorded for B00381643-P6 is “Approved.”
Filing B00457502-I1 reached an approved status.
Herewith filing mechanical work type associated with the School fit-out space. Filing B00408471-I1.
170172 - Herewith filing Sprinkler Fitout work for School fittout. Filing B00408285-I1.
170172 -herewith filing plumbing work type for school fit-out space, in conjunction nb. Filing B00408579-I1.
Filing B00408471-I1 reached an approved status.
Filing B00408579-I1 reached an approved status.
Mechanical work being filed in conjunction with tenant fit-out spaces on the 14th and 15th floors. Filing B00556139-I1.
Filing B00556139-I1 reached an approved status.
Architectural work being filed for tenant fit-out spaces on the 14th and 15th floors. Work to include installation of partitions, doors, lighting, and finishes. No change to use, egress, or occupancy. Filing B00556751-I1.
Filing B00556751-I1 reached an approved status.
Sprinkler work being filed in conjunction with tenant fit-out spaces on the 14th and 15th floors. Filing B00555872-I1.
Plumbing work being filed in conjunction with tenant fit-out spaces on the 14th and 15th floors. Filing B00556664-I1.
Filing B00556664-I1 reached an approved status.
Filing B00555872-I1 reached an approved status.
Filing B00408285-I1 reached an approved status.
Use of Existing Davit for suspended scaffold work as per plans filed herewith.. Filing B00586756-I1.
DOB lists a first permit date for B00556664-I1. That is not by itself confirmation of activity on site.
Filing B00586756-I1 reached an approved status.
DOB lists a first permit date for B00556751-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00586756-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00556139-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00555872-I1. That is not by itself confirmation of activity on site.
Installation of temporary roof protection and overhead protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2014 the ny building code. Filing B00626430-I1.
DOB lists a first permit date for B00626430-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00408471-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00408285-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00457502-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00408579-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00381643-I1.
The latest status recorded for B00381643-I1 is “LOC Issued.”
Architectural work being filed for tenant fit-out spaces on the 14th and 15th floors. Work to include installation of partitions, doors, lighting, and finishes. No change to use, egress, or occupancy. Filing B00556751-P1.
Sprinkler work being filed in conjunction with tenant fit-out spaces on the 14th and 15th floors. Filing B00555872-P1.
Mechanical work being filed in conjunction with tenant fit-out spaces on the 14th and 15th floors. Filing B00556139-P1.
Filing B00556751-P1 reached an approved status.
The latest status recorded for B00556751-P1 is “Approved.”
Filing B00555872-P1 reached an approved status.
The latest status recorded for B00555872-P1 is “Approved.”
Filing B00556139-P1 reached an approved status.
The latest status recorded for B00556139-P1 is “Approved.”
DOB recorded a sign-off for B00556664-I1.
The latest status recorded for B00556664-I1 is “LOC Issued.”
DOB recorded a sign-off for B00555872-I1.
The latest status recorded for B00555872-I1 is “LOC Issued.”
DOB recorded a sign-off for B00556751-I1.
The latest status recorded for B00556751-I1 is “LOC Issued.”
170172 - herewith filing atl-2 ot arch work type for school fit-out floors 1-6. Filing B00457502-P1.
Filing B00457502-P1 reached an approved status.
The latest status recorded for B00457502-P1 is “Approved.”
Herewith filing mechanical work type associated with the School fit-out space. Filing B00408471-P1.
Filing B00408471-P1 reached an approved status.
The latest status recorded for B00408471-P1 is “Approved.”
DOB recorded a sign-off for B00368412-I1.
The latest status recorded for B00368412-I1 is “LOC Issued.”
DOB recorded a sign-off for B00098269-I1.
The latest status recorded for B00098269-I1 is “LOC Issued.”
DOB recorded a sign-off for B00626430-I1.
The latest status recorded for B00626430-I1 is “LOC Issued.”
DOB recorded a sign-off for B00281744-I1.
The latest status recorded for B00281744-I1 is “LOC Issued.”
DOB recorded a sign-off for B00439536-I1.
The latest status recorded for B00439536-I1 is “LOC Issued.”
DOB recorded a sign-off for B00556139-I1.
The latest status recorded for B00556139-I1 is “LOC Issued.”
DOB lists a first permit date for B00019151-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00019151-I1 is “Permit Entire.”
DOB recorded a sign-off for B00375522-I1.
The latest status recorded for B00375522-I1 is “LOC Issued.”
DOB recorded a sign-off for B00279342-I1.
The latest status recorded for B00279342-I1 is “LOC Issued.”
DOB recorded a sign-off for B00347101-I1.
The latest status recorded for B00347101-I1 is “LOC Issued.”
DOB recorded a sign-off for B00586756-I1.
The latest status recorded for B00586756-I1 is “LOC Issued.”
170172 -herewith filing plumbing work type for school fit-out space, in conjunction nb. Filing B00408579-P1.
Filing B00408579-P1 reached an approved status.
The latest status recorded for B00408579-P1 is “Approved.”
170172 - herewith filing atl-2 ot arch work type for school fit-out floors 1-6. Filing B00457502-P2.
Filing B00457502-P2 reached an approved status.
The latest status recorded for B00457502-P2 is “Approved.”
DOB recorded a sign-off for B00302221-I1.
The latest status recorded for B00302221-I1 is “LOC Issued.”
DOB recorded a sign-off for B00302297-I1.
The latest status recorded for B00302297-I1 is “LOC Issued.”
170172 - Herewith filing Sprinkler Fitout work for School fittout. Filing B00408285-P1.
Filing B00408285-P1 reached an approved status.
The latest status recorded for B00408285-P1 is “Approved.”
Herewith filing mechanical work type associated with the School fit-out space. Filing B00408471-P2.
Filing B00408471-P2 reached an approved status.
DOB recorded a sign-off for B00408285-I1.
The latest status recorded for B00408579-I1 is “Permit Entire.”
The latest status recorded for B00408285-I1 is “LOC Issued.”
The latest status recorded for B00408471-P2 is “Approved.”
DOB recorded a sign-off for B00457502-I1.
The latest status recorded for B00457502-I1 is “LOC Issued.”
The latest status recorded for B00408471-I1 is “Permit Entire.”
Installation of sprinklers heads on floor 001. no change to egress, use, or occupancy. Filing B01367260-S2.
Filing B01367260-S2 reached an approved status.
Plumbing application for new water piping and 24 fixtures. no change to egress, use, or occupancy. Filing B01367260-S1.
Filing B01367260-S1 reached an approved status.
Alteration for interior work to non-bearing partitions at first floor. Filing B01278320-I1.
Filing B01278320-I1 reached an approved status.
DOB lists a first permit date for B01278320-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B01367260-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B01367260-S1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B01367260-S1.
The latest status recorded for B01367260-S1 is “LOC Issued.”
DOB recorded a sign-off for B01278320-I1.
The latest status recorded for B01278320-I1 is “LOC Issued.”
DOB recorded a sign-off for B01367260-S2.
The latest status recorded for B01367260-S2 is “LOC Issued.”