Building record · BIN 3427351

2953 Brighton 6 Street

2953 Brighton 6 Street, Brooklyn, NY 11235

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 31 independently sourced records, including 27 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3427351

2953 Brighton 6 Street

Brighton Beach, Brooklyn

A consolidated public-record view · updated Aug 7, 2026

DOB filings
31
Active-status
27
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings31
Open or active-status records27
First included filingMay 17, 2021
Latest recorded changeAug 7, 2026

The lot

What is already here?

The lot holds a 5-story educational building built in 1937, on a 75,000 sq ft lot.

  1. Floors 2–5Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as public facilities and institutions.
  • Street levelPublic facilities and institutions
  • Above the southern skylineFrom about floor 11 — the tallest thing within 60 m to the south is 32.9 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 22.9 m over 5 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1937
Last altered
2022
Floors
5
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
R6
Lot area
75,000 sq ft
Building area
138,910 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3427351. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 31 alteration filing. Its latest status categories are 27 approved, 4 closed or withdrawn. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
May 17, 2021
Latest recorded change
Aug 7, 2026
Highest proposed story count
4 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 2953 Brighton 6 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 31 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Mechanical application for new 4-story school building, including pipe and ductwork and installation of HVAC units. Filing B00482786-S1.

    01
  2. Alteration filed

    Mechanical application for new 4-story school building, including pipe and ductwork and installation of HVAC units. Filing B00481493-I1.

    02
  3. Alteration filed

    Filing of plumbing, sprinkler and standpipe application for a proposed new 4-story school building. Filing B00482786-I1.

    03
  4. Alteration filed

    P.s. 253-k proposed sprinkler and standpipe system for a new 4-story school building. Filing B00587305-I1.

    04
  5. Alteration filed

    P.s. 253-k: subsequent filing of plumbing work type for a proposed new 4-tory school building. all fixtures being installed in the building and associated piping. Filing B00587305-S1.

    05
  6. Alteration filed

    P.s. 253-k: subsequent filing of plumbing-civil work type for a new 4-story school building. Filing B00587305-S2.

    06
  7. Alteration filed

    Subsequent boiler application. Filing B00587305-S7.

    07
  8. Alteration filed

    P.S. 253-K: PROPOSED 15' CURB CUT APPLICATION LOCATED AT 6th BRIGHTON STREET. Filing B00617248-I1.

    08
  9. Alteration approved

    Filing B00587305-I1 reached an approved status.

    09
  10. Alteration approved

    Filing B00587305-S7 reached an approved status.

    010
  11. Alteration approved

    Filing B00587305-S1 reached an approved status.

    011
  12. Alteration approved

    Filing B00587305-S2 reached an approved status.

    012
  13. Alteration approved

    Filing B00482786-S1 reached an approved status.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for B00587305-S1. That is not by itself confirmation of activity on site.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for B00587305-S2. That is not by itself confirmation of activity on site.

    015
  16. Alteration approved

    Filing B00617248-I1 reached an approved status.

    016
  17. Alteration filed

    P.s. 253-k proposed sprinkler and standpipe system for a new 4-story school building. Filing B00587305-P1.

    017
  18. Alteration approved

    Filing B00587305-P1 reached an approved status.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for B00587305-I1. That is not by itself confirmation of activity on site.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for B00587305-S7. That is not by itself confirmation of activity on site.

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for B00482786-S1. That is not by itself confirmation of activity on site.

    021
  22. Alteration filed

    Mechanical application for new 4-story school building, including pipe and ductwork and installation of HVAC units. Filing B00482786-P1.

    022
  23. Alteration filed

    P.s. 253-q: subsequent filing of plumbing work type for a proposed new 4-tory school building. all fixtures being installed in the building and associated piping. Filing B00587305-P2.

    023
  24. Alteration approved

    Filing B00587305-P2 reached an approved status.

    024
  25. Alteration filed

    P.s. 253-q: subsequent filing of plumbing work type for a proposed new 4-tory school building. all fixtures being installed in the building and associated piping. Filing B00587305-P3.

    025
  26. Alteration approved

    Filing B00587305-P3 reached an approved status.

    026
  27. Alteration now closed

    The latest status recorded for B00481493-I1 is “Filing Withdrawn.”

    027
  28. Alteration now closed

    The latest status recorded for B00482786-I1 is “Filing Withdrawn.”

    028
  29. Alteration now approved

    The latest status recorded for B00587305-P1 is “Approved.”

    029
  30. Alteration now approved

    The latest status recorded for B00587305-P2 is “Approved.”

    030
  31. Alteration now approved

    The latest status recorded for B00587305-P3 is “Approved.”

    031
  32. Alteration filed

    P.s. 253-k proposed sprinkler and standpipe system for a new 4-story school building. Filing B00587305-P6.

    032
  33. Alteration filed

    Mechanical application for new 4-story school building, including pipe and ductwork and installation of HVAC units. Filing B00482786-P2.

    033
  34. Alteration approved

    Filing B00482786-P2 reached an approved status.

    034
  35. Alteration now approved

    The latest status recorded for B00482786-P2 is “Approved.”

    035
  36. Alteration approved

    Filing B00587305-P6 reached an approved status.

    036
  37. Alteration now approved

    The latest status recorded for B00587305-P6 is “Approved.”

    037
  38. Alteration filed

    P.s. 253-q: subsequent filing of plumbing work type for a proposed new 4-tory school building. all fixtures being installed in the building and associated piping. Filing B00587305-P5.

    038
  39. Alteration filed

    P.s. 253-k: boiler application for a new 4-story school building. Filing B00587305-P4.

    039
  40. Alteration filed

    P.s. 253-k: installation of one boiler unit for a new 4-story school building. Filing B00587305-S8.

    040
  41. Alteration approved

    Filing B00587305-P4 reached an approved status.

    041
  42. Alteration now approved

    The latest status recorded for B00587305-P4 is “Approved.”

    042
  43. Alteration approved

    Filing B00587305-P5 reached an approved status.

    043
  44. Alteration now approved

    The latest status recorded for B00587305-P5 is “Approved.”

    044
  45. Alteration filed

    Subsequent boiler application. Filing B00587305-P8.

    045
  46. Alteration approved

    Filing B00587305-P8 reached an approved status.

    046
  47. Alteration now approved

    The latest status recorded for B00587305-P8 is “Approved.”

    047
  48. Alteration filed

    P.s. 253-q: subsequent filing of plumbing work type for a proposed new 4-tory school building. all fixtures being installed in the building and associated piping. Filing B00587305-P7.

    048
  49. Alteration approved

    Filing B00587305-S8 reached an approved status.

    049
  50. Alteration filed

    P.s. 253-k proposed sprinkler and standpipe system for a new 4-story school building. Filing B00587305-P9.

    050
  51. Alteration filed

    P.s. 253-k: installation of one boiler unit for a new 4-story school building. Filing B00587305-A2.

    051
  52. Alteration approved

    Filing B00587305-A2 reached an approved status.

    052
  53. Alteration now approved

    The latest status recorded for B00587305-A2 is “Approved.”

    053
  54. Alteration approved

    Filing B00587305-P7 reached an approved status.

    054
  55. Alteration now approved

    The latest status recorded for B00587305-P7 is “Approved.”

    055
  56. Alteration approved

    Filing B00587305-P9 reached an approved status.

    056
  57. Alteration now approved

    The latest status recorded for B00587305-P9 is “Approved.”

    057
  58. Alteration filed

    P.s. 253-k: installation of one boiler unit for a new 4-story school building. Filing B00587305-A4.

    058
  59. Alteration filed

    Subsequent boiler application. Filing B00587305-A3.

    059
  60. Alteration approved

    Filing B00587305-A3 reached an approved status.

    060
  61. Alteration now approved

    The latest status recorded for B00587305-A3 is “Approved.”

    061
  62. Alteration approved

    Filing B00587305-A4 reached an approved status.

    062
  63. Alteration now approved

    The latest status recorded for B00587305-A4 is “Approved.”

    063
  64. Alteration now approved

    The latest status recorded for B00587305-I1 is “Permit Entire.”

    064
  65. Alteration filed

    P.s. 253-q: subsequent filing of plumbing work type for a proposed new 4-tory school building. all fixtures being installed in the building and associated piping. Filing B00587305-A5.

    065
  66. Alteration filed

    Subsequent boiler application. Filing B00587305-A6.

    066
  67. Alteration filed

    P.s. 253-k: installation of one boiler unit for a new 4-story school building. Filing B00587305-A7.

    067
  68. Alteration approved

    Filing B00587305-A6 reached an approved status.

    068
  69. Alteration now approved

    The latest status recorded for B00587305-A6 is “Approved.”

    069
  70. Alteration approved

    Filing B00587305-A7 reached an approved status.

    070
  71. Alteration now approved

    The latest status recorded for B00587305-A7 is “Approved.”

    071
  72. Alteration now approved

    The latest status recorded for B00587305-S7 is “Permit Entire.”

    072
  73. Permit recorded for alteration

    DOB lists a first permit date for B00587305-S8. That is not by itself confirmation of activity on site.

    073
  74. Alteration now approved

    The latest status recorded for B00587305-S8 is “Permit Entire.”

    074
  75. Alteration approved

    Filing B00587305-A5 reached an approved status.

    075
  76. Alteration now approved

    The latest status recorded for B00587305-A5 is “Approved.”

    076
  77. Alteration filed

    Mechanical application for new 4-story school building, including pipe and ductwork and installation of HVAC units. Filing B00482786-P3.

    077
  78. Alteration filed

    P.s. 253-k: subsequent filing of plumbing work type for a proposed new 4-tory school building. all fixtures being installed in the building and associated piping. Filing B00587305-A8.

    078
  79. Alteration approved

    Filing B00587305-A8 reached an approved status.

    079
  80. Alteration now approved

    The latest status recorded for B00587305-A8 is “Approved.”

    080
  81. Alteration filed

    Mechanical application for new 4-story school building, including pipe and ductwork and installation of HVAC units. Filing B00482786-P4.

    081
  82. Alteration now closed

    The latest status recorded for B00482786-P3 is “Filing Withdrawn.”

    082
  83. Alteration now closed

    The latest status recorded for B00482786-P1 is “Filing Withdrawn.”

    083
  84. Alteration now approved

    The latest status recorded for B00482786-S1 is “Permit Entire.”

    084
  85. Alteration approved

    Filing B00482786-P4 reached an approved status.

    085
  86. Alteration now approved

    The latest status recorded for B00482786-P4 is “Approved.”

    086
  87. Alteration filed

    P.S. 253-K: Existing fixtures and rough-ins to be removed in bathroom - valve and cap for new work. New fixtures to be connected to new rough-ins. Filing B00587305-Z2.

    087
  88. Alteration filed

    PS.S. 253-K: Resize shower basin and partitions. Relocate toilet room accessories and grab bars. Path and finish partitions to match existing. Filing B00587305-Z1.

    088
  89. Alteration approved

    Filing B00587305-Z1 reached an approved status.

    089
  90. Alteration approved

    Filing B00587305-Z2 reached an approved status.

    090
  91. Permit recorded for alteration

    DOB lists a first permit date for B00587305-Z2. That is not by itself confirmation of activity on site.

    091
  92. Alteration now approved

    The latest status recorded for B00587305-Z2 is “Permit Entire.”

    092
  93. Permit recorded for alteration

    DOB lists a first permit date for B00587305-Z1. That is not by itself confirmation of activity on site.

    093
  94. Alteration now approved

    The latest status recorded for B00587305-Z1 is “Permit Entire.”

    094
  95. Alteration now approved

    The latest status recorded for B00587305-S1 is “Permit Entire.”

    095
  96. Alteration now approved

    The latest status recorded for B00587305-S2 is “Permit Entire.”

    096
  97. Alteration now approved

    The latest status recorded for B00617248-I1 is “Approved.”

    097