Building record · BIN 3428601

595 Dean Street

595 Dean Street, Brooklyn, NY 11238

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 38 independently sourced records, including 23 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3428601

595 Dean Street

Prospect Heights, Brooklyn

A consolidated public-record view · updated Aug 15, 2024

DOB filings
38
Active-status
23
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings38
Open or active-status records23
First included filingDec 11, 2019
Latest recorded changeAug 15, 2024

The lot

What is already here?

  1. Floors 2–23Nothing on record
  2. Floor 1Street levelStreet level.
  • Street levelThe way in
  • Above the southern skylineFrom about floor 30 — the tallest thing within 60 m to the south is 87.5 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 70.1 m over about 23 floors, counted at three metres each because the city publishes the height and not the number. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.

The apartments

556 condominium apartments are assessed on this block, and the typical one is 770 sq ft (72 m²). They run from 38 to 297 m².

The city values the typical one at $254,570. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

15 apartments on this tax block changed hands in the year the city last published, at a median of $1,028,000, from 300,000 to 2,589,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

PACIFIC PARK CONSERVANCY, INC.

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Violation record

Are there open violations here?

No open violations are recorded for this building. 18 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3428601. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 38 alteration filing. Its latest status categories are 15 recorded as completed, 23 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Dec 11, 2019
Latest recorded change
Aug 15, 2024
Highest proposed story count
29 stories
Highest proposed unit count
798 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 595 Dean Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 38 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of 30' curb cut on Dean Street (includes 2'6" splays on each side. Application filed in conjunction with NB #321595403. Filing B00269739-I1.

    01
  2. Alteration filed

    Installation of 15' curb cut on Dean Street (includes 2'6" splays on each side. Application filed in conjunction with NB #321595403. Filing B00269755-I1.

    02
  3. Alteration filed

    Structural work in conjunction with new building construction. NB filed under 321595403. Filing B00232980-I1.

    03
  4. Alteration filed

    Plumbing work in conjunction with NB Construction. NB filed under 321595403. Filing B00233044-I1.

    04
  5. Alteration approved

    Filing B00233044-I1 reached an approved status.

    05
  6. Alteration filed

    Mechanical work filed in conjunction with NB Construction. NB Filed under 321595403. Energy Model Provided under NB BIS Application # 321595403./. Filing B00233023-I1.

    06
  7. Alteration approved

    Filing B00232980-I1 reached an approved status.

    07
  8. Alteration filed

    Installation of a temporary construction fence as per plans in conjunction with nb construction. no change in use, egress or occupancy. fence to comply with chapter 33 of NYC building code of 2014. Filing B00345823-I1.

    08
  9. Alteration approved

    Filing B00345823-I1 reached an approved status.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for B00345823-I1. That is not by itself confirmation of activity on site.

    010
  11. Alteration approved

    Filing B00233023-I1 reached an approved status.

    011
  12. Alteration filed

    Plumbing work in conjunction with NB Construction. NB filed under 321595403. Filing B00233044-P1.

    012
  13. Alteration approved

    Filing B00233044-P1 reached an approved status.

    013
  14. Alteration filed

    Mechanical work filed in conjunction with NB Construction. NB Filed under 321595403. Energy Model Provided under NB BIS Application # 321595403./. Filing B00233023-P1.

    014
  15. Alteration filed

    Installation of sprinkler/standpipe system in conjunction with NB #321595403. Filing B00354436-I1.

    015
  16. Alteration approved

    Filing B00233023-P1 reached an approved status.

    016
  17. Alteration filed

    Installation of temporary standpipe in conjunction with NB construction. NB filed under 321595403. Filing B00389877-I1.

    017
  18. Alteration filed

    Plumbing work in conjunction with NB Construction. NB filed under 321595403. Filing B00233044-P2.

    018
  19. Alteration approved

    Filing B00233044-P2 reached an approved status.

    019
  20. Alteration approved

    Filing B00389877-I1 reached an approved status.

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for B00389877-I1. That is not by itself confirmation of activity on site.

    021
  22. Alteration approved

    Filing B00269739-I1 reached an approved status.

    022
  23. Alteration approved

    Filing B00269755-I1 reached an approved status.

    023
  24. Alteration approved

    Filing B00354436-I1 reached an approved status.

    024
  25. Alteration filed

    Installation of a heavy duty sidewalk shed as per plans in conjunction with nb construction. no change in use, egress or occupancy. sidewalk shed shall comply with 2014 NYC building code, chapter 33. Filing B00426804-I1.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for B00426804-I1. That is not by itself confirmation of activity on site.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for B00233044-I1. That is not by itself confirmation of activity on site.

    027
  28. Alteration now approved

    The latest status recorded for B00233023-P1 is “Approved.”

    028
  29. Alteration filed

    Installation of a temporary construction fence as per plans in conjunction with nb construction. no change in use, egress or occupancy. fence to comply with chapter 33 of NYC building code of 2014. Filing B00345823-P1.

    029
  30. Alteration approved

    Filing B00345823-P1 reached an approved status.

    030
  31. Alteration now approved

    The latest status recorded for B00345823-P1 is “Approved.”

    031
  32. Permit recorded for alteration

    DOB lists a first permit date for B00232980-I1. That is not by itself confirmation of activity on site.

    032
  33. Permit recorded for alteration

    DOB lists a first permit date for B00233023-I1. That is not by itself confirmation of activity on site.

    033
  34. Alteration filed

    Installation of a temporary construction fence as per plans in conjunction with nb construction. no change in use, egress or occupancy. fence to comply with chapter 33 of NYC building code of 2014. Filing B00345823-P2.

    034
  35. Alteration approved

    Filing B00345823-P2 reached an approved status.

    035
  36. Alteration now approved

    The latest status recorded for B00345823-P2 is “Approved.”

    036
  37. Alteration filed

    Plumbing work in conjunction with NB Construction. NB filed under 321595403. Filing B00233044-P3.

    037
  38. Permit recorded for alteration

    DOB lists a first permit date for B00354436-I1. That is not by itself confirmation of activity on site.

    038
  39. Alteration approved

    Filing B00233044-P3 reached an approved status.

    039
  40. Alteration now approved

    The latest status recorded for B00233044-P3 is “Approved.”

    040
  41. Alteration filed

    Installation of sprinkler/standpipe system in conjunction with NB #321595403. Filing B00354436-P1.

    041
  42. Alteration approved

    Filing B00354436-P1 reached an approved status.

    042
  43. Alteration now approved

    The latest status recorded for B00354436-P1 is “Approved.”

    043
  44. Alteration filed

    Installation of temporary scaffold as per drawings. scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00595492-I1.

    044
  45. Alteration filed

    Installation of temporary suspended scaffold per drawings. suspended scaffold shall comply with ch 33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00595498-I1.

    045
  46. Permit recorded for alteration

    DOB lists a first permit date for B00269739-I1. That is not by itself confirmation of activity on site.

    046
  47. Permit recorded for alteration

    DOB lists a first permit date for B00269755-I1. That is not by itself confirmation of activity on site.

    047
  48. Permit recorded for alteration

    DOB lists a first permit date for B00595492-I1. That is not by itself confirmation of activity on site.

    048
  49. Permit recorded for alteration

    DOB lists a first permit date for B00595498-I1. That is not by itself confirmation of activity on site.

    049
  50. Alteration filed

    Install one tegogen cogen unit and one diesel generator per plans. install new chimney to vent five (5) gas-fired boilers. no change in use, egress or occupancy. Filing B00632892-I1.

    050
  51. Alteration filed

    Install five (5) hydronic heating heating gas boilers, one tegogen cogen unit. no change in use, egress or occupancy. Filing B00632862-I1.

    051
  52. Alteration filed

    Install one above-ground fuel oil storage tank to serve one diesel generator on roof per plans. no change in use, egress or occupancy. Filing B00632878-I1.

    052
  53. Alteration approved

    Filing B00632892-I1 reached an approved status.

    053
  54. Alteration approved

    Filing B00632862-I1 reached an approved status.

    054
  55. Alteration approved

    Filing B00632878-I1 reached an approved status.

    055
  56. Permit recorded for alteration

    DOB lists a first permit date for B00632862-I1. That is not by itself confirmation of activity on site.

    056
  57. Permit recorded for alteration

    DOB lists a first permit date for B00632892-I1. That is not by itself confirmation of activity on site.

    057
  58. Alteration filed

    Installation of suspended scaffold as shown on plans. Filing B00641609-I1.

    058
  59. Permit recorded for alteration

    DOB lists a first permit date for B00641609-I1. That is not by itself confirmation of activity on site.

    059
  60. Alteration filed

    Plumbing work in conjunction with NB Construction. NB filed under 321595403. Filing B00233044-P5.

    060
  61. Permit recorded for alteration

    DOB lists a first permit date for B00632878-I1. That is not by itself confirmation of activity on site.

    061
  62. Alteration approved

    Filing B00233044-P5 reached an approved status.

    062
  63. Alteration now approved

    The latest status recorded for B00233044-P5 is “Approved.”

    063
  64. Alteration filed

    Installation of sprinkler/standpipe system in conjunction with NB #321595403. Filing B00354436-P2.

    064
  65. Alteration approved

    Filing B00354436-P2 reached an approved status.

    065
  66. Alteration now approved

    The latest status recorded for B00354436-P2 is “Approved.”

    066
  67. Alteration filed

    Install one above-ground fuel oil storage tank to serve one diesel generator on roof per plans. no change in use, egress or occupancy. Filing B00632878-P1.

    067
  68. Alteration approved

    Filing B00632878-P1 reached an approved status.

    068
  69. Alteration now approved

    The latest status recorded for B00632878-P1 is “Approved.”

    069
  70. Alteration filed

    Install five (5) hydronic heating heating gas boilers, one tegogen cogen unit. no change in use, egress or occupancy. Filing B00632862-P1.

    070
  71. Alteration approved

    Filing B00632862-P1 reached an approved status.

    071
  72. Alteration now approved

    The latest status recorded for B00632862-P1 is “Approved.”

    072
  73. Alteration filed

    Install five (5) hydronic heating heating gas boilers, one tegogen cogen unit. no change in use, egress or occupancy. Filing B00632862-P2.

    073
  74. Alteration approved

    Filing B00632862-P2 reached an approved status.

    074
  75. Alteration now approved

    The latest status recorded for B00632862-P2 is “Approved.”

    075
  76. Alteration filed

    Plumbing work in conjunction with NB Construction. NB filed under 321595403. Filing B00233044-P6.

    076
  77. Alteration approved

    Filing B00233044-P6 reached an approved status.

    077
  78. Alteration now approved

    The latest status recorded for B00233044-P6 is “Approved.”

    078
  79. Alteration signed off

    DOB recorded a sign-off for B00595492-I1.

    079
  80. Alteration now completed

    The latest status recorded for B00595492-I1 is “LOC Issued.”

    080
  81. Alteration signed off

    DOB recorded a sign-off for B00595498-I1.

    081
  82. Alteration now completed

    The latest status recorded for B00595498-I1 is “LOC Issued.”

    082
  83. Alteration filed

    Install one tegogen cogen unit and one diesel generator per plans. install new chimney to vent five (5) gas-fired boilers. no change in use, egress or occupancy. Filing B00632892-P1.

    083
  84. Alteration approved

    Filing B00632892-P1 reached an approved status.

    084
  85. Alteration now approved

    The latest status recorded for B00632892-P1 is “Approved.”

    085
  86. Alteration filed

    Structural work in conjunction with new building construction. NB filed under 321595403. Filing B00232980-P1.

    086
  87. Alteration filed

    Plumbing work in conjunction with NB Construction. NB filed under 321595403. Filing B00233044-P7.

    087
  88. Alteration approved

    Filing B00232980-P1 reached an approved status.

    088
  89. Alteration now approved

    The latest status recorded for B00232980-P1 is “Approved.”

    089
  90. Alteration signed off

    DOB recorded a sign-off for B00632862-I1.

    090
  91. Alteration now completed

    The latest status recorded for B00632862-I1 is “LOC Issued.”

    091
  92. Alteration signed off

    DOB recorded a sign-off for B00632878-I1.

    092
  93. Alteration now completed

    The latest status recorded for B00632878-I1 is “LOC Issued.”

    093
  94. Alteration signed off

    DOB recorded a sign-off for B00632892-I1.

    094
  95. Alteration now completed

    The latest status recorded for B00632892-I1 is “LOC Issued.”

    095
  96. Alteration approved

    Filing B00233044-P7 reached an approved status.

    096
  97. Alteration now approved

    The latest status recorded for B00233044-P7 is “Approved.”

    097
  98. Alteration filed

    Structural work in conjunction with new building construction. NB filed under 321595403. Filing B00232980-P2.

    098
  99. Alteration filed

    Plumbing work in conjunction with NB Construction. NB filed under 321595403. Filing B00233044-P8.

    099
  100. Alteration approved

    Filing B00233044-P8 reached an approved status.

    0100
  101. Alteration now approved

    The latest status recorded for B00233044-P8 is “Approved.”

    0101
  102. Alteration approved

    Filing B00232980-P2 reached an approved status.

    0102
  103. Alteration now approved

    The latest status recorded for B00232980-P2 is “Approved.”

    0103
  104. Alteration filed

    Plumbing work in conjunction with NB Construction. NB filed under 321595403. Filing B00233044-P9.

    0104
  105. Alteration approved

    Filing B00233044-P9 reached an approved status.

    0105
  106. Alteration now approved

    The latest status recorded for B00233044-P9 is “Approved.”

    0106
  107. Alteration filed

    Mechanical work filed in conjunction with NB Construction. NB Filed under 321595403. Energy Model Provided under NB BIS Application # 321595403./. Filing B00233023-P2.

    0107
  108. Alteration signed off

    DOB recorded a sign-off for B00426804-I1.

    0108
  109. Alteration now completed

    The latest status recorded for B00426804-I1 is “LOC Issued.”

    0109
  110. Alteration approved

    Filing B00233023-P2 reached an approved status.

    0110
  111. Alteration now approved

    The latest status recorded for B00233023-P2 is “Approved.”

    0111
  112. Alteration filed

    Installation of sprinkler/standpipe system in conjunction with NB #321595403. Filing B00354436-P3.

    0112
  113. Alteration approved

    Filing B00354436-P3 reached an approved status.

    0113
  114. Alteration now approved

    The latest status recorded for B00354436-P3 is “Approved.”

    0114
  115. Alteration signed off

    DOB recorded a sign-off for B00641609-I1.

    0115
  116. Alteration now completed

    The latest status recorded for B00641609-I1 is “LOC Issued.”

    0116
  117. Alteration filed

    Plumbing work in conjunction with NB Construction. NB filed under 321595403. Filing B00233044-A1.

    0117
  118. Alteration filed

    Installation of sprinkler/standpipe system in conjunction with NB #321595403. Filing B00354436-P4.

    0118
  119. Alteration approved

    Filing B00354436-P4 reached an approved status.

    0119
  120. Alteration now approved

    The latest status recorded for B00354436-P4 is “Approved.”

    0120
  121. Alteration approved

    Filing B00233044-A1 reached an approved status.

    0121
  122. Alteration now approved

    The latest status recorded for B00233044-A1 is “Approved.”

    0122
  123. Alteration now approved

    The latest status recorded for B00233044-P1 is “Approved.”

    0123
  124. Alteration now approved

    The latest status recorded for B00233044-P2 is “Approved.”

    0124
  125. Alteration signed off

    DOB recorded a sign-off for B00233023-I1.

    0125
  126. Alteration now completed

    The latest status recorded for B00233023-I1 is “LOC Issued.”

    0126
  127. Alteration signed off

    DOB recorded a sign-off for B00232980-I1.

    0127
  128. Alteration now completed

    The latest status recorded for B00232980-I1 is “LOC Issued.”

    0128
  129. Alteration signed off

    DOB recorded a sign-off for B00345823-I1.

    0129
  130. Alteration now completed

    The latest status recorded for B00345823-I1 is “LOC Issued.”

    0130
  131. Alteration signed off

    DOB recorded a sign-off for B00354436-I1.

    0131
  132. Alteration now completed

    The latest status recorded for B00354436-I1 is “LOC Issued.”

    0132
  133. Alteration signed off

    DOB recorded a sign-off for B00389877-I1.

    0133
  134. Alteration now completed

    The latest status recorded for B00389877-I1 is “LOC Issued.”

    0134
  135. Alteration signed off

    DOB recorded a sign-off for B00269739-I1.

    0135
  136. Alteration now completed

    The latest status recorded for B00269739-I1 is “LOC Issued.”

    0136
  137. Alteration signed off

    DOB recorded a sign-off for B00269755-I1.

    0137
  138. Alteration now completed

    The latest status recorded for B00269755-I1 is “LOC Issued.”

    0138
  139. Alteration signed off

    DOB recorded a sign-off for B00233044-I1.

    0139
  140. Alteration now completed

    The latest status recorded for B00233044-I1 is “LOC Issued.”

    0140