DOB filing B01395090-P1
Alteration filing at 80 New Lots Avenue
Building record · BIN 3428616
589 Christopher Avenue, Brooklyn, NY 11212
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 27 independently sourced records, including 17 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3428616
589 Christopher Avenue
Brownsville, Brooklyn
A consolidated public-record view · updated Sep 24, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 11-story condominium built in 2023, with 208 homes, on a 36,833 sq ft lot.
Owner of record
HP EBENEZER 2 HOUSING DEVELOPMENT FUND C OMPANY INC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 3 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3428616. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 27 alteration filing. Its latest status categories are 1 under review, 16 approved, 10 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 589 Christopher Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 27 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Structural work as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #321597606. Filing B00220806-I1.
Mechanical work as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #321597606. Filing B00221009-I1.
Plumbing work as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #321597606. Filing B00221134-I1.
Filing B00221009-I1 reached an approved status.
Install new sprinkler/standpipe system as per plans filed. no change to use egress or occupancy. filed in conjunction with nb #321597606. Filing B00323347-I1.
Install new temporary standpipe work as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB #321597606. Filing B00323382-I1.
Filing B00323382-I1 reached an approved status.
Filing B00323347-I1 reached an approved status.
Filing B00220806-I1 reached an approved status.
Install 12 ft curb cut as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #321597606. Filing B00373664-I1.
Filing B00221134-I1 reached an approved status.
Filing B00373664-I1 reached an approved status.
DOB lists a first permit date for B00373664-I1. That is not by itself confirmation of activity on site.
Installation of temporary construction fence as per plans filed herewith. This application is filed in conjunction with NB-321597606. Filing B00412108-I1.
DOB lists a first permit date for B00412108-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00221009-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00323382-I1. That is not by itself confirmation of activity on site.
Installation of temporary construction fence as per plans filed herewith. This application is filed in conjunction with NB-321597606. Filing B00412108-P1.
Filing B00412108-P1 reached an approved status.
The latest status recorded for B00412108-P1 is “Approved.”
Installation of temporary construction fence as per plans filed herewith. This application is filed in conjunction with NB-321597606. Filing B00590236-I1.
DOB lists a first permit date for B00590236-I1. That is not by itself confirmation of activity on site.
Structural work as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #321597606. Filing B00220806-P1.
DOB recorded a sign-off for B00412108-I1.
The latest status recorded for B00412108-I1 is “LOC Issued.”
Install new sprinkler/standpipe system as per plans filed. no change to use egress or occupancy. filed in conjunction with nb #321597606. Filing B00323347-P1.
Filing B00220806-P1 reached an approved status.
The latest status recorded for B00220806-P1 is “Approved.”
Mechanical work as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #321597606. Filing B00221009-P1.
Plumbing work as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #321597606. Filing B00221134-P1.
Filing B00221009-P1 reached an approved status.
The latest status recorded for B00221009-P1 is “Approved.”
Filing B00323347-P1 reached an approved status.
The latest status recorded for B00323347-P1 is “Approved.”
Filing B00221134-P1 reached an approved status.
The latest status recorded for B00221134-P1 is “Approved.”
Install new temporary standpipe work as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB #321597606. Filing B00323382-P1.
Filing B00323382-P1 reached an approved status.
The latest status recorded for B00323382-P1 is “Approved.”
DOB lists a first permit date for B00220806-I1. That is not by itself confirmation of activity on site.
Plumbing work as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #321597606. Filing B00221134-P2.
DOB lists a first permit date for B00221134-I1. That is not by itself confirmation of activity on site.
Filing B00221134-P2 reached an approved status.
The latest status recorded for B00221134-P2 is “Approved.”
DOB lists a first permit date for B00323347-I1. That is not by itself confirmation of activity on site.
Install boiler as per plans filed. No change in use, egress or occupancy. Filed in conjunction with NB #321597606. Filing B00221009-S1.
Filing B00221009-S1 reached an approved status.
DOB lists a first permit date for B00221009-S1. That is not by itself confirmation of activity on site.
Install boiler as per plans filed. No change in use, egress or occupancy. Filed in conjunction with NB #321597606. Filing B00221009-P3.
Filing B00221009-P3 reached an approved status.
The latest status recorded for B00221009-P3 is “Approved.”
Install boiler as per plans filed. No change in use, egress or occupancy. Filed in conjunction with NB #321597606. Filing B00221009-P4.
Filing B00221009-P4 reached an approved status.
The latest status recorded for B00221009-P4 is “Approved.”
Install boilers as per plans filed, no change to use egress or occupancy, filed in conjunction with NB #321597606. Filing B00221009-S2.
Mechanical work as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #321597606. Filing B00221009-P6.
Filing B00221009-P6 reached an approved status.
The latest status recorded for B00221009-P6 is “Approved.”
Filing B00221009-S2 reached an approved status.
DOB lists a first permit date for B00221009-S2. That is not by itself confirmation of activity on site.
Install new sprinkler/standpipe system as per plans filed. no change to use egress or occupancy. filed in conjunction with nb #321597606. Filing B00323347-P2.
DOB recorded a sign-off for B00323382-I1.
The latest status recorded for B00323382-I1 is “LOC Issued.”
Filing B00323347-P2 reached an approved status.
The latest status recorded for B00323347-P2 is “Approved.”
DOB recorded a sign-off for B00323347-I1.
The latest status recorded for B00323347-I1 is “LOC Issued.”
Plumbing work as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #321597606. Filing B00221134-P3.
Filing B00221134-P3 reached an approved status.
The latest status recorded for B00221134-P3 is “Approved.”
Plumbing work as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #321597606. Filing B00221134-P4.
DOB recorded a sign-off for B00220806-I1.
The latest status recorded for B00220806-I1 is “LOC Issued.”
DOB recorded a sign-off for B00590236-I1.
The latest status recorded for B00590236-I1 is “LOC Issued.”
Filing B00221134-P4 reached an approved status.
The latest status recorded for B00221134-P4 is “Approved.”
DOB recorded a sign-off for B00221009-S2.
The latest status recorded for B00221009-S2 is “LOC Issued.”
DOB recorded a sign-off for B00221009-S1.
The latest status recorded for B00221009-S1 is “LOC Issued.”
DOB recorded a sign-off for B00221134-I1.
The latest status recorded for B00221134-I1 is “LOC Issued.”
DOB recorded a sign-off for B00221009-I1.
The latest status recorded for B00221009-I1 is “LOC Issued.”
Mechanical work for retail spaces on first floor as per plans filed herewith. no changes in egress, use or occupancy. Filing B01366019-S1.
Filing for sprinkler work for retail spaces on 1st floor as per plans filed herewith. no change in egress, use or occupancy. Filing B01366019-S2.
Interior partition work with related ceiling and lighting for retail spaces (9600 sf) as per plans filed herewith. no change in egress, use or occupancy. Filing B01366019-I1.
DOB recorded a sign-off for B00373664-I1.
The latest status recorded for B00373664-I1 is “LOC Issued.”
Filing B01366019-I1 reached an approved status.
Filing B01366019-S2 reached an approved status.
DOB lists a first permit date for B01366019-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01366019-I1 is “Permit Entire.”
DOB lists a first permit date for B01366019-S2. That is not by itself confirmation of activity on site.
The latest status recorded for B01366019-S2 is “Permit Entire.”
Filing B01366019-S1 reached an approved status.
DOB lists a first permit date for B01366019-S1. That is not by itself confirmation of activity on site.
The latest status recorded for B01366019-S1 is “Permit Entire.”
Filing to add plumbing work type in conjunction with GC/MS DOB now job# B01331931, install (1) three compartment sink, and (1) hand-wash sinks, (1) grease trap, and (2) floor drainages inside 1st commercial space (DELI) as per plans. Filing B01395090-P1.
The latest status recorded for B01395090-P1 is “Prof Cert QA Review.”