Building record · BIN 3428697

240 Huntington Street

240 Huntington Street, Brooklyn, NY 11231

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 23 independently sourced records, including 16 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3428697

240 Huntington Street

Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn

A consolidated public-record view · updated Sep 28, 2026

DOB filings
23
Active-status
16
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings23
Open or active-status records16
First included filingFeb 27, 2020
Latest recorded changeSep 28, 2026

The lot

What is already here?

The lot holds a 6-story office building built in 2023, on a 49,900 sq ft lot.

  1. Floors 3–6Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 7 m. Nothing on that side reaches this floor.
  2. Floor 2Nothing on record
  3. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 3 — the tallest thing within 60 m to the south is 7 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 26.8 m over 6 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
2023
Last altered
2023
Floors
6
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
M2-3
Lot area
49,900 sq ft
Building area
99,704 sq ft

Owner of record

NYC TRANSIT

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 6 notices on file; the most recent was issued Apr 6, 2018.

  • Low pressure boiler

    Issued Apr 6, 2018 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT

  • Low pressure boiler

    Issued Apr 6, 2018 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT

  • Low pressure boiler

    Issued Apr 6, 2018 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3428697. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 23 alteration filing. Its latest status categories are 1 under review, 6 recorded as completed, 15 approved, 1 closed or withdrawn. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Feb 27, 2020
Latest recorded change
Sep 28, 2026
Highest proposed story count
6 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 240 Huntington Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 23 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Structural work as per plans filed. Filed in conjunction with new building #321588885. Filing B00316516-I1.

    01
  2. Alteration filed

    Mechanical work as plans filed. Filed in conjunction with New Building #321588885. Filing B00316490-I1.

    02
  3. Alteration filed

    Plumbing work as per plans filed. Filed in conjunction with New Building #321588885. Filing B00316507-I1.

    03
  4. Alteration approved

    Filing B00316490-I1 reached an approved status.

    04
  5. Alteration approved

    Filing B00316507-I1 reached an approved status.

    05
  6. Alteration approved

    Filing B00316516-I1 reached an approved status.

    06
  7. Alteration filed

    Sprinkler and standpipe work as per plans filed. Filed in conjunction with New Building #321588885. Filing B00316509-I1.

    07
  8. Alteration filed

    Install temporary standpipe system as per plans filed. Filed in conjunction with NB# 321588885. Filing B00352255-I1.

    08
  9. Alteration approved

    Filing B00352255-I1 reached an approved status.

    09
  10. Alteration filed

    Mechanical work as plans filed. Filed in conjunction with New Building #321588885. Filing B00316490-P1.

    010
  11. Alteration approved

    Filing B00316509-I1 reached an approved status.

    011
  12. Alteration approved

    Filing B00316490-P1 reached an approved status.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for B00316490-I1. That is not by itself confirmation of activity on site.

    013
  14. Alteration filed

    Installation of 23' curb cut. Filed in conjunction with New Building application # 321588885. Filing B00686447-I1.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for B00352255-I1. That is not by itself confirmation of activity on site.

    015
  16. Permit recorded for alteration

    DOB lists a first permit date for B00316516-I1. That is not by itself confirmation of activity on site.

    016
  17. Alteration approved

    Filing B00686447-I1 reached an approved status.

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for B00316507-I1. That is not by itself confirmation of activity on site.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for B00316509-I1. That is not by itself confirmation of activity on site.

    019
  20. Alteration filed

    Mechanical work as plans filed. Filed in conjunction with New Building #321588885. Filing B00316490-P5.

    020
  21. Alteration approved

    Filing B00316490-P5 reached an approved status.

    021
  22. Alteration now approved

    The latest status recorded for B00316490-P5 is “Approved.”

    022
  23. Permit recorded for alteration

    DOB lists a first permit date for B00686447-I1. That is not by itself confirmation of activity on site.

    023
  24. Alteration filed

    Sprinkler and standpipe work as per plans filed. Filed in conjunction with New Building #321588885. Filing B00316509-P1.

    024
  25. Alteration filed

    Mechanical work as plans filed. Filed in conjunction with New Building #321588885. Filing B00316490-P6.

    025
  26. Alteration filed

    Plumbing work as per plans filed. Filed in conjunction with New Building #321588885. Filing B00316507-P1.

    026
  27. Alteration now approved

    The latest status recorded for B00316490-P1 is “Approved.”

    027
  28. Alteration approved

    Filing B00316490-P6 reached an approved status.

    028
  29. Alteration now approved

    The latest status recorded for B00316490-P6 is “Approved.”

    029
  30. Alteration approved

    Filing B00316507-P1 reached an approved status.

    030
  31. Alteration now approved

    The latest status recorded for B00316507-P1 is “Approved.”

    031
  32. Alteration approved

    Filing B00316509-P1 reached an approved status.

    032
  33. Alteration now approved

    The latest status recorded for B00316509-P1 is “Approved.”

    033
  34. Alteration filed

    Plumbing work as per plans filed. Filed in conjunction with New Building #321588885. Filing B00316507-P2.

    034
  35. Alteration approved

    Filing B00316507-P2 reached an approved status.

    035
  36. Alteration now approved

    The latest status recorded for B00316507-P2 is “Approved.”

    036
  37. Alteration signed off

    DOB recorded a sign-off for B00316516-I1.

    037
  38. Alteration now completed

    The latest status recorded for B00316516-I1 is “LOC Issued.”

    038
  39. Alteration filed

    Mechanical work as plans filed. Filed in conjunction with New Building #321588885. Filing B00316490-P8.

    039
  40. Alteration signed off

    DOB recorded a sign-off for B00352255-I1.

    040
  41. Alteration now completed

    The latest status recorded for B00352255-I1 is “LOC Issued.”

    041
  42. Alteration approved

    Filing B00316490-P8 reached an approved status.

    042
  43. Alteration now approved

    The latest status recorded for B00316490-P8 is “Approved.”

    043
  44. Alteration filed

    Mechanical work as plans filed. Filed in conjunction with New Building #321588885. Filing B00316490-P9.

    044
  45. Alteration filed

    Plumbing work as per plans filed. Filed in conjunction with New Building #321588885. Filing B00316507-P3.

    045
  46. Alteration approved

    Filing B00316507-P3 reached an approved status.

    046
  47. Alteration now approved

    The latest status recorded for B00316507-P3 is “Approved.”

    047
  48. Alteration approved

    Filing B00316490-P9 reached an approved status.

    048
  49. Alteration now approved

    The latest status recorded for B00316490-P9 is “Approved.”

    049
  50. Alteration filed

    Mechanical work as plans filed. Filed in conjunction with New Building #321588885. Filing B00316490-A1.

    050
  51. Alteration filed

    Plumbing work as per plans filed. Filed in conjunction with New Building #321588885. Filing B00316507-P4.

    051
  52. Alteration filed

    Sprinkler and standpipe work as per plans filed. Filed in conjunction with New Building #321588885. Filing B00316509-P2.

    052
  53. Alteration filed

    Scope shall include installation of air conditioning system (vfr), ventilation system for the kitchen equipment (make-up air fan and kitchen exhaust fan) at first floor cade. existing condensing unit and once ac unit to be re-used. Filing B01158880-S2.

    053
  54. Alteration now approved

    The latest status recorded for B00316509-I1 is “Permit Entire.”

    054
  55. Alteration approved

    Filing B00316509-P2 reached an approved status.

    055
  56. Alteration now approved

    The latest status recorded for B00316509-P2 is “Approved.”

    056
  57. Alteration approved

    Filing B00316490-A1 reached an approved status.

    057
  58. Alteration now approved

    The latest status recorded for B00316490-A1 is “Approved.”

    058
  59. Alteration now closed

    The latest status recorded for B00316490-P7 is “Filing Withdrawn.”

    059
  60. Alteration now approved

    The latest status recorded for B00316507-I1 is “Permit Entire.”

    060
  61. Alteration approved

    Filing B00316507-P4 reached an approved status.

    061
  62. Alteration now approved

    The latest status recorded for B00316507-P4 is “Approved.”

    062
  63. Alteration filed

    New 3-comp sink, grease interceptor, hw heater, & handsinks at both 1st & 2nd floor locations. new coffee brewers & ice machine at 1st floor location. install 3 new & relocate 3 sprinkler heads at 1st floor. no sprinkler scope proposed for 2nd floor. Filing B01158880-S1.

    063
  64. Alteration approved

    Filing B01158880-S2 reached an approved status.

    064
  65. Alteration approved

    Filing B01158880-S1 reached an approved status.

    065
  66. Permit recorded for alteration

    DOB lists a first permit date for B01158880-S1. That is not by itself confirmation of activity on site.

    066
  67. Permit recorded for alteration

    DOB lists a first permit date for B01158880-S2. That is not by itself confirmation of activity on site.

    067
  68. Alteration filed

    New 3-comp sink, grease interceptor, hw heater, & handsinks at both 1st & 2nd floor locations. new coffee brewers & ice machine at 1st floor location. install 3 new & relocate 3 sprinkler heads at 1st floor. no sprinkler scope proposed for 2nd floor. Filing B01158880-P2.

    068
  69. Alteration signed off

    DOB recorded a sign-off for B00686447-I1.

    069
  70. Alteration now completed

    The latest status recorded for B00686447-I1 is “LOC Issued.”

    070
  71. Alteration approved

    Filing B01158880-P2 reached an approved status.

    071
  72. Alteration now approved

    The latest status recorded for B01158880-P2 is “Approved.”

    072
  73. Alteration signed off

    DOB recorded a sign-off for B01158880-S1.

    073
  74. Alteration now completed

    The latest status recorded for B01158880-S1 is “LOC Issued.”

    074
  75. Alteration signed off

    DOB recorded a sign-off for B01158880-S2.

    075
  76. Alteration now completed

    The latest status recorded for B01158880-S2 is “LOC Issued.”

    076
  77. Alteration filed

    Sprinkler and standpipe work as per plans filed. Filed in conjunction with New Building #321588885. Filing B00316509-P3.

    077
  78. Alteration signed off

    DOB recorded a sign-off for B00316490-I1.

    078
  79. Alteration now completed

    The latest status recorded for B00316490-I1 is “LOC Issued.”

    079
  80. Alteration now under review

    The latest status recorded for B00316509-P3 is “Plan Examiner Review.”

    080