Building record · BIN 3428720

99 Grove Street

99 Grove Street, Brooklyn, NY 11221

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 11 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3428720

99 Grove Street

Bushwick (East), Brooklyn

A consolidated public-record view · updated Mar 27, 2023

DOB filings
11
Active-status
6
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings11
Open or active-status records6
First included filingMay 11, 2020
Latest recorded changeMar 27, 2023

The lot

What is already here?

The lot holds a 4-story walk-up apartment building built in 2021, with 8 homes, on a 2,500 sq ft lot.

  1. Floors 2–4Homes8 homes are recorded on this lot — about 3 homes to a floor, and the apartments assessed on this block run to a typical 915 sq ft (85 m²). The city does not publish which floor any of them is on.
  2. Floor 1Street levelStreet level. The lot is recorded as walk-up apartments.
  • Street levelWalk-up apartments
  • Homes8 recorded · typically 85 m² · valued $313,666
  • Above the southern skylineFrom about floor 8 — the tallest thing within 60 m to the south is 22.2 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 16.8 m over 4 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
2021
Last altered
2021
Floors
4
Residential units
8
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
2,500 sq ft
Building area
6,129 sq ft

The apartments

8 condominium apartments are assessed on this block, and the typical one is 915 sq ft (85 m²). They run from 84 to 145 m².

The city values the typical one at $313,666. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

1 apartment on this tax block changed hands in the year the city last published, at a median of $600,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

115-117 GROVE ST LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3428720. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 11 alteration filing. Its latest status categories are 5 recorded as completed, 6 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
May 11, 2020
Latest recorded change
Mar 27, 2023
Highest proposed story count
4 stories
Highest proposed unit count
8 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 99 Grove Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 11 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Herewith filing drawings for structural as associated with nb DOB job #321589688. Filing B00345980-I1.

    01
  2. Alteration approved

    Filing B00345980-I1 reached an approved status.

    02
  3. Alteration filed

    Proposed sprinkler and plumbing in conjunction with NB job #321589688. Filing B00345980-S2.

    03
  4. Alteration filed

    Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI) in conjunction with NB application #321589688. Filing B00345980-S1.

    04
  5. Alteration approved

    Filing B00345980-S2 reached an approved status.

    05
  6. Alteration filed

    Install temporary fence for this new building application. Filing B00345980-S3.

    06
  7. Alteration approved

    Filing B00345980-S3 reached an approved status.

    07
  8. Alteration approved

    Filing B00345980-S1 reached an approved status.

    08
  9. Alteration filed

    Herewith filing drawings for structural as associated with nb DOB job #321589688. Filing B00345980-P2.

    09
  10. Alteration approved

    Filing B00345980-P2 reached an approved status.

    010
  11. Alteration now approved

    The latest status recorded for B00345980-P2 is “Approved.”

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for B00345980-S3. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    Herewith filing drawings for structural as associated with nb DOB job #321589688. Filing B00345980-P3.

    013
  14. Alteration approved

    Filing B00345980-P3 reached an approved status.

    014
  15. Alteration now approved

    The latest status recorded for B00345980-P3 is “Approved.”

    015
  16. Permit recorded for alteration

    DOB lists a first permit date for B00345980-S1. That is not by itself confirmation of activity on site.

    016
  17. Alteration filed

    Herewith filing drawings for structural as associated with nb DOB job #321589688. Filing B00345980-P4.

    017
  18. Alteration approved

    Filing B00345980-P4 reached an approved status.

    018
  19. Alteration now approved

    The latest status recorded for B00345980-P4 is “Approved.”

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for B00345980-I1. That is not by itself confirmation of activity on site.

    020
  21. Alteration filed

    Proposed installation of heavy duty sidewalk shed as per plans. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. no change in use occupancy or egress under this application. Filing B00588907-I1.

    021
  22. Permit recorded for alteration

    DOB lists a first permit date for B00588907-I1. That is not by itself confirmation of activity on site.

    022
  23. Alteration filed

    Proposed sprinkler and plumbing in conjunction with NB job #321589688. Filing B00345980-P1.

    023
  24. Alteration approved

    Filing B00345980-P1 reached an approved status.

    024
  25. Alteration now approved

    The latest status recorded for B00345980-P1 is “Approved.”

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for B00345980-S2. That is not by itself confirmation of activity on site.

    026
  27. Alteration signed off

    DOB recorded a sign-off for B00588907-I1.

    027
  28. Alteration now completed

    The latest status recorded for B00588907-I1 is “LOC Issued.”

    028
  29. Alteration filed

    Proposed sprinkler and plumbing in conjunction with NB job #321589688. Filing B00345980-P6.

    029
  30. Alteration filed

    Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI) in conjunction with NB application #321589688. Filing B00345980-P5.

    030
  31. Alteration approved

    Filing B00345980-P5 reached an approved status.

    031
  32. Alteration now approved

    The latest status recorded for B00345980-P5 is “Approved.”

    032
  33. Alteration approved

    Filing B00345980-P6 reached an approved status.

    033
  34. Alteration now approved

    The latest status recorded for B00345980-P6 is “Approved.”

    034
  35. Alteration signed off

    DOB recorded a sign-off for B00345980-S1.

    035
  36. Alteration now completed

    The latest status recorded for B00345980-S1 is “LOC Issued.”

    036
  37. Alteration signed off

    DOB recorded a sign-off for B00345980-S3.

    037
  38. Alteration now completed

    The latest status recorded for B00345980-S3 is “LOC Issued.”

    038
  39. Alteration signed off

    DOB recorded a sign-off for B00345980-I1.

    039
  40. Alteration now completed

    The latest status recorded for B00345980-I1 is “LOC Issued.”

    040
  41. Alteration signed off

    DOB recorded a sign-off for B00345980-S2.

    041
  42. Alteration now completed

    The latest status recorded for B00345980-S2 is “LOC Issued.”

    042