DOB filing B00214469-I1
Alteration filing at 527 East 98 Street
Building record · BIN 3428749
527 East 98 Street, Brooklyn, NY 11212
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 18 independently sourced records, including 9 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3428749
527 East 98 Street
Brownsville, Brooklyn
A consolidated public-record view · updated Mar 21, 2024
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 7-story elevator apartment building built in 2020, with 160 homes, on a 42,787 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 2 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3428749. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 18 alteration filing. Its latest status categories are 9 recorded as completed, 9 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 527 East 98 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 18 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Structural superstructure work in conjunction with new building. Filing B00214469-I1.
Mechanical work as shown on plans. Filing B00214563-I1.
Plumbing work in conjunction with NB 321594832. Filing B00214588-I1.
Sprinkler and Standpipe work in conjunction with NB 321594832. Filing B00214743-I1.
Filing B00214588-I1 reached an approved status.
Filing B00214469-I1 reached an approved status.
Filing B00214563-I1 reached an approved status.
Temporary construction fence around perimeter of site and sidewalk. Filing B00314698-I1.
Filing B00314698-I1 reached an approved status.
DOB lists a first permit date for B00314698-I1. That is not by itself confirmation of activity on site.
Filing B00214743-I1 reached an approved status.
DOB lists a first permit date for B00214588-I1. That is not by itself confirmation of activity on site.
Sidewalk shed proposed installation of sidewalk shed as per plan. no change in use,egress or occupancy. Filing B00356917-I1.
DOB lists a first permit date for B00356917-I1. That is not by itself confirmation of activity on site.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00391975-I1.
DOB lists a first permit date for B00391975-I1. That is not by itself confirmation of activity on site.
Plywood fence proposed installation of plywood fence as per plan. no change in use,egress or occupancy. Filing B00461385-I1.
DOB lists a first permit date for B00461385-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00214743-I1. That is not by itself confirmation of activity on site.
Installation of a temporary 4-point suspended scaffold as per plans in conjunction with nb construction. no change in use, egress or occupancy. scaffold to comply with chapter 33 of NYC building code of 2014. Filing B00503534-I1.
DOB lists a first permit date for B00503534-I1. That is not by itself confirmation of activity on site.
Installation of a temporary 4-point suspended scaffold as per plans in conjunction with nb construction. no change in use, egress or occupancy. scaffold to comply with chapter 33 of NYC building code of 2014. Filing B00503534-P1.
Filing B00503534-P1 reached an approved status.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00391975-P1.
Filing B00391975-P1 reached an approved status.
Installation of a temporary 4-point suspended scaffold as per plans in conjunction with nb construction. no change in use, egress or occupancy. scaffold to comply with chapter 33 of NYC building code of 2014. Filing B00503534-P2.
Filing B00503534-P2 reached an approved status.
Installation of a temporary 4-point suspended scaffold as per plans in conjunction with nb construction. no change in use, egress or occupancy. scaffold to comply with chapter 33 of NYC building code of 2014. Filing B00503534-P3.
Filing B00503534-P3 reached an approved status.
The latest status recorded for B00391975-P1 is “Approved.”
The latest status recorded for B00503534-P1 is “Approved.”
The latest status recorded for B00503534-P2 is “Approved.”
The latest status recorded for B00503534-P3 is “Approved.”
DOB lists a first permit date for B00214563-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00356917-I1.
The latest status recorded for B00356917-I1 is “LOC Issued.”
DOB recorded a sign-off for B00461385-I1.
The latest status recorded for B00461385-I1 is “LOC Issued.”
Plumbing work in conjunction with NB 321594832. Filing B00214588-P2.
Filing B00214588-P2 reached an approved status.
The latest status recorded for B00214588-P2 is “Approved.”
Plumbing work in conjunction with NB 321594832. Filing B00214588-P3.
Filing B00214588-P3 reached an approved status.
The latest status recorded for B00214588-P3 is “Approved.”
DOB recorded a sign-off for B00314698-I1.
The latest status recorded for B00314698-I1 is “LOC Issued.”
DOB recorded a sign-off for B00391975-I1.
The latest status recorded for B00391975-I1 is “LOC Issued.”
DOB recorded a sign-off for B00503534-I1.
The latest status recorded for B00503534-I1 is “LOC Issued.”
Plumbing work in conjunction with NB 321594832. Filing B00214588-P5.
Filing B00214588-P5 reached an approved status.
The latest status recorded for B00214588-P5 is “Approved.”
Plumbing work in conjunction with NB 321594832. Filing B00214588-P6.
Filing B00214588-P6 reached an approved status.
The latest status recorded for B00214588-P6 is “Approved.”
DOB recorded a sign-off for B00214743-I1.
The latest status recorded for B00214743-I1 is “LOC Issued.”
DOB recorded a sign-off for B00214588-I1.
The latest status recorded for B00214588-I1 is “LOC Issued.”
DOB recorded a sign-off for B00214563-I1.
The latest status recorded for B00214563-I1 is “LOC Issued.”
Structural superstructure work in conjunction with new building. Filing B00214469-P1.
Filing B00214469-P1 reached an approved status.
The latest status recorded for B00214469-P1 is “Approved.”
DOB lists a first permit date for B00214469-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00214469-I1.
The latest status recorded for B00214469-I1 is “LOC Issued.”