DOB filing B00480881-I1
Alteration filing at 243 Calyer Street
Building record · BIN 3428773
243 Calyer Street, Brooklyn, NY 11222
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3428773
243 Calyer Street
Greenpoint, Brooklyn
A consolidated public-record view · updated Jun 13, 2022
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a garage or fuel station on a 1,750 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3428773. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 4 alteration filing. Its latest status categories are 4 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 243 Calyer Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of new exhaust system for ConEd network compartments with associated ductwork, fire dampers, fan and controls. Filing B00448088-I1.
Installation of new sanitary/storm drainage system and fire connection line for sprinkler. Filing B00480881-I1.
Installation of new standpipe and sprinkler system. Filing B00478678-I1.
Filing B00478678-I1 reached an approved status.
The latest status recorded for B00478678-I1 is “Approved.”
Structural work filed in conjunction with nb# 340793261. Filing B00464098-I1.
Filing B00464098-I1 reached an approved status.
The latest status recorded for B00464098-I1 is “Approved.”
Filing B00448088-I1 reached an approved status.
The latest status recorded for B00448088-I1 is “Approved.”
Filing B00480881-I1 reached an approved status.
The latest status recorded for B00480881-I1 is “Approved.”