Building record · BIN 3428788

2675 Bedford Avenue

2675 Bedford Avenue, Brooklyn, NY 11210

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3428788

2675 Bedford Avenue

Flatbush, Brooklyn

A consolidated public-record view · updated Jan 13, 2023

DOB filings
4
Active-status
1
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings4
Open or active-status records1
First included filingDec 20, 2021
Latest recorded changeJan 13, 2023

The lot

What is already here?

The lot holds a two-family home built in 2022, on a 3,017 sq ft lot.

Built
2022
Last altered
2022
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R3X
Lot area
3,017 sq ft
Building area
1,778 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3428788. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 4 alteration filing. Its latest status categories are 3 recorded as completed, 1 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Dec 20, 2021
Latest recorded change
Jan 13, 2023
Highest proposed story count
Not stated
Highest proposed unit count
2 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 2675 Bedford Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Proposed construction of new curb cut in conjunction with NB Job # 340765452. Filing B00496962-I1.

    01
  2. Alteration filed

    Proposed installation of temporary construction fence in conjunction with NB Job # 340765452. Filing B00496968-I1.

    02
  3. Alteration approved

    Filing B00496962-I1 reached an approved status.

    03
  4. Alteration approved

    Filing B00496968-I1 reached an approved status.

    04
  5. Alteration filed

    Installation of sprinkler system (with less than 30 heads) and also plumbing fixtures and plumbing piping for new 2-family building. Filed in conjunction with New Building BIS 340765452. Filing B00496973-I1.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for B00496968-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration approved

    Filing B00496973-I1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00496973-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration signed off

    DOB recorded a sign-off for B00496968-I1.

    09
  10. Alteration now completed

    The latest status recorded for B00496968-I1 is “LOC Issued.”

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for B00496962-I1. That is not by itself confirmation of activity on site.

    011
  12. Alteration signed off

    DOB recorded a sign-off for B00496962-I1.

    012
  13. Alteration now completed

    The latest status recorded for B00496962-I1 is “LOC Issued.”

    013
  14. Alteration filed

    Installation of sprinkler system (with less than 30 heads) and also plumbing fixtures and plumbing piping for new 2-family building. Filed in conjunction with New Building BIS 340765452. Filing B00496973-P1.

    014
  15. Alteration approved

    Filing B00496973-P1 reached an approved status.

    015
  16. Alteration now approved

    The latest status recorded for B00496973-P1 is “Approved.”

    016
  17. Alteration signed off

    DOB recorded a sign-off for B00496973-I1.

    017
  18. Alteration now completed

    The latest status recorded for B00496973-I1 is “LOC Issued.”

    018