Building record · BIN 3428821

18 Monitor Street

18 Monitor Street, Brooklyn, NY 11222

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3428821

18 Monitor Street

East Williamsburg, Brooklyn

A consolidated public-record view · updated Sep 12, 2023

DOB filings
10
Active-status
4
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings10
Open or active-status records4
First included filingSep 11, 2019
Latest recorded changeSep 12, 2023

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 2 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3428821. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 10 alteration filing. Its latest status categories are 6 recorded as completed, 4 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Sep 11, 2019
Latest recorded change
Sep 12, 2023
Highest proposed story count
Not stated
Highest proposed unit count
13 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 18 Monitor Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of construction fence, to protect site during full demolition. Filing B00079290-I1.

    01
  2. Alteration filed

    Installation of construction fence to protect site, during full demolition. Filing B00079303-I1.

    02
  3. Alteration approved

    Filing B00079303-I1 reached an approved status.

    03
  4. Alteration approved

    Filing B00079290-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for B00079290-I1. That is not by itself confirmation of activity on site.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for B00079303-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Installation of sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00280889-I1.

    07
  8. Alteration filed

    Installation of sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00280911-I1.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for B00280889-I1. That is not by itself confirmation of activity on site.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for B00280911-I1. That is not by itself confirmation of activity on site.

    010
  11. Alteration filed

    Installation of construction fence to protect site. Filing B00390836-I1.

    011
  12. Alteration approved

    Filing B00390836-I1 reached an approved status.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for B00390836-I1. That is not by itself confirmation of activity on site.

    013
  14. Alteration filed

    Installation of pipe scaffold as per drawings. pipe scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00482983-I1.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for B00482983-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration filed

    Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application. Filing B00482983-P1.

    016
  17. Alteration approved

    Filing B00482983-P1 reached an approved status.

    017
  18. Alteration now approved

    The latest status recorded for B00482983-P1 is “Approved.”

    018
  19. Alteration filed

    Installation of pipe scaffold as per drawings. pipe scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00482983-P2.

    019
  20. Alteration approved

    Filing B00482983-P2 reached an approved status.

    020
  21. Alteration now approved

    The latest status recorded for B00482983-P2 is “Approved.”

    021
  22. Alteration filed

    Installation of pipe scaffold as per drawings. pipe scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00482983-P3.

    022
  23. Alteration approved

    Filing B00482983-P3 reached an approved status.

    023
  24. Alteration now approved

    The latest status recorded for B00482983-P3 is “Approved.”

    024
  25. Alteration filed

    Installation of pipe scaffold as per drawings. pipe scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00482983-P4.

    025
  26. Alteration approved

    Filing B00482983-P4 reached an approved status.

    026
  27. Alteration now approved

    The latest status recorded for B00482983-P4 is “Approved.”

    027
  28. Alteration signed off

    DOB recorded a sign-off for B00280889-I1.

    028
  29. Alteration now completed

    The latest status recorded for B00280889-I1 is “LOC Issued.”

    029
  30. Alteration signed off

    DOB recorded a sign-off for B00280911-I1.

    030
  31. Alteration now completed

    The latest status recorded for B00280911-I1 is “LOC Issued.”

    031
  32. Alteration signed off

    DOB recorded a sign-off for B00482983-I1.

    032
  33. Alteration now completed

    The latest status recorded for B00482983-I1 is “LOC Issued.”

    033
  34. Alteration signed off

    DOB recorded a sign-off for B00079290-I1.

    034
  35. Alteration now completed

    The latest status recorded for B00079290-I1 is “LOC Issued.”

    035
  36. Alteration signed off

    DOB recorded a sign-off for B00079303-I1.

    036
  37. Alteration now completed

    The latest status recorded for B00079303-I1 is “LOC Issued.”

    037
  38. Alteration signed off

    DOB recorded a sign-off for B00390836-I1.

    038
  39. Alteration now completed

    The latest status recorded for B00390836-I1 is “LOC Issued.”

    039