130 Hope Street, Brooklyn, NY 11211
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 24 independently sourced records, including 13 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3428907
130 Hope Street
Williamsburg, Brooklyn
A consolidated public-record view · updated May 11, 2023
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 7-story elevator apartment building built in 2022, with 143 homes, on a 26,103 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3428907. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 24 alteration filing. Its latest status categories are 9 recorded as completed, 13 approved, 2 closed or withdrawn. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 130 Hope Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 24 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of curb cut. Filing B00148943-I1.
Installation of curb cut. Filing B00149018-I1.
Proposed construction fence. no change to use, egress or occupancy under this application. Filing B00327834-I1.
Filing B00327834-I1 reached an approved status.
DOB lists a first permit date for B00327834-I1. That is not by itself confirmation of activity on site.
Combined Sprinkler/Standpipe system filed in conjunction with NB# 321590346. Filing B00347762-I1.
Installation of mechanical HVAC systems including heating & cooling equipment, ventilation duct work & fans, and mechanical piping in conjunction with nb# 321590346. Filing B00347761-I1.
Plumbing filed in conjunction with the New Building 321590346. Filing B00347759-I1.
Structural specifications filed in conjunction with nb #321590346. Filing B00347784-I1.
Installation of new curb cut in conjunction with nb #321590346. Filing B00352176-I1.
Filing B00347762-I1 reached an approved status.
Filing B00347761-I1 reached an approved status.
Combined Sprinkler/Standpipe system filed in conjunction with NB# 321590346. Filing B00347762-P1.
Filing B00347762-P1 reached an approved status.
The latest status recorded for B00347762-P1 is “Approved.”
Filing B00347759-I1 reached an approved status.
Filing B00352176-I1 reached an approved status.
Filing B00347784-I1 reached an approved status.
Proposed construction fence. no change to use, egress or occupancy under this application. Filing B00491384-I1.
Filing B00491384-I1 reached an approved status.
DOB lists a first permit date for B00491384-I1. That is not by itself confirmation of activity on site.
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00574762-I1.
DOB lists a first permit date for B00574762-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00347761-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00347759-I1. That is not by itself confirmation of activity on site.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00574778-I1.
DOB lists a first permit date for B00574778-I1. That is not by itself confirmation of activity on site.
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00574762-P1.
Filing B00574762-P1 reached an approved status.
The latest status recorded for B00574762-P1 is “Approved.”
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00574762-P2.
Filing B00574762-P2 reached an approved status.
The latest status recorded for B00574762-P2 is “Approved.”
DOB lists a first permit date for B00347762-I1. That is not by itself confirmation of activity on site.
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00574762-P3.
Installation of mechanical HVAC systems including heating & cooling equipment, ventilation duct work & fans, and mechanical piping in conjunction with nb# 321590346. Filing B00347761-P1.
Filing B00574762-P3 reached an approved status.
The latest status recorded for B00574762-P3 is “Approved.”
Filing B00347761-P1 reached an approved status.
The latest status recorded for B00347761-P1 is “Approved.”
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00574778-P1.
Filing B00574778-P1 reached an approved status.
The latest status recorded for B00574778-P1 is “Approved.”
DOB lists a first permit date for B00347784-I1. That is not by itself confirmation of activity on site.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00574778-P2.
Filing B00574778-P2 reached an approved status.
The latest status recorded for B00574778-P2 is “Approved.”
Plumbing filed in conjunction with the New Building 321590346. Filing B00347759-P1.
Filing B00347759-P1 reached an approved status.
The latest status recorded for B00347759-P1 is “Approved.”
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00574778-P3.
Filing B00574778-P3 reached an approved status.
The latest status recorded for B00574778-P3 is “Approved.”
DOB recorded a sign-off for B00574762-I1.
The latest status recorded for B00574762-I1 is “LOC Issued.”
DOB recorded a sign-off for B00574778-I1.
The latest status recorded for B00574778-I1 is “LOC Issued.”
DOB recorded a sign-off for B00327834-I1.
The latest status recorded for B00327834-I1 is “LOC Issued.”
DOB recorded a sign-off for B00491384-I1.
The latest status recorded for B00491384-I1 is “LOC Issued.”
DOB lists a first permit date for B00352176-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00148943-I1 is “Filing Withdrawn.”
The latest status recorded for B00149018-I1 is “Filing Withdrawn.”
DOB recorded a sign-off for B00347784-I1.
The latest status recorded for B00347784-I1 is “LOC Issued.”
Plumbing filed in conjunction with the New Building 321590346. Filing B00347759-P2.
Filing B00347759-P2 reached an approved status.
The latest status recorded for B00347759-P2 is “Approved.”
DOB recorded a sign-off for B00352176-I1.
The latest status recorded for B00352176-I1 is “LOC Issued.”
Combined Sprinkler/Standpipe system filed in conjunction with NB# 321590346. Filing B00347762-P3.
DOB recorded a sign-off for B00347759-I1.
The latest status recorded for B00347759-I1 is “LOC Issued.”
Filing B00347762-P3 reached an approved status.
The latest status recorded for B00347762-P3 is “Approved.”
Combined Sprinkler/Standpipe system filed in conjunction with NB# 321590346. Filing B00347762-P4.
Installation of mechanical HVAC systems including heating & cooling equipment, ventilation duct work & fans, and mechanical piping in conjunction with nb# 321590346. Filing B00347761-P3.
Filing B00347761-P3 reached an approved status.
The latest status recorded for B00347761-P3 is “Approved.”
DOB recorded a sign-off for B00347761-I1.
The latest status recorded for B00347761-I1 is “LOC Issued.”
Filing B00347762-P4 reached an approved status.
The latest status recorded for B00347762-P4 is “Approved.”
DOB recorded a sign-off for B00347762-I1.
The latest status recorded for B00347762-I1 is “LOC Issued.”