DOB filing B00640786-I1
New building at 254 Euclid Avenue
Building record · BIN 3428952
254 Euclid Avenue, Brooklyn, NY 11208
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 32 independently sourced records, including 23 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3428952
254 Euclid Avenue
Cypress Hills, Brooklyn
A consolidated public-record view · updated Sep 24, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 14-story condominium built in 2023, with 436 homes, on a 75,111 sq ft lot.
Owner of record
ATLANTIC CHESTNUT III HOUSING DEVELOPMEN T FUND COR
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3428952. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 31 new building, 1 alteration filing. Its latest status categories are 22 approved, 9 recorded as completed, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 254 Euclid Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 32 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Install temporary construction fence as per plans filed. Filing B00534235-I1.
Construct new fourteen (14) story mixed use building as per plans filed. Filing B00640786-I1.
PAA Amend previous approved plans dated 9/14/23 with the correct DOB Now job B00640786-P5 to the following sheets P-203.01, P-206.01, P-207.01, P-209.01, P-210.01, P-211.01, & P-214.01. See Supporting Documents of plans approved by previous Examiner. Filing B00640786-S3.
Install mechanical work as per plans filed. Filing B00640786-S2.
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy. Filing B00640786-S4.
Provide support of excavation work as per plans filed. Filing B00640786-S5.
Foundation work as per plans file in conjunction with B00640786-I1, no change to use, egress, or occupancy. Filing B00640786-S6.
Filing B00640786-S4 reached an approved status.
Structural work as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB# B00640786. Filing B00640786-S1.
Site drainage as per plans filed. filed in conjunction with nb# b00640786. Filing B00640786-S8.
Site Grading/Improvements as per plans filed. Filed in conjunction with NB# B00640786. Filing B00640786-S7.
Filing B00640786-S5 reached an approved status.
The latest status recorded for B00534235-I1 is “Objections.”
Filing B00640786-S3 reached an approved status.
Filing B00640786-S6 reached an approved status.
Filing B00640786-S1 reached an approved status.
Filing B00640786-I1 reached an approved status.
Filing B00640786-S8 reached an approved status.
Filing B00640786-S7 reached an approved status.
DOB lists a first permit date for B00640786-S5. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00640786-I1. That is not by itself confirmation of activity on site.
Filing B00640786-S2 reached an approved status.
DOB lists a first permit date for B00640786-S6. That is not by itself confirmation of activity on site.
Install mechanical work as per plans filed. Filing B00640786-P1.
Filing B00640786-P1 reached an approved status.
The latest status recorded for B00640786-P1 is “Approved.”
Provide support of excavation work as per plans filed. Filing B00640786-P2.
Filing B00640786-P2 reached an approved status.
The latest status recorded for B00640786-P2 is “Approved.”
DOB lists a first permit date for B00640786-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00640786-S3. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00640786-S8. That is not by itself confirmation of activity on site.
Install plumbing work as per plans filed. Filing B00640786-P3.
Filing B00640786-P3 reached an approved status.
The latest status recorded for B00640786-P3 is “Approved.”
DOB lists a first permit date for B00640786-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00640786-S7. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00640786-S4. That is not by itself confirmation of activity on site.
Install plumbing work as per plans filed. Filing B00640786-P5.
Filing B00640786-P5 reached an approved status.
The latest status recorded for B00640786-P5 is “Approved.”
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy. Filing B00640786-P6.
Filing B00640786-P6 reached an approved status.
The latest status recorded for B00640786-P6 is “Approved.”
Construct new fourteen (14) story mixed use building as per plans filed. Filing B00640786-P9.
Foundation work as per plans file in conjunction with B00640786-I1, no change to use, egress, or occupancy. Filing B00640786-A2.
Structural work as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB# B00640786. Filing B00640786-A1.
Filing B00640786-P9 reached an approved status.
The latest status recorded for B00640786-P9 is “Approved.”
Install plumbing work as per plans filed. Filing B00640786-P7.
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy. Filing B00640786-P8.
Filing B00640786-A1 reached an approved status.
The latest status recorded for B00640786-A1 is “Approved.”
Filing B00640786-A2 reached an approved status.
The latest status recorded for B00640786-A2 is “Approved.”
Filing B00640786-P8 reached an approved status.
The latest status recorded for B00640786-P8 is “Approved.”
Filing B00640786-P7 reached an approved status.
The latest status recorded for B00640786-P7 is “Approved.”
Install mechanical work as per plans filed. Filing B00640786-P4.
PAA Amend previous approved plans dated 9/14/23 with the correct DOB Now job B00640786-P5 to the following sheets P-203.01, P-206.01, P-207.01, P-209.01, P-210.01, P-211.01, & P-214.01. See Supporting Documents of plans approved by previous Examiner. Filing B00640786-A4.
Filing B00640786-P4 reached an approved status.
The latest status recorded for B00640786-P4 is “Approved.”
Filing B00640786-A4 reached an approved status.
The latest status recorded for B00640786-A4 is “Approved.”
Site drainage as per plans filed. filed in conjunction with nb# b00640786. Filing B00640786-A6.
Filing B00640786-A6 reached an approved status.
The latest status recorded for B00640786-A6 is “Approved.”
Install sprinkler standpipe as per plans filed, in conjunction with NB #B00640786-I1. No change to use egress or occupancy. Filing B00640786-A5.
Filing B00640786-A5 reached an approved status.
The latest status recorded for B00640786-A5 is “Approved.”
Site drainage as per plans filed. filed in conjunction with nb# b00640786. Filing B00640786-A7.
Filing B00640786-A7 reached an approved status.
The latest status recorded for B00640786-A7 is “Approved.”
Installation of mechanical ventilation and riser for an active sub-slab depressurization system. no change in use egress or occupancy. filed in conjunction with nb #b00640786-i1. Filing B00640786-Z2.
Install mechanical work as per plans filed. Filing B00640786-A9.
Construct new fourteen (14) story mixed use building as per plans filed. Filing B00640786-A8.
Filing B00640786-A8 reached an approved status.
The latest status recorded for B00640786-A8 is “Approved.”
Filing B00640786-A9 reached an approved status.
The latest status recorded for B00640786-A9 is “Approved.”
PAA Amend previous approved plans dated 9/14/23 with the correct DOB Now job B00640786-P5 to the following sheets P-203.01, P-206.01, P-207.01, P-209.01, P-210.01, P-211.01, & P-214.01. See Supporting Documents of plans approved by previous Examiner. Filing B00640786-B1.
Construct new fourteen (14) story mixed use building as per plans filed. Filing B00640786-B2.
Filing B00640786-Z2 reached an approved status.
Filing B00640786-B1 reached an approved status.
The latest status recorded for B00640786-B1 is “Approved.”
Filing B00640786-B2 reached an approved status.
The latest status recorded for B00640786-B2 is “Approved.”
DOB lists a first permit date for B00640786-Z2. That is not by itself confirmation of activity on site.
Install mechanical work as per plans filed. Filing B00640786-B4.
Filing B00640786-B4 reached an approved status.
The latest status recorded for B00640786-B4 is “Approved.”
PAA Amend previous approved plans dated 9/14/23 with the correct DOB Now job B00640786-P5 to the following sheets P-203.01, P-206.01, P-207.01, P-209.01, P-210.01, P-211.01, & P-214.01. See Supporting Documents of plans approved by previous Examiner. Filing B00640786-B5.
Filing B00640786-B5 reached an approved status.
The latest status recorded for B00640786-B5 is “Approved.”
DOB recorded a sign-off for B00640786-S1.
The latest status recorded for B00640786-S1 is “LOC Issued.”
DOB recorded a sign-off for B00640786-S2.
The latest status recorded for B00640786-S2 is “LOC Issued.”
DOB recorded a sign-off for B00640786-S4.
The latest status recorded for B00640786-S4 is “LOC Issued.”
DOB recorded a sign-off for B00640786-S6.
The latest status recorded for B00640786-S6 is “LOC Issued.”
DOB recorded a sign-off for B00640786-S7.
The latest status recorded for B00640786-S7 is “LOC Issued.”
DOB recorded a sign-off for B00640786-Z2.
The latest status recorded for B00640786-Z2 is “LOC Issued.”
DOB recorded a sign-off for B00640786-S5.
The latest status recorded for B00640786-S5 is “LOC Issued.”
DOB recorded a sign-off for B00640786-S3.
The latest status recorded for B00640786-S3 is “LOC Issued.”
DOB recorded a sign-off for B00640786-S8.
The latest status recorded for B00640786-S8 is “LOC Issued.”
The latest status recorded for B00640786-I1 is “Permit Entire.”