DOB filing B00465119-I1
Alteration filing at 975 Ocean Parkway
Building record · BIN 3429109
975 Ocean Parkway, Brooklyn, NY 11230
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 11 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3429109
975 Ocean Parkway
Mapleton-Midwood (West), Brooklyn
A consolidated public-record view · updated Aug 7, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 2.75-story one-family home built in 2022, on a 9,000 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429109. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 11 alteration filing. Its latest status categories are 5 recorded as completed, 6 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 975 Ocean Parkway.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 11 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Wood construction fence. Filing B00381488-I1.
Filing B00381488-I1 reached an approved status.
DOB lists a first permit date for B00381488-I1. That is not by itself confirmation of activity on site.
Install new fire sprinkler system in the entire building i.a.w. nfpa 13d 2007 edit, as modified by NYC bc appendix q as per plan. in conjunction with NYC DOB nb job #340797668. Filing B00465119-I1.
Filing B00465119-I1 reached an approved status.
Temp. construction fence. Filing B00458538-I1.
Alteration application for support of excavation filed in conjunction with NB application. Filing B00465334-I1.
Filing B00458538-I1 reached an approved status.
Alteration application to do foundation work. Filing B00465327-I1.
Structural application in conjunction with NB applicaiton. Filing B00458575-I1.
Plumbing application in conjunction with 340797668. Filing B00458571-I1.
Mechanical systems for new buildings. Filing B00458562-I1.
DOB recorded a sign-off for B00381488-I1.
DOB lists a first permit date for B00458538-I1. That is not by itself confirmation of activity on site.
Filing B00465327-I1 reached an approved status.
Filing B00458571-I1 reached an approved status.
Filing B00458575-I1 reached an approved status.
Filing B00458562-I1 reached an approved status.
DOB lists a first permit date for B00458575-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00458562-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00381488-I1 is “LOC Issued.”
DOB lists a first permit date for B00465327-I1. That is not by itself confirmation of activity on site.
Filing B00465334-I1 reached an approved status.
DOB lists a first permit date for B00465334-I1. That is not by itself confirmation of activity on site.
Alteration application for support of excavation filed in conjunction with NB application. Filing B00465334-P1.
Filing B00465334-P1 reached an approved status.
The latest status recorded for B00465334-P1 is “Approved.”
DOB lists a first permit date for B00458571-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00465119-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00458562-I1 is “Permit Entire.”
DOB recorded a sign-off for B00465334-I1.
The latest status recorded for B00465334-I1 is “LOC Issued.”
DOB recorded a sign-off for B00458575-I1.
The latest status recorded for B00458575-I1 is “LOC Issued.”
DOB recorded a sign-off for B00465327-I1.
The latest status recorded for B00465327-I1 is “LOC Issued.”
The latest status recorded for B00458538-I1 is “Permit Entire.”
Plumbing application in conjunction with 340797668. Filing B00458571-P1.
Filing B00458571-P1 reached an approved status.
The latest status recorded for B00458571-P1 is “Approved.”
Plumbing application in conjunction with 340797668. Filing B00458571-P2.
The latest status recorded for B00458571-I1 is “Permit Entire.”
Filing B00458571-P2 reached an approved status.
The latest status recorded for B00458571-P2 is “Approved.”
DOB recorded a sign-off for B00465119-I1.
The latest status recorded for B00465119-I1 is “LOC Issued.”