Building record · BIN 3429149

679 Marcy Avenue

679 Marcy Avenue, Brooklyn, NY 11216

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 17 independently sourced records, including 11 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3429149

679 Marcy Avenue

Bedford-Stuyvesant (West), Brooklyn

A consolidated public-record view · updated Nov 8, 2024

DOB filings
17
Active-status
11
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings17
Open or active-status records11
First included filingJun 9, 2020
Latest recorded changeNov 8, 2024

The lot

What is already here?

The lot holds a 6-story elevator apartment building built in 2024, with 10 homes, on a 2,500 sq ft lot.

Built
2024
Last altered
2020
Floors
6
Residential units
10
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7A
Lot area
2,500 sq ft
Building area
9,176 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 2 notices are on file, all with a recorded resolution.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429149. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 17 alteration filing. Its latest status categories are 6 recorded as completed, 11 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jun 9, 2020
Latest recorded change
Nov 8, 2024
Highest proposed story count
6 stories
Highest proposed unit count
10 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 679 Marcy Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 17 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Structural application filed in conjunction to new building job # 321591871. Filing B00351807-I1.

    01
  2. Alteration filed

    Plumbing application filed in conjunction to new building job #321591871. Filing B00373825-I1.

    02
  3. Alteration filed

    Sprinkler application filed in conjunction to new building job #321591871. Filing B00373780-I1.

    03
  4. Alteration filed

    Installation of mechanical ventilation systems, heating and cooling equipments, hot water heater equipments, energy recovery systems, andductwork in-conjunction with nb application # 321591871. Filing B00373676-I1.

    04
  5. Alteration approved

    Filing B00373825-I1 reached an approved status.

    05
  6. Alteration filed

    Installation of sidewalk shed and overhead protectionas per plans. sidewalk shed live load will be 300 psf, shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy. Filing B00431018-I1.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for B00431018-I1. That is not by itself confirmation of activity on site.

    07
  8. Alteration filed

    Proposed construction fence, no change to use, egress or occupancy under this application. Filing B00362442-I1.

    08
  9. Alteration approved

    Filing B00362442-I1 reached an approved status.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for B00362442-I1. That is not by itself confirmation of activity on site.

    010
  11. Alteration approved

    Filing B00351807-I1 reached an approved status.

    011
  12. Alteration approved

    Filing B00373676-I1 reached an approved status.

    012
  13. Alteration filed

    Structural application filed in conjunction to new building job #321591871. Filing B00351807-P1.

    013
  14. Alteration approved

    Filing B00351807-P1 reached an approved status.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for B00351807-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration now approved

    The latest status recorded for B00351807-P1 is “Approved.”

    016
  17. Alteration signed off

    DOB recorded a sign-off for B00431018-I1.

    017
  18. Alteration now completed

    The latest status recorded for B00431018-I1 is “LOC Issued.”

    018
  19. Alteration filed

    Structural application filed in conjunction to new building job # 321591871. Filing B00351807-P2.

    019
  20. Alteration approved

    Filing B00351807-P2 reached an approved status.

    020
  21. Alteration now approved

    The latest status recorded for B00351807-P2 is “Approved.”

    021
  22. Alteration filed

    Installation of mechanical ventilation systems, heating and cooling equipments, hot water heater equipments, energy recovery systems, andductwork in-conjunction with nb application # 321591871. Filing B00373676-P1.

    022
  23. Alteration filed

    Plumbing application filed in conjunction to new building job #321591871. Filing B00373825-P1.

    023
  24. Alteration approved

    Filing B00373780-I1 reached an approved status.

    024
  25. Alteration approved

    Filing B00373825-P1 reached an approved status.

    025
  26. Alteration now approved

    The latest status recorded for B00373825-P1 is “Approved.”

    026
  27. Alteration approved

    Filing B00373676-P1 reached an approved status.

    027
  28. Alteration now approved

    The latest status recorded for B00373676-P1 is “Approved.”

    028
  29. Permit recorded for alteration

    DOB lists a first permit date for B00373676-I1. That is not by itself confirmation of activity on site.

    029
  30. Alteration filed

    Installation of mechanical ventilation systems, heating and cooling equipments, hot water heater equipments, energy recovery systems, andductwork in-conjunction with nb application # 321591871. Filing B00373676-P2.

    030
  31. Alteration filed

    Plumbing application filed in conjunction to new building job #321591871. Filing B00373825-P3.

    031
  32. Alteration filed

    Sprinkler application filed in conjunction to new building job #321591871. Filing B00373780-P1.

    032
  33. Alteration approved

    Filing B00373780-P1 reached an approved status.

    033
  34. Alteration now approved

    The latest status recorded for B00373780-P1 is “Approved.”

    034
  35. Permit recorded for alteration

    DOB lists a first permit date for B00373825-I1. That is not by itself confirmation of activity on site.

    035
  36. Alteration approved

    Filing B00373825-P3 reached an approved status.

    036
  37. Alteration now approved

    The latest status recorded for B00373825-P3 is “Approved.”

    037
  38. Alteration approved

    Filing B00373676-P2 reached an approved status.

    038
  39. Alteration now approved

    The latest status recorded for B00373676-P2 is “Approved.”

    039
  40. Alteration filed

    Structural application filed in conjunction to new building job # 321591871. Filing B00351807-P3.

    040
  41. Alteration approved

    Filing B00351807-P3 reached an approved status.

    041
  42. Alteration now approved

    The latest status recorded for B00351807-P3 is “Approved.”

    042
  43. Permit recorded for alteration

    DOB lists a first permit date for B00373780-I1. That is not by itself confirmation of activity on site.

    043
  44. Alteration filed

    Plumbing application filed in conjunction to new building job #321591871. Filing B00373825-P5.

    044
  45. Alteration signed off

    DOB recorded a sign-off for B00351807-I1.

    045
  46. Alteration now completed

    The latest status recorded for B00351807-I1 is “LOC Issued.”

    046
  47. Alteration approved

    Filing B00373825-P5 reached an approved status.

    047
  48. Alteration now approved

    The latest status recorded for B00373825-P5 is “Approved.”

    048
  49. Alteration signed off

    DOB recorded a sign-off for B00362442-I1.

    049
  50. Alteration now completed

    The latest status recorded for B00362442-I1 is “LOC Issued.”

    050
  51. Alteration filed

    Installation of mechanical ventilation systems, heating and cooling equipments, hot water heater equipments, energy recovery systems, andductwork in-conjunction with nb application # 321591871. Filing B00373676-P3.

    051
  52. Alteration approved

    Filing B00373676-P3 reached an approved status.

    052
  53. Alteration now approved

    The latest status recorded for B00373676-P3 is “Approved.”

    053
  54. Alteration filed

    Sprinkler application filed in conjunction to new building job #321591871. Filing B00373780-P2.

    054
  55. Alteration approved

    Filing B00373780-P2 reached an approved status.

    055
  56. Alteration now approved

    The latest status recorded for B00373780-P2 is “Approved.”

    056
  57. Alteration signed off

    DOB recorded a sign-off for B00373676-I1.

    057
  58. Alteration now completed

    The latest status recorded for B00373676-I1 is “LOC Issued.”

    058
  59. Alteration signed off

    DOB recorded a sign-off for B00373780-I1.

    059
  60. Alteration now completed

    The latest status recorded for B00373780-I1 is “LOC Issued.”

    060
  61. Alteration signed off

    DOB recorded a sign-off for B00373825-I1.

    061
  62. Alteration now completed

    The latest status recorded for B00373825-I1 is “LOC Issued.”

    062