Building record · BIN 3429190

175A Buffalo Avenue

175A Buffalo Avenue, Brooklyn, NY 11213

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 9 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3429190

175A Buffalo Avenue

Crown Heights (North), Brooklyn

A consolidated public-record view · updated Sep 7, 2023

DOB filings
9
Active-status
4
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings9
Open or active-status records4
First included filingOct 6, 2021
Latest recorded changeSep 7, 2023

The lot

What is already here?

The lot holds a 2-story two-family home built in 2022, on a 1,783 sq ft lot.

  1. Floor 2Homes2 homes are recorded on this lot — about 2 homes to a floor. The city does not publish which floor any of them is on.
  2. Floor 1Street levelStreet level. The lot is recorded as one and two family homes.
  • Street levelOne and two family homes
  • Homes2 recorded on the lot
  • Above the southern skylineFrom about floor 9 — the tallest thing within 60 m to the south is 25 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 7.6 m over 2 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
2022
Last altered
2022
Floors
2
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R6
Lot area
1,783 sq ft
Building area
2,140 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429190. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 5 new building, 4 alteration filing. Its latest status categories are 5 recorded as completed, 4 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Oct 6, 2021
Latest recorded change
Sep 7, 2023
Highest proposed story count
2 stories
Highest proposed unit count
2 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 175A Buffalo Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 9 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    New building two family. Filing B00595100-I1.

    01
  2. Alteration filed

    Installation of temporary construction fence for new builidng around construction site. Filing B00596056-I1.

    02
  3. Alteration approved

    Filing B00596056-I1 reached an approved status.

    03
  4. Alteration filed

    Plumbing application in conjunction with new building application. Filing B00596038-I1.

    04
  5. Alteration approved

    Filing B00596038-I1 reached an approved status.

    05
  6. New building filed

    Exhaust fan added to the new bathroom . new electric heating and cooling split system. Filing B00595100-S1.

    06
  7. New building approved

    Filing B00595100-I1 reached an approved status.

    07
  8. Permit recorded for new building

    DOB lists a first permit date for B00595100-I1. That is not by itself confirmation of activity on site.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for B00596056-I1. That is not by itself confirmation of activity on site.

    09
  10. New building approved

    Filing B00595100-S1 reached an approved status.

    010
  11. New building filed

    Install sprinkler system for this NB. Filing B00595100-S2.

    011
  12. New building approved

    Filing B00595100-S2 reached an approved status.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for B00596038-I1. That is not by itself confirmation of activity on site.

    013
  14. Permit recorded for new building

    DOB lists a first permit date for B00595100-S2. That is not by itself confirmation of activity on site.

    014
  15. Alteration filed

    Plumbing application in conjunction with new building application. Filing B00596038-P1.

    015
  16. Alteration approved

    Filing B00596038-P1 reached an approved status.

    016
  17. Alteration now approved

    The latest status recorded for B00596038-P1 is “Approved.”

    017
  18. Permit recorded for new building

    DOB lists a first permit date for B00595100-S1. That is not by itself confirmation of activity on site.

    018
  19. New building filed

    New building two family. Filing B00595100-P1.

    019
  20. New building approved

    Filing B00595100-P1 reached an approved status.

    020
  21. New building now approved

    The latest status recorded for B00595100-P1 is “Approved.”

    021
  22. Alteration signed off

    DOB recorded a sign-off for B00596056-I1.

    022
  23. Alteration now completed

    The latest status recorded for B00596056-I1 is “LOC Issued.”

    023
  24. New building signed off

    DOB recorded a sign-off for B00595100-S1.

    024
  25. Alteration filed

    Plumbing application in conjunction with new building application. Filing B00596038-P2.

    025
  26. Alteration approved

    Filing B00596038-P2 reached an approved status.

    026
  27. Alteration now approved

    The latest status recorded for B00596038-P2 is “Approved.”

    027
  28. New building signed off

    DOB recorded a sign-off for B00595100-S2.

    028
  29. Alteration signed off

    DOB recorded a sign-off for B00596038-I1.

    029
  30. Alteration now completed

    The latest status recorded for B00596038-I1 is “LOC Issued.”

    030
  31. New building filed

    New building two family. Filing B00595100-P2.

    031
  32. New building approved

    Filing B00595100-P2 reached an approved status.

    032
  33. New building now approved

    The latest status recorded for B00595100-P2 is “Approved.”

    033
  34. New building now completed

    The latest status recorded for B00595100-S1 is “LOC Issued.”

    034
  35. New building now completed

    The latest status recorded for B00595100-S2 is “LOC Issued.”

    035
  36. New building now completed

    The latest status recorded for B00595100-I1 is “CO Issued.”

    036