Building record · BIN 3429584

540 Degraw Street

540 Degraw Street, Brooklyn, NY 11217

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 21 independently sourced records, including 21 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3429584

540 Degraw Street

Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn

A consolidated public-record view · updated Aug 24, 2026

DOB filings
21
Active-status
21
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings21
Open or active-status records21
First included filingOct 28, 2021
Latest recorded changeAug 24, 2026

The lot

What is already here?

The lot holds a 10-story elevator apartment building built in 2025, with 225 homes, on a 48,500 sq ft lot.

Built
2025
Last altered
2021
Floors
10
Residential units
225
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
M1-4/R7X
Lot area
48,500 sq ft
Building area
304,485 sq ft

Owner of record

DEGRAW HOLDINGS LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429584. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 20 new building, 1 alteration filing. Its latest status categories are 1 under review, 20 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Oct 28, 2021
Latest recorded change
Aug 24, 2026
Highest proposed story count
10 stories
Highest proposed unit count
255 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 540 Degraw Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 21 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    Development hub. this job to be filed with the development hub. initial consultation occurred on september 27th,2021. erect 10 story mixed use new building. Filing B00600959-I1.

    01
  2. New building filed

    Underground plumbing being filed for new building. Filing B00600959-S2.

    02
  3. New building approved

    Filing B00600959-S2 reached an approved status.

    03
  4. New building filed

    Foundation work being filed for new building application. Filing B00600959-S1.

    04
  5. New building filed

    SOE work in conjunction with NB Construction. Filing B00600959-S4.

    05
  6. Alteration filed

    Curb cut being filed for parking garage. application being filed in conjunction with nb #b00600959. Filing B00617085-I1.

    06
  7. New building approved

    Filing B00600959-S4 reached an approved status.

    07
  8. Alteration approved

    Filing B00617085-I1 reached an approved status.

    08
  9. New building approved

    Filing B00600959-S1 reached an approved status.

    09
  10. New building filed

    Plumbing work filed in conjunction with NB Construction. Filing B00600959-S3.

    010
  11. New building filed

    Application filed for mechanical work in conjunction with NB Construction. Filing B00600959-S7.

    011
  12. New building filed

    Structural work associated with NB Construction. Filing B00600959-S6.

    012
  13. New building filed

    Installation of temporary, dry standpipe system as per plans. Filed in conjunction with NB Construction. Filing B00600959-S9.

    013
  14. New building filed

    Installation of sprinkler/standpipe system in conjunction with NB Construction. Filing B00600959-S8.

    014
  15. New building approved

    Filing B00600959-S9 reached an approved status.

    015
  16. New building approved

    Filing B00600959-S6 reached an approved status.

    016
  17. New building approved

    Filing B00600959-S3 reached an approved status.

    017
  18. Permit recorded for new building

    DOB lists a first permit date for B00600959-S1. That is not by itself confirmation of activity on site.

    018
  19. Permit recorded for new building

    DOB lists a first permit date for B00600959-S4. That is not by itself confirmation of activity on site.

    019
  20. New building approved

    Filing B00600959-S8 reached an approved status.

    020
  21. New building filed

    Installation of temporary, dry standpipe system as per plans. Filed in conjunction with NB Construction. Filing B00600959-P1.

    021
  22. New building approved

    Filing B00600959-P1 reached an approved status.

    022
  23. New building approved

    Filing B00600959-S7 reached an approved status.

    023
  24. Permit recorded for new building

    DOB lists a first permit date for B00600959-S6. That is not by itself confirmation of activity on site.

    024
  25. New building approved

    Filing B00600959-I1 reached an approved status.

    025
  26. New building filed

    Application filed for pile installation only. Pile Caps designed and installed under B00600959-S1. Filing B00600959-Z1.

    026
  27. New building approved

    Filing B00600959-Z1 reached an approved status.

    027
  28. Permit recorded for new building

    DOB lists a first permit date for B00600959-S7. That is not by itself confirmation of activity on site.

    028
  29. Permit recorded for new building

    DOB lists a first permit date for B00600959-S8. That is not by itself confirmation of activity on site.

    029
  30. Permit recorded for new building

    DOB lists a first permit date for B00600959-S9. That is not by itself confirmation of activity on site.

    030
  31. Permit recorded for new building

    DOB lists a first permit date for B00600959-I1. That is not by itself confirmation of activity on site.

    031
  32. New building now approved

    The latest status recorded for B00600959-P1 is “Approved.”

    032
  33. Alteration now approved

    The latest status recorded for B00617085-I1 is “Approved.”

    033
  34. New building filed

    Structural work associated with NB Construction. Filing B00600959-P2.

    034
  35. New building filed

    Foundation work being filed for new building application. Filing B00600959-P3.

    035
  36. New building approved

    Filing B00600959-P2 reached an approved status.

    036
  37. New building now approved

    The latest status recorded for B00600959-P2 is “Approved.”

    037
  38. New building approved

    Filing B00600959-P3 reached an approved status.

    038
  39. New building now approved

    The latest status recorded for B00600959-P3 is “Approved.”

    039
  40. New building filed

    Foundation work being filed for new building application. Filing B00600959-P4.

    040
  41. New building approved

    Filing B00600959-P4 reached an approved status.

    041
  42. New building now approved

    The latest status recorded for B00600959-P4 is “Approved.”

    042
  43. New building filed

    SOE work in conjunction with NB Construction. Filing B00600959-P5.

    043
  44. New building approved

    Filing B00600959-P5 reached an approved status.

    044
  45. New building now approved

    The latest status recorded for B00600959-P5 is “Approved.”

    045
  46. New building filed

    Foundation work being filed for new building application. Filing B00600959-P6.

    046
  47. New building filed

    Application filed for pile installation only. Pile Caps designed and installed under B00600959-S1. Filing B00600959-P7.

    047
  48. New building approved

    Filing B00600959-P6 reached an approved status.

    048
  49. New building now approved

    The latest status recorded for B00600959-P6 is “Approved.”

    049
  50. New building approved

    Filing B00600959-P7 reached an approved status.

    050
  51. New building now approved

    The latest status recorded for B00600959-P7 is “Approved.”

    051
  52. New building now approved

    The latest status recorded for B00600959-Z1 is “Approved.”

    052
  53. Permit recorded for new building

    DOB lists a first permit date for B00600959-S3. That is not by itself confirmation of activity on site.

    053
  54. Permit recorded for new building

    DOB lists a first permit date for B00600959-S2. That is not by itself confirmation of activity on site.

    054
  55. New building now approved

    The latest status recorded for B00600959-S8 is “Permit Entire.”

    055
  56. New building now approved

    The latest status recorded for B00600959-S9 is “Permit Entire.”

    056
  57. New building now approved

    The latest status recorded for B00600959-S4 is “Permit Entire.”

    057
  58. New building filed

    Foundation work being filed for new building application. Filing B00600959-P8.

    058
  59. New building approved

    Filing B00600959-P8 reached an approved status.

    059
  60. New building now approved

    The latest status recorded for B00600959-P8 is “Approved.”

    060
  61. New building now approved

    The latest status recorded for B00600959-I1 is “Permit Entire.”

    061
  62. New building now approved

    The latest status recorded for B00600959-S7 is “Permit Entire.”

    062
  63. New building filed

    Development hub. this job to be filed with the development hub. initial consultation occurred on september 27th,2021. erect 10 story mixed use new building. Filing B00600959-P9.

    063
  64. New building now approved

    The latest status recorded for B00600959-S2 is “Permit Entire.”

    064
  65. New building now approved

    The latest status recorded for B00600959-S3 is “Permit Entire.”

    065
  66. New building now approved

    The latest status recorded for B00600959-S1 is “Permit Entire.”

    066
  67. New building now approved

    The latest status recorded for B00600959-S6 is “Permit Entire.”

    067
  68. New building filed

    Supported Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy. Filing B00600959-Z2.

    068
  69. New building approved

    Filing B00600959-Z2 reached an approved status.

    069
  70. Permit recorded for new building

    DOB lists a first permit date for B00600959-Z2. That is not by itself confirmation of activity on site.

    070
  71. New building now approved

    The latest status recorded for B00600959-Z2 is “Permit Entire.”

    071
  72. New building now under review

    The latest status recorded for B00600959-P9 is “Plan Examiner Review.”

    072