DOB filing B01314944-I1
Alteration filing at 180 Ashland Place
Building record · BIN 3429595
180 Ashland Place, Brooklyn, NY 11217
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 26 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3429595
180 Ashland Place
Fort Greene, Brooklyn
A consolidated public-record view · updated Sep 14, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 51-story elevator apartment building built in 2023, with 569 homes, on a 19,581 sq ft lot.
Housing violations
15 violations are open against this address under the Housing Maintenance Code. 1 of them is the class the city calls immediately hazardous.
Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.
The apartments
266 condominium apartments are assessed on this block, and the typical one is 1,007 sq ft (94 m²). They run from 47 to 157 m².
The city values the typical one at $270,525. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
4 apartments on this tax block changed hands in the year the city last published, at a median of $1,285,000, from 625,000 to 1,500,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
NYC TRANSIT
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429595. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 26 alteration filing. Its latest status categories are 6 approved, 20 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 180 Ashland Place.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 26 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Non illuminated non advertising accessory sign - inside property line. no change to use, egress or occupancy. Filing B00001933-I1.
Non illuminated non advertising accessory sign - inside property line. no change to use, egress or occupancy. Filing B00001935-I1.
Filing B00001935-I1 reached an approved status.
Filing B00001933-I1 reached an approved status.
DOB lists a first permit date for B00001933-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00001935-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00001933-I1.
DOB recorded a sign-off for B00001935-I1.
Installation of heavy duty sidewalk shed during bldg dm, filed sep. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occ or egress under this app. outer shed leg to be installed on rdwy. dot permits by others. Filing B00539009-I1.
Installation of heavy duty sidewalk shed during bldg dm, filed sep. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occ or egress under this app. outer shed leg to be installed on rdwy. dot permits by others. Filing B00538683-I1.
Installation of scaffold as per drawings. scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00539018-I1.
Installation of heavy duty sidewalk shed during bldg demolition, filed sep. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00538999-I1.
Installation of scaffold as per drawings. scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00539005-I1.
DOB lists a first permit date for B00539009-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00538683-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00539018-I1. That is not by itself confirmation of activity on site.
Installation of temporary roof-overhead protection at adjacent properties during new building construction, filed sep. roof-overhead protection shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00561282-I1.
DOB lists a first permit date for B00561282-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00538999-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00539005-I1. That is not by itself confirmation of activity on site.
Hereby filing to install mechanical systems for NB#321590113 as shown on plans filed herewith. Filing B00427693-I1.
Filing B00427693-I1 reached an approved status.
Removal of sprinkler system from floors cellar, 001-004, prior to full demolition. Filing B00535465-I1.
DOB lists a first permit date for B00535465-I1. That is not by itself confirmation of activity on site.
Installation of scaffold as per drawings. scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00538696-I1.
DOB lists a first permit date for B00538696-I1. That is not by itself confirmation of activity on site.
Installation of a plywood construction fence as per drawings during general construction work. no change in use, egress or occupancy. construction fence to comply with NYC building code of 2014. Filing B00615688-I1.
Installation of a plywood construction fence as per drawings during general construction work. no change in use, egress or occupancy. construction fence to comply with NYC building code of 2014. Filing B00615642-I1.
Installation of a plywood construction fence as per drawings during general construction work. no change in use, egress or occupancy. construction fence to comply with NYC building code of 2014. Filing B00615654-I1.
DOB lists a first permit date for B00615688-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00615642-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00615654-I1. That is not by itself confirmation of activity on site.
Installation of plywood fence as per drawings during bldg demolition, filed sep. plywood fence shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00640847-I1.
Installation of plywood fence as per drawings during bldg demolition, filed sep. plywood fence shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00640868-I1.
Installation of plywood fence as per drawings during bldg demolition, filed sep. plywood fence shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00640885-I1.
DOB lists a first permit date for B00640885-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00640847-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00640868-I1. That is not by itself confirmation of activity on site.
Hereby filing structural framework for NB#321590113 as shown on plans filed herewith. Filing B00427648-I1.
Installation of temporary cantilevered platform as per drawings. cantilevered platform shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00558071-I1.
DOB lists a first permit date for B00558071-I1. That is not by itself confirmation of activity on site.
Installation of temporary cantilevered platform as per drawings. cantilevered platform shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00558071-P1.
Filing B00558071-P1 reached an approved status.
Filing B00427648-I1 reached an approved status.
Hereby filing to install new plumbing fixtures and related piping for NB#321590113 as shown on plans filed herewith. Filing B00427674-I1.
DOB recorded a sign-off for B00539018-I1.
Installation of scaffold as per drawings. scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00538696-P1.
Filing B00538696-P1 reached an approved status.
Filing B00427674-I1 reached an approved status.
DOB lists a first permit date for B00427674-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00558071-I1.
The latest status recorded for B00001933-I1 is “LOC Issued.”
The latest status recorded for B00001935-I1 is “LOC Issued.”
The latest status recorded for B00538696-P1 is “Approved.”
The latest status recorded for B00539018-I1 is “LOC Issued.”
The latest status recorded for B00558071-I1 is “LOC Issued.”
The latest status recorded for B00558071-P1 is “Approved.”
DOB recorded a sign-off for B00538683-I1.
The latest status recorded for B00538683-I1 is “LOC Issued.”
DOB recorded a sign-off for B00640847-I1.
The latest status recorded for B00640847-I1 is “LOC Issued.”
DOB recorded a sign-off for B00640868-I1.
The latest status recorded for B00640868-I1 is “LOC Issued.”
DOB recorded a sign-off for B00640885-I1.
The latest status recorded for B00640885-I1 is “LOC Issued.”
DOB recorded a sign-off for B00538696-I1.
The latest status recorded for B00538696-I1 is “LOC Issued.”
DOB lists a first permit date for B00427648-I1. That is not by itself confirmation of activity on site.
Installation of temporary roof-overhead protection at adjacent properties during new building construction, filed sep. roof-overhead protection shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B00561282-P1.
Filing B00561282-P1 reached an approved status.
The latest status recorded for B00561282-P1 is “Approved.”
DOB recorded a sign-off for B00538999-I1.
The latest status recorded for B00538999-I1 is “LOC Issued.”
DOB recorded a sign-off for B00539005-I1.
The latest status recorded for B00539005-I1 is “LOC Issued.”
DOB recorded a sign-off for B00539009-I1.
The latest status recorded for B00539009-I1 is “LOC Issued.”
DOB lists a first permit date for B00427693-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00535465-I1.
The latest status recorded for B00535465-I1 is “LOC Issued.”
Hereby filing to install mechanical systems for NB#321590113 as shown on plans filed herewith. Filing B00427693-P1.
Filing B00427693-P1 reached an approved status.
The latest status recorded for B00427693-P1 is “Approved.”
DOB recorded a sign-off for B00427693-I1.
The latest status recorded for B00427693-I1 is “LOC Issued.”
Hereby filing to install new plumbing fixtures and related piping for NB#321590113 as shown on plans filed herewith. Filing B00427674-P1.
Filing B00427674-P1 reached an approved status.
The latest status recorded for B00427674-P1 is “Approved.”
DOB recorded a sign-off for B00427674-I1.
The latest status recorded for B00427674-I1 is “LOC Issued.”
DOB recorded a sign-off for B00561282-I1.
The latest status recorded for B00561282-I1 is “LOC Issued.”
DOB recorded a sign-off for B00615688-I1.
The latest status recorded for B00615688-I1 is “LOC Issued.”
DOB recorded a sign-off for B00615642-I1.
The latest status recorded for B00615642-I1 is “LOC Issued.”
DOB recorded a sign-off for B00615654-I1.
The latest status recorded for B00615654-I1 is “LOC Issued.”
DOB recorded a sign-off for B00427648-I1.
The latest status recorded for B00427648-I1 is “LOC Issued.”
Hereby filing to install a 20' curb cut on the DeKalb Ave inconjuction with NB#321590113 as shown on plans filed herewith. Filing B01314944-I1.
Filing B01314944-I1 reached an approved status.
The latest status recorded for B01314944-I1 is “Approved.”