DOB filing B00519475-I1
New building at 80 20 Street
Building record · BIN 3429610
80 20 Street, Brooklyn, NY 11232
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 30 independently sourced records, including 17 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3429610
80 20 Street
Sunset Park (West), Brooklyn
A consolidated public-record view · updated Aug 20, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
Violation record
No open violations are recorded for this building. 2 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429610. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 23 new building, 7 alteration filing. Its latest status categories are 17 approved, 12 recorded as completed, 1 closed or withdrawn. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 80 20 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 30 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Construct new five (5) story office building and accessory parking garage. Filing B00519475-I1.
Provide support of excavation work per plans filed herewith. Filing B00519475-S2.
Filing B00519475-S2 reached an approved status.
Install 32 ft. curb cut as per plans filed to provide access to parking garage as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# B00519475. Filing B00576033-I1.
Install 33.5 ft. curb cut as per plans filed to provide access to parking garage as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# B00519475. Filing B00576050-I1.
Install 15 ft. curb cut as per plans filed to provide access to parking garage as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# B00519475. Filing B00576063-I1.
Underground plumbing per plans filed. Filed in conjunction with New Building # B00519475. Filing B00618438-I1.
Install foundation as per plans filed herewith. Filing B00519475-S3.
Filing B00618438-I1 reached an approved status.
Mechanical work as per plans filed.. Filing B00519475-S5.
Plumbing work as per plans filed.. Filing B00519475-S6.
Install combined sprinkler/standpipe system as per plans filed herewith. filed in conjunction with nb b00519475-i1. Filing B00638169-I1.
Structural work as per plans filed. Filing B00519475-S4.
Filing B00519475-S4 reached an approved status.
Filing B00519475-S3 reached an approved status.
DOB lists a first permit date for B00519475-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00519475-S3. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00618438-I1. That is not by itself confirmation of activity on site.
Filing B00638169-I1 reached an approved status.
Install foundation as per plans filed herewith. Filing B00519475-P1.
Filing B00519475-P1 reached an approved status.
Identification of Deep Foundation Elements and pile types proposed. Filing B00519475-S7.
Provide support of excavation work per plans filed herewith. Filing B00519475-P2.
Filing B00519475-P2 reached an approved status.
DOB lists a first permit date for B00519475-S4. That is not by itself confirmation of activity on site.
Filing B00519475-S7 reached an approved status.
Filing B00576063-I1 reached an approved status.
Filing B00576033-I1 reached an approved status.
Filing B00576050-I1 reached an approved status.
Filing B00519475-I1 reached an approved status.
DOB lists a first permit date for B00519475-I1. That is not by itself confirmation of activity on site.
Filing B00519475-S5 reached an approved status.
Filing B00519475-S6 reached an approved status.
Provide support of excavation work per plans filed herewith. Filing B00519475-P3.
Plumbing work as per plans filed.. Filing B00519475-P8.
Install combined sprinkler/standpipe system as per plans filed herewith. filed in conjunction with nb b00519475-i1. Filing B00638169-P1.
Install foundation as per plans filed herewith. Filing B00519475-P4.
Filing B00638169-P1 reached an approved status.
DOB lists a first permit date for B00519475-S6. That is not by itself confirmation of activity on site.
Filing B00519475-P8 reached an approved status.
DOB lists a first permit date for B00638169-I1. That is not by itself confirmation of activity on site.
Filing B00519475-P4 reached an approved status.
The latest status recorded for B00519475-P1 is “Approved.”
The latest status recorded for B00519475-P2 is “Approved.”
The latest status recorded for B00519475-P4 is “Approved.”
The latest status recorded for B00519475-P8 is “Approved.”
The latest status recorded for B00638169-P1 is “Approved.”
Installation of boiler as per plans filed herewith. No change to use, egress or occupancy. Filed in conjunction with NB#. Filing B00519475-Z1.
Filing B00519475-Z1 reached an approved status.
DOB lists a first permit date for B00519475-Z1. That is not by itself confirmation of activity on site.
Filing B00519475-P3 reached an approved status.
The latest status recorded for B00519475-P3 is “Approved.”
Structural work as per plans filed. Filing B00519475-P5.
Filing B00519475-P5 reached an approved status.
The latest status recorded for B00519475-P5 is “Approved.”
DOB lists a first permit date for B00576063-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00576033-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00576050-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00519475-S5. That is not by itself confirmation of activity on site.
Plumbing work as per plans filed.. Filing B00519475-A2.
Identification of Deep Foundation Elements and pile types proposed. Filing B00519475-A5.
Filing B00519475-A2 reached an approved status.
The latest status recorded for B00519475-A2 is “Approved.”
Construct new five (5) story office building and accessory parking garage. Filing B00519475-A3.
Plumbing work as per plans filed.. Filing B00519475-A6.
Mechanical work as per plans filed.. Filing B00519475-A4.
DOB recorded a sign-off for B00519475-S2.
The latest status recorded for B00519475-S2 is “LOC Issued.”
DOB lists a first permit date for B00519475-S7. That is not by itself confirmation of activity on site.
Filing B00519475-A5 reached an approved status.
The latest status recorded for B00519475-A5 is “Approved.”
Filing B00519475-A6 reached an approved status.
The latest status recorded for B00519475-A6 is “Approved.”
The latest status recorded for B00519475-A1 is “Filing Withdrawn.”
Filing B00519475-A4 reached an approved status.
The latest status recorded for B00519475-A4 is “Approved.”
DOB recorded a sign-off for B00576050-I1.
The latest status recorded for B00576050-I1 is “LOC Issued.”
DOB recorded a sign-off for B00576063-I1.
The latest status recorded for B00576063-I1 is “LOC Issued.”
Filing B00519475-A3 reached an approved status.
The latest status recorded for B00519475-A3 is “Approved.”
DOB recorded a sign-off for B00519475-S7.
The latest status recorded for B00519475-S7 is “LOC Issued.”
DOB recorded a sign-off for B00618438-I1.
The latest status recorded for B00618438-I1 is “LOC Issued.”
Installation of boiler as per plans filed herewith. No change to use, egress or occupancy. Filed in conjunction with NB#. Filing B00519475-A7.
Filing B00519475-A7 reached an approved status.
The latest status recorded for B00519475-A7 is “Approved.”
DOB recorded a sign-off for B00576033-I1.
The latest status recorded for B00576033-I1 is “LOC Issued.”
DOB recorded a sign-off for B00519475-S3.
The latest status recorded for B00519475-S3 is “LOC Issued.”
DOB recorded a sign-off for B00519475-S4.
The latest status recorded for B00519475-S4 is “LOC Issued.”
DOB recorded a sign-off for B00519475-Z1.
The latest status recorded for B00519475-Z1 is “LOC Issued.”
Construct new five (5) story office building and accessory parking garage. Filing B00519475-A8.
Filing B00519475-A8 reached an approved status.
The latest status recorded for B00519475-A8 is “Approved.”
Install combined sprinkler/standpipe system as per plans filed herewith. filed in conjunction with nb b00519475-i1. Filing B00638169-P2.
Filing B00638169-P2 reached an approved status.
The latest status recorded for B00638169-P2 is “Approved.”
DOB recorded a sign-off for B00638169-I1.
The latest status recorded for B00638169-I1 is “LOC Issued.”
DOB recorded a sign-off for B00519475-S5.
The latest status recorded for B00519475-S5 is “LOC Issued.”
DOB recorded a sign-off for B00519475-S6.
The latest status recorded for B00519475-S6 is “LOC Issued.”
Construct new five (5) story office building and accessory parking garage. Filing B00519475-B4.
Filing B00519475-B4 reached an approved status.
The latest status recorded for B00519475-B4 is “Approved.”
The latest status recorded for B00519475-I1 is “Permit Entire.”