DOB filing B01429462-I1
Alteration filing at 737 4 Avenue
Building record · BIN 3429685
201 25 Street, Brooklyn, NY 11232
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 37 independently sourced records, including 33 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3429685
201 25 Street
Sunset Park (West), Brooklyn
A consolidated public-record view · updated Sep 14, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 14.5-story elevator apartment building built in 2024, with 187 homes, on a 20,034 sq ft lot.
Owner of record
JENNIE & RAY INC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 5 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429685. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 4 alteration filing, 33 new building. Its latest status categories are 4 under review, 29 approved, 4 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 201 25 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 37 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
New 14-story mixed use building. Filing B00580365-I1.
Sprinkler/Standpipe work in conjunction w/construction of 14-story new building. Filing B00580365-S7.
Foundation work as show on plans filed herewith. Superstructure, SOE, Underpinning filed separately (S3, S2, S6, respectively). Filing B00580365-S8.
Superstructure in conjunction w/ construction of 14-story new building. Foundation, SOE, Underpinning, filed separately (S8, S2, S6, respectively). Filing B00580365-S3.
Plumbing work in conjunction w/construction of 14-story new building. Filing B00580365-S5.
Mechanical work in conjunction w/construction of 14-story new building. Filing B00580365-S4.
Underpinning in conjunction w/construction of 14-story new building. SOE, Foundation, and Superstructure work filed separately (S2, S8, and S3, respectively). Filing B00580365-S6.
Support of excavation in conjunction w/ construction of a 14-story new building. Foundation, superstructure and underpinning filed separately (S8, S3, and S6, respectively). Filing B00580365-S2.
Filing B00580365-S7 reached an approved status.
Filing B00580365-S4 reached an approved status.
Filing B00580365-S5 reached an approved status.
Filing B00580365-S8 reached an approved status.
Limited foundation work as shown on plans filed herewith in conjunction with NB B00580365. Filing B00580365-Z1.
Filing B00580365-S3 reached an approved status.
Filing B00580365-Z1 reached an approved status.
DOB lists a first permit date for B00580365-Z1. That is not by itself confirmation of activity on site.
Foundation work as show on plans filed herewith. Superstructure, SOE, Underpinning filed separately (S3, S2, S6, respectively). Filing B00580365-P1.
Filing B00580365-P1 reached an approved status.
Filing B00580365-S2 reached an approved status.
Filing B00580365-S6 reached an approved status.
DOB lists a first permit date for B00580365-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00580365-S8. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00580365-S6. That is not by itself confirmation of activity on site.
Plumbing work in conjunction w/construction of 14-story new building. Filing B00580365-P2.
Filing B00580365-P2 reached an approved status.
Mechanical work in conjunction w/construction of 14-story new building. Filing B00580365-P3.
Plumbing work in conjunction w/construction of 14-story new building. Filing B00580365-P4.
The latest status recorded for B00580365-P1 is “Approved.”
The latest status recorded for B00580365-P2 is “Approved.”
Filing B00580365-P4 reached an approved status.
The latest status recorded for B00580365-P4 is “Approved.”
DOB lists a first permit date for B00580365-S5. That is not by itself confirmation of activity on site.
Support of excavation in conjunction w/ construction of a 14-story new building. Foundation, superstructure and underpinning filed separately (S8, S3, and S6, respectively). Filing B00580365-P5.
Filing B00580365-P3 reached an approved status.
The latest status recorded for B00580365-P3 is “Approved.”
Filing B00580365-P5 reached an approved status.
The latest status recorded for B00580365-P5 is “Approved.”
Filing B00580365-I1 reached an approved status.
Plumbing work in conjunction w/construction of 14-story new building. Filing B00580365-P6.
DOB lists a first permit date for B00580365-S7. That is not by itself confirmation of activity on site.
Filing B00580365-P6 reached an approved status.
The latest status recorded for B00580365-P6 is “Approved.”
Installation of temporary standpipe system. Filing B00580365-Z2.
Filing B00580365-Z2 reached an approved status.
DOB lists a first permit date for B00580365-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00580365-Z2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00580365-S3. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00580365-S4. That is not by itself confirmation of activity on site.
Foundation work as show on plans filed herewith. Superstructure, SOE, Underpinning filed separately (S3, S2, S6, respectively). Filing B00580365-P8.
Superstructure in conjunction w/ construction of 14-story new building. Foundation, SOE, Underpinning, filed separately (S8, S2, S6, respectively). Filing B00580365-P9.
AFFORDABLE HOUSING; ACCEPTED INTO HUB DURING CONSULTATION ON 4/7/21. New 14-story mixed use building. Filing B00580365-P7.
Filing B00580365-P9 reached an approved status.
The latest status recorded for B00580365-P9 is “Approved.”
Filing B00580365-P8 reached an approved status.
The latest status recorded for B00580365-P8 is “Approved.”
Plumbing work in conjunction w/construction of 14-story new building. Filing B00580365-A1.
Filing B00580365-A1 reached an approved status.
The latest status recorded for B00580365-A1 is “Approved.”
Wall Bracket as per plans filed herewith. Filing B00580365-Z3.
Loading Platform as per plans filed herewith. Filing B00580365-Z4.
DOB lists a first permit date for B00580365-Z4. That is not by itself confirmation of activity on site.
The latest status recorded for B00580365-Z4 is “Permit Entire.”
Installation of temporary standpipe system. Filing B00580365-A2.
Filing B00580365-A2 reached an approved status.
The latest status recorded for B00580365-A2 is “Approved.”
Filing B00580365-P7 reached an approved status.
The latest status recorded for B00580365-P7 is “Approved.”
DOB lists a first permit date for B00580365-Z3. That is not by itself confirmation of activity on site.
The latest status recorded for B00580365-Z3 is “Permit Entire.”
Curb cut for access to parking garage. Filing B00580365-Z6.
Sprinkler/Standpipe work in conjunction w/construction of 14-story new building. Filing B00580365-A3.
Filing B00580365-Z6 reached an approved status.
The latest status recorded for B00580365-Z6 is “Approved.”
Filing B00580365-A3 reached an approved status.
The latest status recorded for B00580365-A3 is “Approved.”
Plumbing work in conjunction w/construction of 14-story new building. Filing B00580365-A4.
Filing B00580365-A4 reached an approved status.
The latest status recorded for B00580365-A4 is “Approved.”
Plumbing work in conjunction w/construction of 14-story new building. Filing B00580365-A7.
New 14-story mixed use building. Filing B00580365-A6.
Filing B00580365-A7 reached an approved status.
The latest status recorded for B00580365-A7 is “Approved.”
Filing B00580365-A6 reached an approved status.
The latest status recorded for B00580365-A6 is “Approved.”
Mechanical work in conjunction w/construction of 14-story new building. Filing B00580365-A8.
Sprinkler/Standpipe work in conjunction w/construction of 14-story new building. Filing B00580365-A9.
The latest status recorded for B00580365-S4 is “Permit Entire.”
Filing B00580365-A8 reached an approved status.
The latest status recorded for B00580365-A8 is “Approved.”
Filing B00580365-A9 reached an approved status.
The latest status recorded for B00580365-A9 is “Approved.”
Plumbing work in conjunction w/construction of 14-story new building. Filing B00580365-B4.
DOB recorded a sign-off for B00580365-Z1.
The latest status recorded for B00580365-Z1 is “LOC Issued.”
The latest status recorded for B00580365-S5 is “Permit Entire.”
Filing B00580365-B4 reached an approved status.
The latest status recorded for B00580365-B4 is “Approved.”
New 14-story mixed use building. Filing B00580365-B3.
DOB recorded a sign-off for B00580365-S2.
The latest status recorded for B00580365-S2 is “LOC Issued.”
DOB recorded a sign-off for B00580365-S6.
The latest status recorded for B00580365-S6 is “LOC Issued.”
The latest status recorded for B00580365-S3 is “Permit Entire.”
DOB recorded a sign-off for B00580365-S8.
The latest status recorded for B00580365-S8 is “LOC Issued.”
Filing B00580365-B3 reached an approved status.
The latest status recorded for B00580365-B3 is “Approved.”
The latest status recorded for B00580365-Z2 is “Permit Entire.”
The latest status recorded for B00580365-S7 is “Permit Entire.”
New 14-story mixed use building. Filing B00580365-B5.
Filing B00580365-B5 reached an approved status.
The latest status recorded for B00580365-B5 is “Approved.”
The latest status recorded for B00580365-I1 is “Permit Entire.”
Modification of existing sprinklers in new restaurant space. Filing B01429462-I1.
The latest status recorded for B01429462-I1 is “Pending Prof Cert QA Assignment.”
Installation of new plumbing fixtures for a new restaurant. Filing B01429451-I1.
The latest status recorded for B01429451-I1 is “Pending Prof Cert QA Assignment.”
Installation of new kitchen exhaust system and mechanical ac systems in new restaurant space. Filing B01428764-I1.
The latest status recorded for B01428764-I1 is “Pending Prof Cert QA Assignment.”
New store on partial first floor of an existing 14-story building. installation of new ceiling tiles, lighting, and wall finishes. no change in use, egress, or occupancy. Filing B01425425-I1.
The latest status recorded for B01425425-I1 is “Pending Prof Cert QA Assignment.”