DOB filing B00578168-S5
New building at 179 20 Street
Building record · BIN 3429696
179 20 Street, Brooklyn, NY 11232
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 23 independently sourced records, including 18 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3429696
179 20 Street
Sunset Park (West), Brooklyn
A consolidated public-record view · updated Jun 26, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
6 homes at this address are currently listed for sale by Coldwell Banker. Prices move; the brokerage’s own page is the one that is current, and every row here links to it.
| Unit | Rooms | Size | Price | Per sq ft | Listed by |
|---|---|---|---|---|---|
| Unit 10BFor sale | Price not read | Coldwell Banker | |||
| Unit 11AFor sale | Price not read | Coldwell Banker | |||
| Unit 4CFor sale | Price not read | Coldwell Banker | |||
| Unit 5AFor sale | Price not read | Coldwell Banker | |||
| Unit 8BFor sale | Price not read | Coldwell Banker | |||
| Unit 9BFor sale | Price not read | Coldwell Banker |
Read from the brokerages’ own published listings on September 22, 2026. A home drops off this table the next time they publish a list without it — usually because it sold or let, though a listing can also expire or be withdrawn. What we know is that it is no longer offered, which is why this shows what they have today rather than what we were told once. Everything on the market across the city.
Violation record
No open violations are recorded for this building.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429696. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 19 new building, 4 alteration filing. Its latest status categories are 18 approved, 5 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 179 20 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 23 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Install plywood construction fence in conjunction # 321957735. Filing B00565084-I1.
DOB lists a first permit date for B00565084-I1. That is not by itself confirmation of activity on site.
Construct new Eleven (11) story mixed use building as per plans filed herewith. Filing B00578168-I1.
Plumbing work per plans filed herewith. Filing B00578168-S5.
Install combined sprinkler/standpipe system as per plans filed herewith. filed in conjunction with nb# b00578168-i1. Filing B00601682-I1.
Provide support of excavation including Drilling of soldier piles, installation of timber lagging. Installation of external steel bracing (rakers and cross bracing) along perimeter of site. Installation of underpinning with external steel bracing. Filing B00578168-S2.
Filing B00578168-S5 reached an approved status.
Filing B00601682-I1 reached an approved status.
Structural work per plans filed herewith. Filing B00578168-S3.
Install foundation as per plans filed herewith. Filing B00578168-S6.
Mechanical work per plans filed herewith. Filing B00578168-S4.
Filing B00578168-S4 reached an approved status.
Filing B00578168-S6 reached an approved status.
Filing B00578168-S3 reached an approved status.
Filing B00578168-S2 reached an approved status.
DOB recorded a sign-off for B00565084-I1.
DOB lists a first permit date for B00578168-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00578168-S6. That is not by itself confirmation of activity on site.
Filing B00578168-I1 reached an approved status.
Construct new nine (9) story mixed use building as per plans filed herewith. Filing B00578168-P1.
Filing B00578168-P1 reached an approved status.
DOB lists a first permit date for B00578168-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00578168-S5. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00578168-S4. That is not by itself confirmation of activity on site.
Construct new Eleven (11) story mixed use building as per plans filed herewith. Filing B00578168-P2.
DOB lists a first permit date for B00578168-S3. That is not by itself confirmation of activity on site.
Install foundation as per plans filed herewith. Filing B00578168-P3.
Structural work per plans filed herewith. Filing B00578168-P4.
DOB lists a first permit date for B00601682-I1. That is not by itself confirmation of activity on site.
Filing B00578168-P4 reached an approved status.
Structural work per plans filed herewith. Filing B00578168-P5.
Filing B00578168-P5 reached an approved status.
Mechanical work per plans filed herewith. Filing B00578168-P6.
Filing B00578168-P6 reached an approved status.
Plumbing work per plans filed herewith. Filing B00578168-P7.
Filing B00578168-P2 reached an approved status.
Construct new Eleven (11) story mixed use building as per plans filed herewith. Filing B00578168-P9.
Filing B00578168-P7 reached an approved status.
Filing B00578168-P9 reached an approved status.
The latest status recorded for B00565084-I1 is “LOC Issued.”
The latest status recorded for B00578168-P1 is “Approved.”
The latest status recorded for B00578168-P2 is “Approved.”
The latest status recorded for B00578168-P4 is “Approved.”
The latest status recorded for B00578168-P5 is “Approved.”
The latest status recorded for B00578168-P6 is “Approved.”
The latest status recorded for B00578168-P7 is “Approved.”
The latest status recorded for B00578168-P9 is “Approved.”
Filing B00578168-P3 reached an approved status.
The latest status recorded for B00578168-P3 is “Approved.”
Plumbing work per plans filed herewith. Filing B00578168-A1.
Install combined sprinkler/standpipe system as per plans filed herewith. filed in conjunction with nb# b00578168-i1. Filing B00601682-P1.
Filing B00578168-A1 reached an approved status.
The latest status recorded for B00578168-A1 is “Approved.”
Filing B00601682-P1 reached an approved status.
The latest status recorded for B00601682-P1 is “Approved.”
Construct new Eleven (11) story mixed use building as per plans filed herewith. Filing B00578168-A4.
Filing B00578168-A4 reached an approved status.
The latest status recorded for B00578168-A4 is “Approved.”
Mechanical work per plans filed herewith. Filing B00578168-P8.
Filing B00578168-P8 reached an approved status.
The latest status recorded for B00578168-P8 is “Approved.”
Construct new Eleven (11) story mixed use building as per plans filed herewith. Filing B00578168-A5.
Install combined sprinkler/standpipe system as per plans filed herewith. filed in conjunction with nb# b00578168-i1. Filing B00601682-P2.
DOB recorded a sign-off for B00578168-S2.
The latest status recorded for B00578168-S2 is “LOC Issued.”
Filing B00601682-P2 reached an approved status.
The latest status recorded for B00601682-P2 is “Approved.”
Filing B00578168-A5 reached an approved status.
The latest status recorded for B00578168-A5 is “Approved.”
Plumbing work per plans filed herewith. Filing B00578168-A6.
Filing B00578168-A6 reached an approved status.
The latest status recorded for B00578168-A6 is “Approved.”
The latest status recorded for B00578168-I1 is “Permit Entire.”
DOB recorded a sign-off for B00578168-S3.
The latest status recorded for B00578168-S3 is “LOC Issued.”
The latest status recorded for B00601682-I1 is “Permit Entire.”
DOB recorded a sign-off for B00578168-S4.
The latest status recorded for B00578168-S4 is “LOC Issued.”
DOB recorded a sign-off for B00578168-S6.
The latest status recorded for B00578168-S6 is “LOC Issued.”
The latest status recorded for B00578168-S5 is “Permit Entire.”