DOB filing B00560232-A1
New building at 380 Chester Street
Building record · BIN 3429750
380 Chester Street, Brooklyn, NY 11212
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 20 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3429750
380 Chester Street
Brownsville, Brooklyn
A consolidated public-record view · updated Sep 18, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
Owner of record
HP MARCUS GARVEY PRESERVATION HOUSING CO MPANY, INC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Violation record
No open violations are recorded for this building.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429750. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 19 new building, 1 alteration filing. Its latest status categories are 1 under review, 11 approved, 8 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 380 Chester Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 20 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of plywood fence during new building construction, filed separately. plywood fence shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application. Filing B00295637-I1.
DOB lists a first permit date for B00295637-I1. That is not by itself confirmation of activity on site.
A New 8 story building. Filing B00560232-I1.
Sprinkler/standpipe work related to new building as shown as plans filed herewith. Filing B00560232-S6.
Plumbing work related to new building as shown on plans filed herewith. Filing B00560232-S5.
Mechanical work for new building as shown on plans filed herewith. Filing B00560232-S4.
Foundation and earthwork in conjunction with NB B00560232-I1 as shown on plans. Filing B00560232-S1.
Structural work in conjunction with NB #B00560232-I1 as shown on plans. Filing B00560232-S2.
Installation of temporary standpipe in conjunction with New Building. Filing B00560232-S7.
Filing B00560232-S6 reached an approved status.
Filing B00560232-S5 reached an approved status.
Filing B00560232-S7 reached an approved status.
Support of Excavation (H-Pile lagging system and berming/sloping) in conjunction with NB # B00560232. Filing B00560232-S3.
Filing B00560232-S3 reached an approved status.
Filing B00560232-S2 reached an approved status.
Filing B00560232-S4 reached an approved status.
Support of Excavation (H-Pile lagging system and berming/sloping) in conjunction with NB # B00560232. Filing B00560232-P1.
Filing B00560232-I1 reached an approved status.
Filing B00560232-P1 reached an approved status.
The latest status recorded for B00560232-P1 is “Approved.”
Drilling and horizontal/vertical piping installation for Geothermal. Filing B00560232-S8.
Filing B00560232-S8 reached an approved status.
DOB lists a first permit date for B00560232-S8. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00560232-S3. That is not by itself confirmation of activity on site.
Filing B00560232-S1 reached an approved status.
DOB lists a first permit date for B00560232-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00560232-S7. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00560232-S6. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00560232-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00560232-S5. That is not by itself confirmation of activity on site.
Plumbing work related to new building as shown on plans filed herewith. Filing B00560232-P2.
Filing B00560232-P2 reached an approved status.
The latest status recorded for B00560232-P2 is “Approved.”
DOB lists a first permit date for B00560232-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00560232-S4. That is not by itself confirmation of activity on site.
Multipoint Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy. Filing B00560232-Z1.
DOB lists a first permit date for B00560232-Z1. That is not by itself confirmation of activity on site.
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy. Filing B00560232-Z2.
DOB lists a first permit date for B00560232-Z2. That is not by itself confirmation of activity on site.
The latest status recorded for B00560232-S8 is “Permit Entire.”
The latest status recorded for B00560232-Z1 is “Permit Entire.”
A New 8 story building. Filing B00560232-P5.
DOB recorded a sign-off for B00560232-S3.
The latest status recorded for B00560232-S3 is “LOC Issued.”
Mechanical work for new building as shown on plans filed herewith. Filing B00560232-P3.
Plumbing work related to new building as shown on plans filed herewith. Filing B00560232-P6.
Filing B00560232-P3 reached an approved status.
The latest status recorded for B00560232-P3 is “Approved.”
Sprinkler/standpipe work related to new building as shown as plans filed herewith. Filing B00560232-P7.
DOB recorded a sign-off for B00560232-S2.
The latest status recorded for B00560232-S2 is “LOC Issued.”
DOB recorded a sign-off for B00560232-S1.
The latest status recorded for B00560232-S1 is “LOC Issued.”
Filing B00560232-P5 reached an approved status.
The latest status recorded for B00560232-P5 is “Approved.”
The latest status recorded for B00560232-Z2 is “Permit Entire.”
DOB recorded a sign-off for B00560232-S4.
The latest status recorded for B00560232-S4 is “LOC Issued.”
Filing B00560232-P7 reached an approved status.
The latest status recorded for B00560232-P7 is “Approved.”
DOB recorded a sign-off for B00295637-I1.
The latest status recorded for B00295637-I1 is “LOC Issued.”
Filing B00560232-P6 reached an approved status.
The latest status recorded for B00560232-P6 is “Approved.”
DOB recorded a sign-off for B00560232-S7.
The latest status recorded for B00560232-S7 is “LOC Issued.”
DOB recorded a sign-off for B00560232-S5.
The latest status recorded for B00560232-S5 is “LOC Issued.”
A New 8 story building. Filing B00560232-P9.
DOB recorded a sign-off for B00560232-S6.
The latest status recorded for B00560232-S6 is “LOC Issued.”
Filing B00560232-P9 reached an approved status.
The latest status recorded for B00560232-P9 is “Approved.”
The latest status recorded for B00560232-I1 is “Permit Entire.”
A New 8 story building. Filing B00560232-A1.
The latest status recorded for B00560232-A1 is “Plan Examiner Review.”