DOB filing B01377465-I1
Alteration filing at 240 3 Avenue
Building record · BIN 3429819
240 3 Avenue, Brooklyn, NY 11217
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 24 independently sourced records, including 14 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3429819
240 3 Avenue
Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn
A consolidated public-record view · updated Oct 8, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 9-story elevator apartment building built in 2023, with 214 homes, on a 33,550 sq ft lot.
Owner of record
UNION RESIDENCE LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 2 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429819. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 2 alteration filing, 22 new building. Its latest status categories are 14 approved, 10 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 240 3 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 24 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Application to be assigned to HUB per Consultation meeting with SPV on 9/28/2021, 25% inclusionary housing. Application filed in order to erect 9 story mixed use new building. Filing B00621076-I1.
Structural work as shown on plans filed herewith, as subsequent to NB application # B00621076-I1. Filing B00621076-S3.
Foundation work in conjunction with NB application # B00621076-I1. Filing B00621076-S1.
Filing B00621076-S3 reached an approved status.
Plumbing work as shown on plans in conjunction with NB # B00621076-I1. Filing B00621076-S5.
Temporary standpipe work as shown on plans in conjunction with NB # B00621076-I1. Filing B00621076-S7.
Filing B00621076-S7 reached an approved status.
Limited foundation work as shown on plans in conjunction with initial filing. Filing B00621076-S8.
Filing B00621076-S8 reached an approved status.
Limited foundation work as shown on plans in conjunction with initial filing. Filing B00621076-P1.
Filing B00621076-P1 reached an approved status.
The latest status recorded for B00621076-P1 is “Approved.”
DOB lists a first permit date for B00621076-S8. That is not by itself confirmation of activity on site.
SOE work in conjunction with NB # B00621076-I1. Filing B00621076-S2.
Sprinkler and standpipe systems in conjunction with new building. Filing B00621076-S6.
Structural work as shown on plans filed herewith, as subsequent to NB application # B00621076-I1. Filing B00621076-P3.
Filing B00621076-S6 reached an approved status.
Filing B00621076-P3 reached an approved status.
The latest status recorded for B00621076-P3 is “Approved.”
Filing B00621076-S2 reached an approved status.
DOB lists a first permit date for B00621076-S2. That is not by itself confirmation of activity on site.
Filing B00621076-S1 reached an approved status.
Temporary standpipe work as shown on plans in conjunction with NB # B00621076-I1. Filing B00621076-P2.
DOB lists a first permit date for B00621076-S1. That is not by itself confirmation of activity on site.
Filing B00621076-P2 reached an approved status.
The latest status recorded for B00621076-P2 is “Approved.”
Filing B00621076-S5 reached an approved status.
DOB lists a first permit date for B00621076-S5. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621076-S7. That is not by itself confirmation of activity on site.
SOE work in conjunction with NB # B00621076-I1. Filing B00621076-P4.
Filing B00621076-P4 reached an approved status.
The latest status recorded for B00621076-P4 is “Approved.”
Filing B00621076-I1 reached an approved status.
DOB lists a first permit date for B00621076-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621076-S3. That is not by itself confirmation of activity on site.
Application to be assigned to HUB per Consultation meeting with SPV on 9/28/2021, 25% inclusionary housing. Application filed in order to erect 9 story mixed use new building. Filing B00621076-P5.
Mechanical work as shown on plans in conjunction with NB # B00621076-I1. Filing B00621076-S4.
Filing B00621076-S4 reached an approved status.
Curb cut work as shown on plans in conjunction with NB # B00621076-I1. Filing B00621076-Z1.
Filing B00621076-Z1 reached an approved status.
DOB lists a first permit date for B00621076-S4. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621076-S6. That is not by itself confirmation of activity on site.
Filing B00621076-P5 reached an approved status.
The latest status recorded for B00621076-P5 is “Approved.”
Plumbing work as shown on plans in conjunction with NB # B00621076-I1. Filing B00621076-P8.
Application to be assigned to HUB per Consultation meeting with SPV on 9/28/2021, 25% inclusionary housing. Application filed in order to erect 9 story mixed use new building. Filing B00621076-P9.
Filing B00621076-P8 reached an approved status.
The latest status recorded for B00621076-P8 is “Approved.”
Filing B00621076-P9 reached an approved status.
The latest status recorded for B00621076-P9 is “Approved.”
Sprinkler and standpipe systems in conjunction with new building. Filing B00621076-A1.
Limited foundation work as shown on plans in conjunction with initial filing. Filing B00621076-A2.
Filing B00621076-A2 reached an approved status.
The latest status recorded for B00621076-A2 is “Approved.”
Filing B00621076-A1 reached an approved status.
The latest status recorded for B00621076-A1 is “Approved.”
DOB lists a first permit date for B00621076-Z1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00621076-S8.
The latest status recorded for B00621076-S8 is “LOC Issued.”
DOB recorded a sign-off for B00621076-S1.
The latest status recorded for B00621076-S1 is “LOC Issued.”
DOB recorded a sign-off for B00621076-S3.
The latest status recorded for B00621076-S3 is “LOC Issued.”
DOB recorded a sign-off for B00621076-S5.
The latest status recorded for B00621076-S5 is “LOC Issued.”
DOB recorded a sign-off for B00621076-S7.
The latest status recorded for B00621076-S7 is “LOC Issued.”
DOB recorded a sign-off for B00621076-Z1.
The latest status recorded for B00621076-Z1 is “LOC Issued.”
DOB recorded a sign-off for B00621076-S6.
The latest status recorded for B00621076-S6 is “LOC Issued.”
Application to be assigned to HUB per Consultation meeting with SPV on 9/28/2021, 25% inclusionary housing. Application filed in order to erect 9 story mixed use new building. Filing B00621076-A5.
Filing B00621076-A5 reached an approved status.
The latest status recorded for B00621076-A5 is “Approved.”
Application to be assigned to HUB per Consultation meeting with SPV on 9/28/2021, 25% inclusionary housing. Application filed in order to erect 9 story mixed use new building. Filing B00621076-A7.
Filing B00621076-A7 reached an approved status.
The latest status recorded for B00621076-A7 is “Approved.”
DOB recorded a sign-off for B00621076-S2.
The latest status recorded for B00621076-S2 is “LOC Issued.”
Mechanical work as shown on plans in conjunction with NB # B00621076-I1. Filing B00621076-A6.
Filing B00621076-A6 reached an approved status.
The latest status recorded for B00621076-A6 is “Approved.”
DOB recorded a sign-off for B00621076-S4.
The latest status recorded for B00621076-S4 is “LOC Issued.”
DOB recorded a sign-off for B00621076-I1.
The latest status recorded for B00621076-I1 is “CO Issued.”
1st floor interior renovation. no change in use, occupancy, or egress under this application. Filing B01373219-I1.
Filing B01373219-I1 reached an approved status.
Filing to install first floor Cafe store kitchen hood, make up air and ductwork as per plans. No change in use, egress or occupancy. Filing B01377465-I1.
Filing B01377465-I1 reached an approved status.
DOB lists a first permit date for B01373219-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01373219-I1 is “Permit Entire.”
DOB lists a first permit date for B01377465-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01377465-I1 is “Permit Entire.”