DOB filing B01446205-I1
Alteration filing at 1045 Flatbush Avenue
Building record · BIN 3429863
1045 Flatbush Avenue, Brooklyn, NY 11226
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 23 independently sourced records, including 22 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3429863
1045 Flatbush Avenue
Flatbush, Brooklyn
A consolidated public-record view · updated Aug 31, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 7-story office building built in 2025, on a 12,753 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 6 open notices on record for this building, out of 35 notices on file; the most recent was issued Mar 20, 2024.
Issued Mar 20, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429863. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 23 alteration filing. Its latest status categories are 22 approved, 1 closed or withdrawn. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1045 Flatbush Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 23 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
This job is filed for construction fence for demolition work at 1041 flatbush avenue/job #321995249. Filing B00315316-I1.
DOB lists a first permit date for B00315316-I1. That is not by itself confirmation of activity on site.
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. Filing B00436791-I1.
DOB lists a first permit date for B00436791-I1. That is not by itself confirmation of activity on site.
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application. Filing B00436813-I1.
DOB lists a first permit date for B00436813-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00436791-I1 is “Permit Entire.”
The latest status recorded for B00436813-I1 is “Permit Entire.”
Herewith filing for the installation of new HVAC system and emergency generator. Filing B00471717-I1.
Herewith filing for new installation of plumbing, sprinkler and standpipe systems. Filing B00484251-I1.
Filing B00484251-I1 reached an approved status.
Filing B00471717-I1 reached an approved status.
Herewith filing for new installation of fuel storage tanks and associated fuel piping. Filing B00484287-I1.
Filing B00484287-I1 reached an approved status.
This job is filed for partial demolition operation to remove the hanging concrete roof slab. Filing B00608717-I1.
Filing B00608717-I1 reached an approved status.
Foundation work for a 7-story mixed-use new building. Filing B00560402-I1.
Install 8' high, 228' long of construction fence in conjunction with NB 340795483. Filing B00559632-I1.
Filing B00559632-I1 reached an approved status.
Proposed Structural for a Nine Stories Building + Cellar + Sub-Cellar. Amend plans based on architectural change. Filing B00560425-I1.
Herewith filing for new installation of temporary standpipe systems. Filing B00622800-I1.
Filing B00560402-I1 reached an approved status.
Filing B00560425-I1 reached an approved status.
Filing B00622800-I1 reached an approved status.
Proposed excavation for a nine stories building. Amend plans based on architectural change. Filing B00560352-I1.
DOB lists a first permit date for B00608717-I1. That is not by itself confirmation of activity on site.
Filing B00560352-I1 reached an approved status.
The latest status recorded for B00608717-I1 is “Permit Entire.”
Proposed Structural for a Nine Stories Building + Cellar + Sub-Cellar. Amend plans based on architectural change. Filing B00560425-P1.
Proposed Foundation for a Nine Stories Building + Cellar + Sub-Cellar. Amend plans based on architectural change. Filing B00560402-P1.
Filing B00560402-P1 reached an approved status.
The latest status recorded for B00560402-P1 is “Approved.”
Filing B00560425-P1 reached an approved status.
The latest status recorded for B00560425-P1 is “Approved.”
Proposed excavation for a nine stories building. Amend plans based on architectural change. Filing B00560352-P1.
Filing B00560352-P1 reached an approved status.
The latest status recorded for B00560352-P1 is “Approved.”
The latest status recorded for B00315316-I1 is “Permit Entire.”
DOB lists a first permit date for B00559632-I1. That is not by itself confirmation of activity on site.
Herewith filing for new installation of plumbing, sprinkler and standpipe systems. Filing B00484251-P1.
The latest status recorded for B00484251-I1 is “Approved.”
Filing B00484251-P1 reached an approved status.
The latest status recorded for B00484251-P1 is “Approved.”
DOB lists a first permit date for B00622800-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00622800-I1 is “Permit Entire.”
Proposed Foundation for a Nine Stories Building + Cellar + Sub-Cellar. Amend plans based on architectural change. Filing B00560402-P2.
Proposed Structural for a Nine Stories Building + Cellar + Sub-Cellar. Amend plans based on architectural change. Filing B00560425-P2.
Filing B00560402-P2 reached an approved status.
The latest status recorded for B00560402-P2 is “Approved.”
Filing B00560425-P2 reached an approved status.
The latest status recorded for B00560425-P2 is “Approved.”
Proposed Structural for a Nine Stories Building + Cellar + Sub-Cellar. Amend plans based on architectural change. Filing B00560425-P3.
Filing B00560425-P3 reached an approved status.
The latest status recorded for B00560425-P3 is “Approved.”
Proposed excavation for a nine stories building. Amend plans based on architectural change. Filing B00560352-P2.
The latest status recorded for B00560352-I1 is “Approved.”
Filing B00560352-P2 reached an approved status.
The latest status recorded for B00560352-P2 is “Approved.”
Herewith filing for the installation of new HVAC system and emergency generator. Filing B00471717-P1.
The latest status recorded for B00484287-I1 is “Filing Withdrawn.”
The latest status recorded for B00471717-I1 is “Approved.”
Filing B00471717-P1 reached an approved status.
The latest status recorded for B00471717-P1 is “Approved.”
The latest status recorded for B00559632-I1 is “Permit Entire.”
Foundation work for a 7-story mixed-use new building. Filing B00560402-P3.
DOB lists a first permit date for B00560425-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00560425-I1 is “Permit Entire.”
Filing B00560402-P3 reached an approved status.
The latest status recorded for B00560402-P3 is “Approved.”
DOB lists a first permit date for B00560402-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00560402-I1 is “Permit Entire.”
Equipment use: single 6000 # capacity personnel hoist during nb const, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing B01446205-I1.
Filing B01446205-I1 reached an approved status.
DOB lists a first permit date for B01446205-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01446205-I1 is “Permit Entire.”