DOB filing B00608389-C3
New building at 11 Wharf Way
Building record · BIN 3429924
11 Wharf Way, Brooklyn, NY 11249
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 24 independently sourced records, including 22 that are not recorded as completed, closed or withdrawn.
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 22-story condominium built in 2023, with 487 homes, on a 98,354 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not any single filing.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429924. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 20 new building, 4 alteration filing. Its latest status categories are 22 approved, 2 closed or withdrawn. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 11 Wharf Way.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 24 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Removal of entire sprinkler system on the basement, 1st, 2nd, and 3rd floors prior to full building demolition (separate DOB application). building is vacant. no structural elements, or fire rated shafts, stairways, or corridors to be removed or damaged. Filing B00352958-I1.
Filing B00352958-I1 reached an approved status.
DOB lists a first permit date for B00352958-I1. That is not by itself confirmation of activity on site.
Herewith filing 22 story new building. Filing B00608389-I1.
Herewith filing associated foundation in conjunction with 16 story new building. 11/8/2023-paa to indicate revised plans as per ai 1 narrative of changes. Filing B00608389-S6.
Herewith filing associated structural work in conjunction with 22 story new building. Filing B00608389-S2.
Herewith filing associated plumbing work in conjunction with 16 story new building. Filing B00608389-S5.
Herewith filing associated mechanical work in conjunction with 16 story new building. Filing B00608389-S4.
Sprinkler/standpipe work in conjunction with 22 story new building. Filing B00623628-I1.
Filing B00623628-I1 reached an approved status.
Filing B00608389-S6 reached an approved status.
DOB lists a first permit date for B00608389-S6. That is not by itself confirmation of activity on site.
Filing B00608389-S4 reached an approved status.
Filing B00608389-S5 reached an approved status.
Filing B00608389-I1 reached an approved status.
DOB lists a first permit date for B00608389-I1. That is not by itself confirmation of activity on site.
Filing B00608389-S2 reached an approved status.
DOB lists a first permit date for B00608389-S5. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00623628-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00608389-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00608389-S4. That is not by itself confirmation of activity on site.
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy. Filing B00608389-Z3.
DOB lists a first permit date for B00608389-Z3. That is not by itself confirmation of activity on site.
The latest status recorded for B00608389-Z3 is “Permit Entire.”
Herewith filing associated mechanical work in conjunction with 16 story new building. Filing B00608389-A5.
Filing B00608389-A5 reached an approved status.
The latest status recorded for B00608389-A5 is “Approved.”
Sprinkler/standpipe work in conjunction with 22 story new building. Filing B00623628-P3.
Filing B00623628-P3 reached an approved status.
The latest status recorded for B00623628-P3 is “Approved.”
The latest status recorded for B00608389-A6 is “Filing Withdrawn.”
Herewith filing associated mechanical work in conjunction with 16 story new building. Filing B00608389-A7.
Filing B00608389-A7 reached an approved status.
The latest status recorded for B00608389-A7 is “Approved.”
The latest status recorded for B00608389-S2 is “Permit Entire.”
The latest status recorded for B00608389-S6 is “Permit Entire.”
Herewith filing 22 story new building. Filing B00608389-A9.
Filing B00608389-A9 reached an approved status.
The latest status recorded for B00608389-A9 is “Approved.”
Herewith filing 22 story new building. Filing B00608389-B1.
Filing B00608389-B1 reached an approved status.
The latest status recorded for B00608389-B1 is “Approved.”
Herewith filing 22 story new building. Filing B00608389-B2.
Filing B00608389-B2 reached an approved status.
The latest status recorded for B00608389-B2 is “Approved.”
The latest status recorded for B00352958-I1 is “Filing Withdrawn.”
Herewith filing associated plumbing work in conjunction with 16 story new building. Filing B00608389-B3.
Filing B00608389-B3 reached an approved status.
The latest status recorded for B00608389-B3 is “Approved.”
Herewith filing associated plumbing work in conjunction with 16 story new building. Filing B00608389-B4.
Filing B00608389-B4 reached an approved status.
The latest status recorded for B00608389-B4 is “Approved.”
Herewith filing 22 story new building. Filing B00608389-B6.
Herewith filing associated mechanical work in conjunction with 16 story new building. Filing B00608389-B8.
Herewith filing associated plumbing work in conjunction with 16 story new building. Filing B00608389-B7.
Sprinkler/standpipe work in conjunction with 22 story new building. Filing B00623628-P4.
The latest status recorded for B00608389-S5 is “Permit Entire.”
Filing B00608389-B7 reached an approved status.
The latest status recorded for B00608389-B7 is “Approved.”
The latest status recorded for B00623628-I1 is “Permit Entire.”
Filing B00623628-P4 reached an approved status.
The latest status recorded for B00623628-P4 is “Approved.”
The latest status recorded for B00608389-S4 is “Permit Entire.”
Filing B00608389-B8 reached an approved status.
The latest status recorded for B00608389-B8 is “Approved.”
Filing B00608389-B6 reached an approved status.
The latest status recorded for B00608389-B6 is “Approved.”
Herewith filing 22 story new building. Filing B00608389-C1.
Filing B00608389-C1 reached an approved status.
The latest status recorded for B00608389-C1 is “Approved.”
Herewith filing 22 story new building. Filing B00608389-C2.
Filing B00608389-C2 reached an approved status.
The latest status recorded for B00608389-C2 is “Approved.”
Herewith filing 22 story new building. Filing B00608389-C3.
Filing B00608389-C3 reached an approved status.
The latest status recorded for B00608389-C3 is “Approved.”
The latest status recorded for B00608389-I1 is “Permit Entire.”