DOB filing B00621533-A9
New building at 130 2 Street
Building record · BIN 3429971
130 2 Street, Brooklyn, NY 11231
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 33 independently sourced records, including 14 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3429971
130 2 Street
Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn
A consolidated public-record view · updated Sep 10, 2025
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 14-story condominium built in 2024, with 3 homes, on a 20,377 sq ft lot.
What it sold for
4 apartments on this tax block changed hands in the year the city last published, at a median of $105,000,000, from 105,000,000 to 105,000,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
STUDIO 389 LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429971. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 33 new building. Its latest status categories are 14 approved, 10 closed or withdrawn, 9 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 130 2 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 33 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
New 14-story building. Filing B00621533-I1.
New 8-story building. Filing B00623789-I1.
Structural work in conjunction with NB # B00621533. Filing B00621533-S2.
Foundation work in conjunction with NB # B00621533. Filing B00621533-S1.
Foundation work in conjunction with NB # B00623789. Filing B00623789-S1.
Structural work in conjunction with NB # B00623789. Filing B00623789-S2.
Mechanical work in conjunction with new building. Filing B00621533-S4.
Mechanical work in conjunction with New Building. Filing B00623789-S4.
Plumbing work in conjunction with new building. Filing B00623789-S5.
Installation of underground piping in conjunction with new building. Filing B00621533-Z1.
Support of Excavation in conjunction with New Building. Filing B00621533-S3.
Filing B00621533-S4 reached an approved status.
Filing B00621533-Z1 reached an approved status.
Limited Early Foundation in Conjunction with New Building. Filing B00623789-S9.
Limited Early Foundation in Conjunction with New Building. Filing B00621533-Z2.
Filing B00623789-S9 reached an approved status.
Filing B00621533-Z2 reached an approved status.
DOB lists a first permit date for B00623789-S9. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621533-Z2. That is not by itself confirmation of activity on site.
Sprinkler/Standpipe work as shown on plans filed herewith. Filing B00621533-S8.
Temp Standpipe. Filing B00621533-S9.
Mechanical work in conjunction with NB # B00621533. Filing B00621533-Z4.
Installation of underground piping as shown on plans filed herewith. In conjunction with New Building B00621533-I1. Filing B00621533-Z5.
Filing B00621533-S9 reached an approved status.
Structural work in conjunction with NB # B00621533. Filing B00621533-P2.
Filing B00621533-P2 reached an approved status.
Plumbing work in conjunction with new building. Filing B00621533-S7.
Filing B00621533-S7 reached an approved status.
Filing B00621533-S1 reached an approved status.
Support of excavation to include sloping/grading, bracing, and timber posts and lagging filed in conjunction with NB # B00621533. Filing B00621533-Z6.
Foundation work in conjunction with NB # B00621533. Filing B00621533-P3.
Filing B00621533-Z5 reached an approved status.
The latest status recorded for B00621533-P2 is “Approved.”
Filing B00621533-I1 reached an approved status.
Filing B00621533-Z6 reached an approved status.
Filing B00621533-P3 reached an approved status.
The latest status recorded for B00621533-P3 is “Approved.”
DOB lists a first permit date for B00621533-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621533-Z6. That is not by itself confirmation of activity on site.
Filing B00621533-S8 reached an approved status.
DOB lists a first permit date for B00621533-S7. That is not by itself confirmation of activity on site.
Filing B00621533-Z4 reached an approved status.
DOB lists a first permit date for B00621533-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621533-Z4. That is not by itself confirmation of activity on site.
Installation of Sub-Membrane Depressurization system in conjunction with NB # B00621533. Filing B00621533-Z7.
Filing B00621533-Z7 reached an approved status.
DOB lists a first permit date for B00621533-Z7. That is not by itself confirmation of activity on site.
Filing B00621533-S2 reached an approved status.
DOB lists a first permit date for B00621533-S2. That is not by itself confirmation of activity on site.
Structural work in conjunction with NB # B00621533. Filing B00621533-P5.
Foundation work in conjunction with NB # B00621533. Filing B00621533-P4.
DOB lists a first permit date for B00621533-S9. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621533-S8. That is not by itself confirmation of activity on site.
Filing B00621533-P4 reached an approved status.
The latest status recorded for B00621533-P4 is “Approved.”
Mechanical work in conjunction with NB # B00621533. Filing B00621533-P7.
New 14-story building. Filing B00621533-P6.
Filing B00621533-P5 reached an approved status.
The latest status recorded for B00621533-P5 is “Approved.”
Filing B00621533-P6 reached an approved status.
The latest status recorded for B00621533-P6 is “Approved.”
New 14-story building. Filing B00621533-A1.
Filing B00621533-A1 reached an approved status.
The latest status recorded for B00621533-A1 is “Approved.”
DOB recorded a sign-off for B00621533-Z6.
The latest status recorded for B00621533-Z6 is “LOC Issued.”
Foundation work in conjunction with NB # B00621533. Filing B00621533-A3.
Structural work in conjunction with NB # B00621533. Filing B00621533-A2.
Filing B00621533-A2 reached an approved status.
The latest status recorded for B00621533-A2 is “Approved.”
New 14-story building. Filing B00621533-A4.
The latest status recorded for B00621533-S4 is “Filing Withdrawn.”
The latest status recorded for B00623789-S2 is “Filing Withdrawn.”
The latest status recorded for B00623789-S4 is “Filing Withdrawn.”
The latest status recorded for B00623789-S5 is “Filing Withdrawn.”
Filing B00621533-A3 reached an approved status.
The latest status recorded for B00621533-A3 is “Approved.”
The latest status recorded for B00621533-S3 is “Filing Withdrawn.”
The latest status recorded for B00623789-S1 is “Filing Withdrawn.”
Filing B00621533-A4 reached an approved status.
The latest status recorded for B00621533-A4 is “Approved.”
Sprinkler/Standpipe work as shown on plans filed herewith. Filing B00621533-A6.
DOB recorded a sign-off for B00621533-S1.
The latest status recorded for B00621533-S1 is “LOC Issued.”
DOB recorded a sign-off for B00621533-S2.
The latest status recorded for B00621533-S2 is “LOC Issued.”
DOB recorded a sign-off for B00621533-Z7.
The latest status recorded for B00621533-Z7 is “LOC Issued.”
Filing B00621533-A6 reached an approved status.
The latest status recorded for B00621533-A6 is “Approved.”
Filing B00621533-P7 reached an approved status.
The latest status recorded for B00621533-P7 is “Approved.”
Plumbing work in conjunction with new building. Filing B00621533-A7.
Filing B00621533-A7 reached an approved status.
The latest status recorded for B00621533-A7 is “Approved.”
The latest status recorded for B00621533-Z5 is “Filing Withdrawn.”
DOB recorded a sign-off for B00621533-Z2.
The latest status recorded for B00621533-Z2 is “LOC Issued.”
DOB recorded a sign-off for B00621533-Z4.
DOB recorded a sign-off for B00621533-S7.
The latest status recorded for B00621533-S7 is “LOC Issued.”
The latest status recorded for B00621533-Z4 is “LOC Issued.”
DOB recorded a sign-off for B00621533-S8.
The latest status recorded for B00621533-S8 is “LOC Issued.”
DOB recorded a sign-off for B00621533-S9.
The latest status recorded for B00621533-S9 is “LOC Issued.”
The latest status recorded for B00621533-Z1 is “Filing Withdrawn.”
The latest status recorded for B00623789-I1 is “Filing Withdrawn.”
The latest status recorded for B00623789-S9 is “Filing Withdrawn.”
New 14-story building. Filing B00621533-A9.
Filing B00621533-A9 reached an approved status.
The latest status recorded for B00621533-A9 is “Approved.”
The latest status recorded for B00621533-I1 is “Permit Entire.”