DOB filing B00621504-S2
New building at 200 Douglass Street
Building record · BIN 3429982
200 Douglass Street, Brooklyn, NY 11217
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 15 independently sourced records, including 15 that are not recorded as completed, closed or withdrawn.
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 22-story elevator apartment building built in 2025, with 274 homes, on a 51,439 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not any single filing.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3429982. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 15 new building. Its latest status categories are 13 approved, 2 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 200 Douglass Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 15 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Construction of 22 story mixed-use new building. Filing B00621504-I1.
Superstructure work filed in conjunction with NB B00621504. Filing B00621504-S2.
Mechanical Scope filed in conjunction with NB application B00621504. Filing B00621504-S3.
Foundation scope filed in conjunction with NB application B0061504. Filing B00621504-S1.
Plumbing scope filed in conjunction with NB B00621504. Filing B00621504-S4.
Installation of sprinkler/standpipe system in conjunction with construction of 22-story new building. Filing B00621504-S5.
Pressurized alarm system (temporary standpipe) in conjunction with construction of 22-story new building. Filing B00621504-S9.
Filing B00621504-S9 reached an approved status.
Filing B00621504-S5 reached an approved status.
Filing B00621504-S4 reached an approved status.
TEST PILES in conjunction with construction of New Building. Complete building foundation filed separately under B00621504-S1. Filing B00621504-Z2.
Filing B00621504-Z2 reached an approved status.
Filing B00621504-S3 reached an approved status.
Filing B00621504-S1 reached an approved status.
Filing B00621504-S2 reached an approved status.
Filing B00621504-I1 reached an approved status.
DOB lists a first permit date for B00621504-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621504-Z2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621504-S5. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621504-S9. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621504-S4. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621504-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00621504-I1 is “Permit Entire.”
Plumbing scope filed in conjunction with NB B00621504. Filing B00621504-P4.
The latest status recorded for B00621504-S4 is “Permit Entire.”
Filing B00621504-P4 reached an approved status.
The latest status recorded for B00621504-P4 is “Approved.”
The latest status recorded for B00621504-S1 is “Permit Entire.”
Construction of 22 story mixed-use new building. Filing B00621504-P3.
Mechanical Scope filed in conjunction with NB application B00621504. Filing B00621504-P7.
Installation of sprinkler/standpipe system in conjunction with construction of 22-story new building. Filing B00621504-P8.
Pressurized alarm system (temporary standpipe) in conjunction with construction of 22-story new building. Filing B00621504-P9.
Superstructure work filed in conjunction with NB B00621504. Filing B00621504-P6.
Foundation scope filed in conjunction with NB application B0061504. Filing B00621504-P5.
Filing B00621504-P6 reached an approved status.
The latest status recorded for B00621504-P6 is “Approved.”
The latest status recorded for B00621504-S9 is “Permit Entire.”
Filing B00621504-P9 reached an approved status.
The latest status recorded for B00621504-P9 is “Approved.”
The latest status recorded for B00621504-S5 is “Permit Entire.”
Filing B00621504-P8 reached an approved status.
The latest status recorded for B00621504-P8 is “Approved.”
The latest status recorded for B00621504-P5 is “Objections.”
The latest status recorded for B00621504-S3 is “Approved.”
Filing B00621504-P7 reached an approved status.
The latest status recorded for B00621504-P7 is “Approved.”
DOB lists a first permit date for B00621504-S2. That is not by itself confirmation of activity on site.
The latest status recorded for B00621504-Z2 is “Permit Entire.”
The latest status recorded for B00621504-P3 is “Objections.”
The latest status recorded for B00621504-S2 is “Permit Entire.”