Building record · BIN 3430013

1730 Bedford Avenue

1730 Bedford Avenue, Brooklyn, NY 11225

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 20 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3430013

1730 Bedford Avenue

Prospect Lefferts Gardens-Wingate, Brooklyn

A consolidated public-record view · updated Sep 26, 2026

DOB filings
20
Active-status
12
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings20
Open or active-status records12
First included filingNov 9, 2021
Latest recorded changeSep 26, 2026

The lot

What is already here?

The lot holds a 6-story condominium built in 2023, on a 28,000 sq ft lot.

  1. Floors 2–6Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as mixed residential and commercial, so this floor is where the commercial space is.
  • Street levelMixed residential and commercial
  • Above the southern skylineFrom about floor 8 — the tallest thing within 60 m to the south is 21.9 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 21.3 m over 6 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
2023
Floors
6
Residential units
1
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C8-2
Lot area
28,000 sq ft
Building area
125,270 sq ft

Owner of record

RICHGENE REALTY CORP

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 28, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 3 notices on file; the most recent was issued Jul 19, 2023.

  • Construction

    Issued Jul 19, 2023 — VEHICLE IMPACTING BUILDING

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 28, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3430013. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 4 alteration filing, 16 new building. Its latest status categories are 12 approved, 8 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Nov 9, 2021
Latest recorded change
Sep 26, 2026
Highest proposed story count
7 stories
Highest proposed unit count
57 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1730 Bedford Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 20 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    New 6 story mixed use building including basement with cellar and sub cellar. Filing B00620031-I1.

    01
  2. New building filed

    Soe work in conjunction with nb application #b00620031-i1. Filing B00620031-S1.

    02
  3. New building filed

    Pl, sp, & sd work filed conjunction with nb #b00620031-i1 & job #b00636077. Filing B00620031-S5.

    03
  4. New building filed

    Foundation work in conjunction with nb # b00620031-i1. Filing B00620031-S3.

    04
  5. New building approved

    Filing B00620031-S5 reached an approved status.

    05
  6. New building approved

    Filing B00620031-S1 reached an approved status.

    06
  7. New building approved

    Filing B00620031-S3 reached an approved status.

    07
  8. New building approved

    Filing B00620031-I1 reached an approved status.

    08
  9. Permit recorded for new building

    DOB lists a first permit date for B00620031-I1. That is not by itself confirmation of activity on site.

    09
  10. Permit recorded for new building

    DOB lists a first permit date for B00620031-S1. That is not by itself confirmation of activity on site.

    010
  11. Permit recorded for new building

    DOB lists a first permit date for B00620031-S3. That is not by itself confirmation of activity on site.

    011
  12. Permit recorded for new building

    DOB lists a first permit date for B00620031-S5. That is not by itself confirmation of activity on site.

    012
  13. New building filed

    Structural work in conjunction with nb # b00620031. Filing B00620031-S4.

    013
  14. New building filed

    Underpinning work in conjunction with FO job #B00860197-I1. Filing B00620031-S7.

    014
  15. New building approved

    Filing B00620031-S7 reached an approved status.

    015
  16. Permit recorded for new building

    DOB lists a first permit date for B00620031-S7. That is not by itself confirmation of activity on site.

    016
  17. New building approved

    Filing B00620031-S4 reached an approved status.

    017
  18. Permit recorded for new building

    DOB lists a first permit date for B00620031-S4. That is not by itself confirmation of activity on site.

    018
  19. New building filed

    Mechanical work filed in conjunction with nb#b00620031. Filing B00620031-S6.

    019
  20. Alteration filed

    Curb Cuts filed in Conjunction with NB. Filing B00788212-S1.

    020
  21. New building filed

    New 6 story mixed use building including basement with cellar and sub cellar. Filing B00620031-P4.

    021
  22. New building approved

    Filing B00620031-S6 reached an approved status.

    022
  23. New building filed

    Soe work in conjunction with nb application #b00620031-i1. Filing B00620031-P2.

    023
  24. New building filed

    Foundation work in conjunction with nb # b00620031-i1. Filing B00620031-P1.

    024
  25. New building approved

    Filing B00620031-P1 reached an approved status.

    025
  26. New building now approved

    The latest status recorded for B00620031-P1 is “Approved.”

    026
  27. New building filed

    Pl, sp, & sd work filed conjunction with nb #b00620031-i1. Filing B00620031-P5.

    027
  28. New building approved

    Filing B00620031-P2 reached an approved status.

    028
  29. New building now approved

    The latest status recorded for B00620031-P2 is “Approved.”

    029
  30. New building approved

    Filing B00620031-P5 reached an approved status.

    030
  31. New building now approved

    The latest status recorded for B00620031-P5 is “Approved.”

    031
  32. New building filed

    Pl, sp, & sd work filed conjunction with nb #b00620031-i1 & job #b00636077. Filing B00620031-P7.

    032
  33. New building filed

    Proposed temporary construction fence associated with new building application. Filing B00620031-Z4.

    033
  34. New building approved

    Filing B00620031-Z4 reached an approved status.

    034
  35. New building approved

    Filing B00620031-P7 reached an approved status.

    035
  36. New building now approved

    The latest status recorded for B00620031-P7 is “Approved.”

    036
  37. Permit recorded for new building

    DOB lists a first permit date for B00620031-Z4. That is not by itself confirmation of activity on site.

    037
  38. New building approved

    Filing B00620031-P4 reached an approved status.

    038
  39. New building now approved

    The latest status recorded for B00620031-P4 is “Approved.”

    039
  40. New building signed off

    DOB recorded a sign-off for B00620031-S1.

    040
  41. New building now completed

    The latest status recorded for B00620031-S1 is “LOC Issued.”

    041
  42. New building signed off

    DOB recorded a sign-off for B00620031-S7.

    042
  43. New building now completed

    The latest status recorded for B00620031-S7 is “LOC Issued.”

    043
  44. New building signed off

    DOB recorded a sign-off for B00620031-S3.

    044
  45. New building now completed

    The latest status recorded for B00620031-S3 is “LOC Issued.”

    045
  46. New building signed off

    DOB recorded a sign-off for B00620031-S4.

    046
  47. New building now completed

    The latest status recorded for B00620031-S4 is “LOC Issued.”

    047
  48. New building filed

    New 6 story mixed use building including basement with cellar and sub cellar. Filing B00620031-P8.

    048
  49. Permit recorded for new building

    DOB lists a first permit date for B00620031-S6. That is not by itself confirmation of activity on site.

    049
  50. New building now approved

    The latest status recorded for B00620031-S6 is “Permit Entire.”

    050
  51. Alteration filed

    Filing for new mechanical work to include a new heat pump system, providing the heating and cooling, make-up air, and ventilation for the space, a new grease exhaust hood and exhaust fan and new exhaust for restrooms, no change to use occupancy or egress. Filing B01156614-S1.

    051
  52. Alteration approved

    Filing B01156614-S1 reached an approved status.

    052
  53. Permit recorded for alteration

    DOB lists a first permit date for B01156614-S1. That is not by itself confirmation of activity on site.

    053
  54. New building filed

    Structural work in conjunction with nb # b00620031-i1 and st # b00620031-s4, to create concrete slab cut-outs for new openings as shown on plans. Filing B00620031-Z5.

    054
  55. New building approved

    Filing B00620031-Z5 reached an approved status.

    055
  56. New building now approved

    The latest status recorded for B00620031-Z5 is “Approved.”

    056
  57. New building filed

    Pl, sp, & sd work filed conjunction with nb #b00620031-i1 & job #b00636077. Filing B00620031-P9.

    057
  58. New building approved

    Filing B00620031-P8 reached an approved status.

    058
  59. New building now approved

    The latest status recorded for B00620031-P8 is “Approved.”

    059
  60. New building approved

    Filing B00620031-P9 reached an approved status.

    060
  61. New building now approved

    The latest status recorded for B00620031-P9 is “Approved.”

    061
  62. Alteration approved

    Filing B00788212-S1 reached an approved status.

    062
  63. Alteration filed

    Erect sign structures for wall signs. No change of use, egress or occupancy. Filing B01253160-I1.

    063
  64. Alteration approved

    Filing B01253160-I1 reached an approved status.

    064
  65. Permit recorded for alteration

    DOB lists a first permit date for B01253160-I1. That is not by itself confirmation of activity on site.

    065
  66. New building signed off

    DOB recorded a sign-off for B00620031-Z4.

    066
  67. New building now completed

    The latest status recorded for B00620031-Z4 is “LOC Issued.”

    067
  68. Permit recorded for alteration

    DOB lists a first permit date for B00788212-S1. That is not by itself confirmation of activity on site.

    068
  69. New building signed off

    DOB recorded a sign-off for B00620031-S5.

    069
  70. New building now completed

    The latest status recorded for B00620031-S5 is “LOC Issued.”

    070
  71. Alteration signed off

    DOB recorded a sign-off for B00788212-S1.

    071
  72. Alteration now completed

    The latest status recorded for B00788212-S1 is “LOC Issued.”

    072
  73. Alteration filed

    Filing for new mechanical work to include a new heat pump system, providing the heating and cooling, make-up air, and ventilation for the space, a new grease exhaust hood and exhaust fan and new exhaust for restrooms, no change to use occupancy or egress. Filing B01156614-P2.

    073
  74. Alteration approved

    Filing B01156614-P2 reached an approved status.

    074
  75. Alteration now approved

    The latest status recorded for B01156614-P2 is “Approved.”

    075
  76. Alteration signed off

    DOB recorded a sign-off for B01156614-S1.

    076
  77. Alteration now completed

    The latest status recorded for B01156614-S1 is “LOC Issued.”

    077
  78. New building now approved

    The latest status recorded for B00620031-I1 is “Permit Entire.”

    078
  79. Alteration now approved

    The latest status recorded for B01253160-I1 is “Permit Entire.”

    079