DOB filing B01293780-S2
Alteration filing at 499 President Street
Building record · BIN 3430032
499 President Street, Brooklyn, NY 11215
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 23 independently sourced records, including 15 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3430032
499 President Street
Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn
A consolidated public-record view · updated Oct 27, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 9-story elevator apartment building built in 2023, with 350 homes, on a 50,748 sq ft lot.
Housing violations
6 violations are open against this address under the Housing Maintenance Code. 1 of them is the class the city calls immediately hazardous.
Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.
What it sold for
1 apartment on this tax block changed hands in the year the city last published, at a median of $680,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
GOWANUS PRESIDENT OWNER LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 1 open notice on record for this building, out of 5 notices on file; the most recent was issued Nov 14, 2025.
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3430032. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 23 alteration filing. Its latest status categories are 8 recorded as completed, 15 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 499 President Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 23 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of 8' high plywood construction fence. Filing B00438890-I1.
Filing B00438890-I1 reached an approved status.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00456925-I1.
Installation of temporary overhead protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00461893-I1.
DOB lists a first permit date for B00461893-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00456925-I1. That is not by itself confirmation of activity on site.
Installation of temporary overhead protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing B00461893-P1.
Filing B00461893-P1 reached an approved status.
The latest status recorded for B00461893-P1 is “Approved.”
DOB lists a first permit date for B00438890-I1. That is not by itself confirmation of activity on site.
HPD NB already assigned to HUB. Please assign to HUB plan examiner. Herewith filing plumbing in conjunction with the NB application # 321598400. Underground plumbing filed under B00641891. Filing B00641923-I1.
Herewith filing SOE in conjunction with NB # 321598400. Filing B00595766-I1.
Herewith filing PAA to updated the drawings and the mechanical equipment information as per the AI-1. Filing B00643023-I1.
Filing B00641923-I1 reached an approved status.
HPD NB already assigned to HUB. Please assign to HUB plan examiner. Herewith filing underground plumbing in conjunction with the NB application # 321598400. Filing B00641891-I1.
Installation of temporary dry pressurized standpipe with hose valve station at each floor for the construction phases of new 10 story building filed in conjunction with nb #321598400. Filing B00680784-I1.
Filing B00641891-I1 reached an approved status.
Filing B00680784-I1 reached an approved status.
Filing B00595766-I1 reached an approved status.
Filing B00643023-I1 reached an approved status.
HPD NB already assigned to HUB. Please assign to HUB plan examiner. Herewith filing structural in conjunction with the NB application # 321598400. Filing B00641588-I1.
Filing B00641588-I1 reached an approved status.
DOB recorded a sign-off for B00456925-I1.
The latest status recorded for B00456925-I1 is “LOC Issued.”
DOB recorded a sign-off for B00461893-I1.
The latest status recorded for B00461893-I1 is “LOC Issued.”
DOB recorded a sign-off for B00438890-I1.
The latest status recorded for B00438890-I1 is “LOC Issued.”
HPD NB already assigned to HUB. Please assign to HUB plan examiner. Herewith filing mechanical in conjunction with NB # 321598400. Filing B00643023-P3.
HPD NB already assigned to HUB. Please assign to HUB plan examiner. Herewith filing mechanical in conjunction with NB # 321598400. Filing B00643023-P1.
Filing B00643023-P3 reached an approved status.
Filing B00643023-P1 reached an approved status.
The latest status recorded for B00643023-P1 is “Approved.”
The latest status recorded for B00643023-P3 is “Approved.”
DOB lists a first permit date for B00680784-I1. That is not by itself confirmation of activity on site.
Herewith filing SOE in conjunction with NB # 321598400. Filing B00595766-P1.
Filing B00595766-P1 reached an approved status.
The latest status recorded for B00595766-P1 is “Approved.”
DOB lists a first permit date for B00595766-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00641891-I1. That is not by itself confirmation of activity on site.
HPD NB already assigned to HUB. Please assign to HUB plan examiner. Herewith filing underground plumbing in conjunction with the NB application # 321598400. Filing B00641891-P1.
Filing B00641891-P1 reached an approved status.
The latest status recorded for B00641891-P1 is “Approved.”
DOB lists a first permit date for B00641588-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00641923-I1. That is not by itself confirmation of activity on site.
HPD NB already assigned to HUB. Please assign to HUB plan examiner. Herewith filing plumbing in conjunction with the NB application # 321598400. Underground plumbing filed under B00641891. Filing B00641923-P1.
Filing B00641923-P1 reached an approved status.
The latest status recorded for B00641923-P1 is “Approved.”
DOB recorded a sign-off for B00595766-I1.
The latest status recorded for B00595766-I1 is “LOC Issued.”
DOB lists a first permit date for B00643023-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00641588-I1 is “Permit Entire.”
Herewith filing PAA to updated the drawings and the mechanical equipment information as per the AI-1. Filing B00643023-P6.
HPD NB already assigned to HUB. Please assign to HUB plan examiner. Herewith filing plumbing in conjunction with the NB application # 321598400. Underground plumbing filed under B00641891. Filing B00641923-P2.
Filing B00641923-P2 reached an approved status.
The latest status recorded for B00641923-P2 is “Approved.”
Filing B00643023-P6 reached an approved status.
The latest status recorded for B00643023-P6 is “Approved.”
Herewith filing PAA to updated the drawings and the mechanical equipment information as per the AI-1. Filing B00643023-P7.
The latest status recorded for B00643023-I1 is “Permit Entire.”
Filing B00643023-P7 reached an approved status.
The latest status recorded for B00643023-P7 is “Approved.”
HPD NB already assigned to HUB. Please assign to HUB plan examiner. Herewith filing plumbing in conjunction with the NB application # 321598400. Underground plumbing filed under B00641891. Filing B00641923-P3.
Filing B00641923-P3 reached an approved status.
The latest status recorded for B00641923-P3 is “Approved.”
DOB recorded a sign-off for B00680784-I1.
The latest status recorded for B00680784-I1 is “LOC Issued.”
HPD NB already assigned to HUB. Please assign to HUB plan examiner. Herewith filing plumbing in conjunction with the NB application # 321598400. Underground plumbing filed under B00641891. Filing B00641923-P4.
Filing B00641923-P4 reached an approved status.
The latest status recorded for B00641923-P4 is “Approved.”
DOB recorded a sign-off for B00641891-I1.
The latest status recorded for B00641891-I1 is “LOC Issued.”
DOB recorded a sign-off for B00641923-I1.
The latest status recorded for B00641923-I1 is “LOC Issued.”
Ductwork connected to existing packaged hp unit & bath vent in conjunction with build-out of commercial space. no chnage to use, egress, or occupancy. Filing B01293780-S2.
Filing B01293780-S2 reached an approved status.
First floor retail tenant renovation for new food store within existing demised tenant space 'e' . install new interior partitions, ceilings, flooring, and millwork. no change to use, egress or occupancy. Filing B01416184-I1.
Plumbing work filed in conjuction with first floor retail tenant renovation for new food store in tenant space 'e'. install plumbing fixtures and related piping. Filing B01416184-S2.
Filing B01416184-I1 reached an approved status.
The latest status recorded for B01416184-I1 is “Approved.”
Filing B01416184-S2 reached an approved status.
The latest status recorded for B01416184-S2 is “Approved.”
DOB lists a first permit date for B01293780-S2. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B01293780-S2.
The latest status recorded for B01293780-S2 is “LOC Issued.”