Building record · BIN 3430142

95 Rockwell Place

95 Rockwell Place, Brooklyn, NY 11217

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 11 independently sourced records, including 11 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3430142

95 Rockwell Place

Fort Greene, Brooklyn

A consolidated public-record view · updated Oct 7, 2026

DOB filings
11
Active-status
11
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings11
Open or active-status records11
First included filingJun 21, 2023
Latest recorded changeOct 7, 2026

The lot

What is already here?

The lot holds a vacant land on a 6,030 sq ft lot.

Last altered
2023
Residential units
0
Building type
Vacant land
Land use
Vacant land
Zoning district
C6-4
Lot area
6,030 sq ft

Owner of record

NYC TRANSIT

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

The Department of Buildings has 10 open notices on record for this building, out of 85 notices on file; the most recent was issued Jun 30, 2023.

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • Non-residential elevator periodic

    Issued May 20, 2019 — FAILURE TO PERFORM CATEGORY 5 INSPECTION

  • Elevator annual inspection /

    Issued Apr 5, 2019 — VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST

  • 7 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3430142. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 10 new building, 1 alteration filing. Its latest status categories are 6 approved, 5 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jun 21, 2023
Latest recorded change
Oct 7, 2026
Highest proposed story count
54 stories
Highest proposed unit count
190 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 95 Rockwell Place.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 11 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Proposed construction fence. no change to use, egress or occupancy under this application. Filing B00888798-I1.

    01
  2. Alteration approved

    Filing B00888798-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for B00888798-I1. That is not by itself confirmation of activity on site.

    03
  4. New building filed

    Mechanical work for new 43 story building. Filing B00948534-S4.

    04
  5. New building filed

    Temporary standpipe for new building. Filing B00948534-S7.

    05
  6. New building approved

    Filing B00948534-S7 reached an approved status.

    06
  7. New building filed

    Underground, cellar, and 1st floor plumbing work in conjunction with NB. Filing B00948534-S8.

    07
  8. New building approved

    Filing B00948534-S8 reached an approved status.

    08
  9. Permit recorded for new building

    DOB lists a first permit date for B00948534-S8. That is not by itself confirmation of activity on site.

    09
  10. Permit recorded for new building

    DOB lists a first permit date for B00948534-S7. That is not by itself confirmation of activity on site.

    010
  11. New building approved

    Filing B00948534-S4 reached an approved status.

    011
  12. Permit recorded for new building

    DOB lists a first permit date for B00948534-S4. That is not by itself confirmation of activity on site.

    012
  13. New building filed

    Structural drawings filed herewith for new 43 story building. Filing B00948534-A2.

    013
  14. New building filed

    Erect new 53 story building. Hub consultation held on 10.17.23. MPP project #349. Filing B00948534-A1.

    014
  15. Alteration now approved

    The latest status recorded for B00888798-I1 is “Permit Entire.”

    015
  16. New building filed

    SPSD drawings filed herewith for new 54 story building. Filing B00948534-A8.

    016
  17. New building filed

    Plumbing drawings filed herewith for new 54 story building. Filing B00948534-A4.

    017
  18. New building filed

    Temporary standpipe for new building. Filing B00948534-A9.

    018
  19. New building now approved

    The latest status recorded for B00948534-S4 is “Permit Entire.”

    019
  20. New building now under review

    The latest status recorded for B00948534-A1 is “Plan Examiner Review.”

    020
  21. New building filed

    Mechanical work for new 43 story building. Filing B00948534-B8.

    021
  22. New building now under review

    The latest status recorded for B00948534-A2 is “Plan Examiner Review.”

    022
  23. New building now under review

    The latest status recorded for B00948534-A4 is “Objections.”

    023
  24. New building approved

    Filing B00948534-A9 reached an approved status.

    024
  25. New building now approved

    The latest status recorded for B00948534-A9 is “Approved.”

    025
  26. New building now approved

    The latest status recorded for B00948534-S7 is “Permit Entire.”

    026
  27. New building now under review

    The latest status recorded for B00948534-B8 is “Objections.”

    027
  28. New building filed

    Underground, cellar, and 1st floor plumbing work in conjunction with NB. Filing B00948534-B3.

    028
  29. New building approved

    Filing B00948534-B3 reached an approved status.

    029
  30. New building now approved

    The latest status recorded for B00948534-B3 is “Approved.”

    030
  31. New building now under review

    The latest status recorded for B00948534-A8 is “Plan Examiner Review.”

    031
  32. New building now approved

    The latest status recorded for B00948534-S8 is “Permit Entire.”

    032