DOB filing B00645411-S8
New building at 55 Willoughby Street
Building record · BIN 3430308
55 Willoughby Street, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 39 independently sourced records, including 27 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3430308
55 Willoughby Street
Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn
A consolidated public-record view · updated Sep 14, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 42-story elevator apartment building built in 2023, with 293 homes, on a 10,681 sq ft lot.
Owner of record
WENDY REALTY INC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 17 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3430308. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 35 new building, 4 alteration filing. Its latest status categories are 7 recorded as completed, 27 approved, 5 closed or withdrawn. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 55 Willoughby Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 39 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
File plumbing work in conjunction with bis job# 322044471. Filing B00332038-I1.
Filing B00332038-I1 reached an approved status.
File mechanical work in conjunction with bis job# 322044471. Filing B00332039-I1.
DOB lists a first permit date for B00332038-I1. That is not by itself confirmation of activity on site.
Filing B00332039-I1 reached an approved status.
The latest status recorded for B00332038-I1 is “Permit Entire.”
The latest status recorded for B00332039-I1 is “Approved.”
New 43 story building. Filing B00645411-I1.
Phase 1 SOE in conjunction with NB. Filing B00645411-S3.
Phase 1 Foundation work in conjunction with NB. Filing B00645411-S1.
Structural work in conjunction with NB. Filing B00645411-S5.
Phase 2 Foundation work in conjunction with NB. Filing B00645411-S2.
Application filed for early foundation elements in conjunction with NB filing to include excavation, shoring, formwork and pouring of two concrete spread footings for future foundation in conjunction with NB # B00645411. Filing B00650219-I1.
Filing B00650219-I1 reached an approved status.
Early support of excavation work in conjunction with New Building # B00645411. Filing B00650219-S1.
Filing B00650219-S1 reached an approved status.
Underpinning in conjunction with new building. Filing B00645411-S6.
Phase 2 SOE in conjunction with NB. Filing B00645411-S4.
Filing B00645411-S4 reached an approved status.
Filing B00645411-S3 reached an approved status.
Filing B00645411-S1 reached an approved status.
Filing B00645411-S2 reached an approved status.
DOB lists a first permit date for B00645411-S3. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00645411-S4. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00645411-S1. That is not by itself confirmation of activity on site.
Phase 2 SOE in conjunction with NB. Filing B00645411-P1.
Filing B00645411-P1 reached an approved status.
Phase 2 Foundation work in conjunction with NB. Filing B00645411-P2.
Filing B00645411-P2 reached an approved status.
Plumbing work in conjunction with NB # B00645411. Filing B00645411-S8.
Mechanical work in conjunction with NB # B00645411. Filing B00645411-S7.
Installation of Temporary Dry Standpipe in conjunction with NB # B00645411. Filing B00645411-Z1.
Sprinkler/Standpipe work in conjunction with NB # B00645411. Filing B00645411-S9.
Filing B00645411-Z1 reached an approved status.
Filing B00645411-S9 reached an approved status.
DOB lists a first permit date for B00645411-S2. That is not by itself confirmation of activity on site.
Filing B00645411-S6 reached an approved status.
Phase 2 SOE in conjunction with NB. Filing B00645411-P3.
Phase 2 Foundation work in conjunction with NB. Filing B00645411-P4.
Filing B00645411-P3 reached an approved status.
Filing B00645411-P4 reached an approved status.
Underpinning in conjunction with new building. Filing B00645411-P7.
Phase 2 SOE in conjunction with NB. Filing B00645411-P6.
Filing B00645411-P7 reached an approved status.
Phase 2 Foundation work in conjunction with NB. Filing B00645411-P5.
Filing B00645411-P6 reached an approved status.
Filing B00645411-P5 reached an approved status.
DOB lists a first permit date for B00645411-Z1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00645411-S9. That is not by itself confirmation of activity on site.
Filing B00645411-S5 reached an approved status.
The latest status recorded for B00645411-P1 is “Approved.”
The latest status recorded for B00645411-P2 is “Approved.”
The latest status recorded for B00645411-P3 is “Approved.”
The latest status recorded for B00645411-P4 is “Approved.”
The latest status recorded for B00645411-P5 is “Approved.”
The latest status recorded for B00645411-P6 is “Approved.”
Filing B00645411-I1 reached an approved status.
Installation of underground piping in conjunction with NB # B00645411. Filing B00645411-Z2.
Filing B00645411-Z2 reached an approved status.
DOB lists a first permit date for B00645411-Z2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00645411-S5. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00645411-I1. That is not by itself confirmation of activity on site.
Filing B00645411-S8 reached an approved status.
Filing B00645411-S7 reached an approved status.
DOB lists a first permit date for B00645411-S8. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00645411-S7. That is not by itself confirmation of activity on site.
New 42 story building. Filing B00645411-P8.
Plumbing work in conjunction with NB # B00645411. Filing B00645411-P9.
Filing B00645411-P9 reached an approved status.
The latest status recorded for B00645411-P9 is “Approved.”
Filing B00645411-P8 reached an approved status.
The latest status recorded for B00645411-P8 is “Approved.”
New 42 story building. Filing B00645411-A1.
Filing B00645411-A1 reached an approved status.
The latest status recorded for B00645411-A1 is “Approved.”
New 43 story building. Filing B00645411-A3.
Filing B00645411-A3 reached an approved status.
The latest status recorded for B00645411-A3 is “Approved.”
The latest status recorded for B00645411-A4 is “Filing Withdrawn.”
New 43 story building. Filing B00645411-B2.
Sprinkler/Standpipe work in conjunction with NB # B00645411. Filing B00645411-B3.
Phase 2 Foundation work in conjunction with NB. Filing B00645411-A5.
Plumbing work in conjunction with NB # B00645411. Filing B00645411-B4.
Installation of underground piping in conjunction with NB # B00645411. Filing B00645411-B6.
Filing B00645411-B4 reached an approved status.
The latest status recorded for B00645411-B4 is “Approved.”
Filing B00645411-B6 reached an approved status.
The latest status recorded for B00645411-B6 is “Approved.”
Mechanical work in conjunction with NB # B00645411. Filing B00645411-B5.
Filing B00645411-B3 reached an approved status.
The latest status recorded for B00645411-B3 is “Approved.”
DOB recorded a sign-off for B00645411-S3.
The latest status recorded for B00645411-S3 is “LOC Issued.”
DOB recorded a sign-off for B00645411-S4.
The latest status recorded for B00645411-S4 is “LOC Issued.”
The latest status recorded for B00645411-S9 is “Permit Entire.”
The latest status recorded for B00645411-Z1 is “Permit Entire.”
Filing B00645411-A5 reached an approved status.
The latest status recorded for B00645411-A5 is “Approved.”
The latest status recorded for B00645411-P7 is “Filing Withdrawn.”
The latest status recorded for B00645411-S6 is “Filing Withdrawn.”
The latest status recorded for B00650219-S1 is “Filing Withdrawn.”
The latest status recorded for B00650219-I1 is “Filing Withdrawn.”
Filing B00645411-B5 reached an approved status.
The latest status recorded for B00645411-B5 is “Approved.”
Filing B00645411-B2 reached an approved status.
The latest status recorded for B00645411-B2 is “Approved.”
Structural work in conjunction with NB. Filing B00645411-A6.
DOB recorded a sign-off for B00645411-Z2.
The latest status recorded for B00645411-Z2 is “LOC Issued.”
Filing B00645411-A6 reached an approved status.
The latest status recorded for B00645411-A6 is “Approved.”
DOB recorded a sign-off for B00645411-S2.
The latest status recorded for B00645411-S2 is “LOC Issued.”
Plumbing work in conjunction with NB # B00645411. Filing B00645411-C2.
Filing B00645411-C2 reached an approved status.
The latest status recorded for B00645411-C2 is “Approved.”
DOB recorded a sign-off for B00645411-S5.
The latest status recorded for B00645411-S5 is “LOC Issued.”
Plumbing work in conjunction with NB # B00645411. Filing B00645411-C4.
New 43 story building. Filing B00645411-C3.
Filing B00645411-C3 reached an approved status.
The latest status recorded for B00645411-C3 is “Approved.”
The latest status recorded for B00645411-I1 is “Permit Entire.”
Mechanical work in conjunction with NB # B00645411. Filing B00645411-C5.
Filing B00645411-C4 reached an approved status.
The latest status recorded for B00645411-C4 is “Approved.”
Filing B00645411-C5 reached an approved status.
The latest status recorded for B00645411-C5 is “Approved.”
The latest status recorded for B00645411-S7 is “Permit Entire.”
DOB recorded a sign-off for B00645411-S1.
The latest status recorded for B00645411-S1 is “LOC Issued.”
DOB recorded a sign-off for B00645411-S8.
The latest status recorded for B00645411-S8 is “LOC Issued.”