DOB filing B01463371-I1
Alteration filing at 241 Third Avenue
Building record · BIN 3430371
241 Third Avenue, Brooklyn, NY 11217
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 9 independently sourced records, including 9 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3430371
241 Third Avenue
Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn
A consolidated public-record view · updated Sep 25, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a vacant land on a 21,055 sq ft lot.
Owner of record
UNION STREET OWNER LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not any single filing.
Violation record
No open violations are recorded for this building.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3430371. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 5 alteration filing, 4 new building. Its latest status categories are 4 under review, 5 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 241 Third Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 9 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Construct new eight (8) story mixed-use building with cellar as per plans filed, which will include 25 Mandatory Inclusionary Housing dwelling units, 61 Market Rate dwelling units, with retail space provided at the first floor. Filing B01278364-I1.
Install structural work for related new building, with cellar, including concrete shear walls, 8" concrete slabs, supported by concrete columns. Filing B01278364-S3.
Install foundation of related eight (8) story new building b01278364-i1 with cellar including concrete shear walls, pile, mat pil cap supported on piles and concrete foundation walls. Filing B01278364-S2.
Install support of excavation as per plans filed, in conjunction with nb# b01278364-i1. Filing B01278364-S1.
Soldier piles with internal lateral bracing and stable soil berm for the proposed excavation and foundation work as per plans filed. no change in use egress or occupancy. Filing B01349101-I1.
Filing B01349101-I1 reached an approved status.
DOB lists a first permit date for B01349101-I1. That is not by itself confirmation of activity on site.
Soldier piles with internal lateral bracing and stable soil berm for the proposed excavation and foundation work as per plans filed. no change in use egress or occupancy. Filing B01349101-P1.
The latest status recorded for B01278364-S2 is “Plan Examiner Review.”
The latest status recorded for B01278364-I1 is “Plan Examiner Review.”
The latest status recorded for B01278364-S3 is “Plan Examiner Review.”
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the NYC building code. no change in use, occupancy, or egress under this application. Filing B01460780-I1.
Knuckleboom placement. this application involves no change in use, occupancy or egress. Filing B01411978-I1.
DOB lists a first permit date for B01460780-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01460780-I1 is “Permit Entire.”
Filing B01411978-I1 reached an approved status.
The latest status recorded for B01411978-I1 is “Approved.”
Filing B01349101-P1 reached an approved status.
The latest status recorded for B01349101-P1 is “Approved.”
The latest status recorded for B01349101-I1 is “Permit Entire.”
Installation of temporary protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code. Filing B01463371-I1.
Filing B01278364-S1 reached an approved status.
The latest status recorded for B01278364-S1 is “Approved.”
The latest status recorded for B01463371-I1 is “Pending Prof Cert QA Assignment.”