Building record · BIN 3430426

148 2 Street

148 2 Street, Brooklyn, NY 11231

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 39 independently sourced records, including 39 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3430426

148 2 Street

Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn

A consolidated public-record view · updated Aug 26, 2026

DOB filings
39
Active-status
39
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings39
Open or active-status records39
First included filingDec 8, 2021
Latest recorded changeAug 26, 2026

The lot

What is already here?

The lot holds a 22-story elevator apartment building built in 2025, with 301 homes, on a 52,534 sq ft lot.

Built
2025
Last altered
2022
Floors
22
Residential units
301
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
M1-4/R7-2
Lot area
52,534 sq ft
Building area
348,171 sq ft

What it sold for

4 apartments on this tax block changed hands in the year the city last published, at a median of $105,000,000, from 105,000,000 to 105,000,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3430426. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 37 new building, 2 alteration filing. Its latest status categories are 3 under review, 36 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Dec 8, 2021
Latest recorded change
Aug 26, 2026
Highest proposed story count
22 stories
Highest proposed unit count
301 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 148 2 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 39 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    Contruct new 22 story building per plans filed herewith. Filing B00640761-I1.

    01
  2. New building filed

    Provide support of excavation work as per plans filed. Filing B00640761-S2.

    02
  3. New building filed

    Mechanical work as per plans filed. Filing B00640761-S4.

    03
  4. New building filed

    Structural work as per plans filed. Filing B00640761-S3.

    04
  5. New building filed

    Plumbing work as per plans filed. Filing B00640761-S5.

    05
  6. New building filed

    Install foundation as per plans filed. Filing B00640761-S6.

    06
  7. New building filed

    Excavation as per plans filed. Filing B00640761-S7.

    07
  8. New building approved

    Filing B00640761-S7 reached an approved status.

    08
  9. New building approved

    Filing B00640761-S3 reached an approved status.

    09
  10. New building approved

    Filing B00640761-S2 reached an approved status.

    010
  11. New building filed

    Identification of Deep Foundation Elements and pile types proposed. Filing B00640761-S8.

    011
  12. New building approved

    Filing B00640761-S6 reached an approved status.

    012
  13. New building approved

    Filing B00640761-S8 reached an approved status.

    013
  14. Permit recorded for new building

    DOB lists a first permit date for B00640761-S2. That is not by itself confirmation of activity on site.

    014
  15. Permit recorded for new building

    DOB lists a first permit date for B00640761-S7. That is not by itself confirmation of activity on site.

    015
  16. Permit recorded for new building

    DOB lists a first permit date for B00640761-S6. That is not by itself confirmation of activity on site.

    016
  17. Permit recorded for new building

    DOB lists a first permit date for B00640761-S8. That is not by itself confirmation of activity on site.

    017
  18. New building approved

    Filing B00640761-S5 reached an approved status.

    018
  19. New building filed

    Install foundation as per plans filed. Filing B00640761-P1.

    019
  20. New building filed

    Identification of Deep Foundation Elements and pile types proposed. Filing B00640761-P2.

    020
  21. New building approved

    Filing B00640761-P1 reached an approved status.

    021
  22. New building approved

    Filing B00640761-P2 reached an approved status.

    022
  23. New building approved

    Filing B00640761-S4 reached an approved status.

    023
  24. New building approved

    Filing B00640761-I1 reached an approved status.

    024
  25. New building filed

    Install foundation as per plans filed. Filing B00640761-P3.

    025
  26. New building approved

    Filing B00640761-P3 reached an approved status.

    026
  27. New building filed

    Provide support of excavation work as per plans filed. Filing B00640761-P4.

    027
  28. New building approved

    Filing B00640761-P4 reached an approved status.

    028
  29. New building filed

    Install temporary construction fence as per plans filed. Filing B00640761-S9.

    029
  30. New building approved

    Filing B00640761-S9 reached an approved status.

    030
  31. Permit recorded for new building

    DOB lists a first permit date for B00640761-S9. That is not by itself confirmation of activity on site.

    031
  32. Permit recorded for new building

    DOB lists a first permit date for B00640761-S5. That is not by itself confirmation of activity on site.

    032
  33. New building filed

    Plumbing work as per plans filed. Filing B00640761-P6.

    033
  34. New building filed

    Contruct new 22 story building per plans filed herewith. Filing B00640761-P5.

    034
  35. New building now approved

    The latest status recorded for B00640761-P1 is “Approved.”

    035
  36. New building now approved

    The latest status recorded for B00640761-P2 is “Approved.”

    036
  37. New building now approved

    The latest status recorded for B00640761-P3 is “Approved.”

    037
  38. New building now approved

    The latest status recorded for B00640761-P4 is “Approved.”

    038
  39. New building approved

    Filing B00640761-P5 reached an approved status.

    039
  40. New building now approved

    The latest status recorded for B00640761-P5 is “Approved.”

    040
  41. New building now approved

    The latest status recorded for B00640761-S7 is “Permit Entire.”

    041
  42. New building filed

    Contruct new 22 story building per plans filed herewith. Filing B00640761-P7.

    042
  43. New building filed

    Structural work as per plans filed. Filing B00640761-P8.

    043
  44. New building filed

    Install foundation as per plans filed. Filing B00640761-P9.

    044
  45. New building approved

    Filing B00640761-P7 reached an approved status.

    045
  46. New building now approved

    The latest status recorded for B00640761-P7 is “Approved.”

    046
  47. New building approved

    Filing B00640761-P9 reached an approved status.

    047
  48. New building now approved

    The latest status recorded for B00640761-P9 is “Approved.”

    048
  49. New building filed

    Mechanical work as per plans filed. Filing B00640761-A1.

    049
  50. New building approved

    Filing B00640761-P6 reached an approved status.

    050
  51. New building now approved

    The latest status recorded for B00640761-P6 is “Approved.”

    051
  52. New building approved

    Filing B00640761-P8 reached an approved status.

    052
  53. New building now approved

    The latest status recorded for B00640761-P8 is “Approved.”

    053
  54. New building approved

    Filing B00640761-A1 reached an approved status.

    054
  55. New building now approved

    The latest status recorded for B00640761-A1 is “Approved.”

    055
  56. New building filed

    Contruct new 22 story building per plans filed herewith. Filing B00640761-A2.

    056
  57. New building approved

    Filing B00640761-A2 reached an approved status.

    057
  58. New building now approved

    The latest status recorded for B00640761-A2 is “Approved.”

    058
  59. New building filed

    Contruct new 22 story building per plans filed herewith. Filing B00640761-A3.

    059
  60. New building approved

    Filing B00640761-A3 reached an approved status.

    060
  61. New building now approved

    The latest status recorded for B00640761-A3 is “Approved.”

    061
  62. New building filed

    Structural work as per plans filed. Filing B00640761-A5.

    062
  63. New building filed

    Install foundation as per plans filed. Filing B00640761-A6.

    063
  64. New building filed

    Identification of Deep Foundation Elements and pile types proposed. Filing B00640761-A7.

    064
  65. New building filed

    Plumbing work as per plans filed. Filing B00640761-A9.

    065
  66. New building approved

    Filing B00640761-A5 reached an approved status.

    066
  67. New building now approved

    The latest status recorded for B00640761-A5 is “Approved.”

    067
  68. New building approved

    Filing B00640761-A6 reached an approved status.

    068
  69. New building now approved

    The latest status recorded for B00640761-A6 is “Approved.”

    069
  70. New building filed

    Mechanical work as per plans filed. Filing B00640761-A8.

    070
  71. New building filed

    Contruct new 22 story building per plans filed herewith. Filing B00640761-A4.

    071
  72. New building approved

    Filing B00640761-A7 reached an approved status.

    072
  73. New building now approved

    The latest status recorded for B00640761-A7 is “Approved.”

    073
  74. New building approved

    Filing B00640761-A9 reached an approved status.

    074
  75. New building now approved

    The latest status recorded for B00640761-A9 is “Approved.”

    075
  76. New building filed

    Provide support of excavation work as per plans filed. Filing B00640761-B1.

    076
  77. New building approved

    Filing B00640761-B1 reached an approved status.

    077
  78. New building now approved

    The latest status recorded for B00640761-B1 is “Approved.”

    078
  79. New building filed

    Identification of Deep Foundation Elements and pile types proposed. Filing B00640761-B2.

    079
  80. New building filed

    Install foundation as per plans filed. Filing B00640761-B3.

    080
  81. New building filed

    Plumbing work as per plans filed. Filing B00640761-B4.

    081
  82. New building approved

    Filing B00640761-B2 reached an approved status.

    082
  83. New building now approved

    The latest status recorded for B00640761-B2 is “Approved.”

    083
  84. New building approved

    Filing B00640761-B3 reached an approved status.

    084
  85. New building now approved

    The latest status recorded for B00640761-B3 is “Approved.”

    085
  86. New building filed

    Provide support of excavation work as per plans filed. Filing B00640761-B5.

    086
  87. New building approved

    Filing B00640761-B5 reached an approved status.

    087
  88. New building now approved

    The latest status recorded for B00640761-B5 is “Approved.”

    088
  89. New building now approved

    The latest status recorded for B00640761-S8 is “Permit Entire.”

    089
  90. Alteration filed

    Temporary roof/overhead protection at adjoining properties during nb const, filed sep. roof/overhead protection shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B01319613-I1.

    090
  91. Permit recorded for alteration

    DOB lists a first permit date for B01319613-I1. That is not by itself confirmation of activity on site.

    091
  92. New building approved

    Filing B00640761-B4 reached an approved status.

    092
  93. New building now approved

    The latest status recorded for B00640761-B4 is “Approved.”

    093
  94. New building approved

    Filing B00640761-A8 reached an approved status.

    094
  95. New building now approved

    The latest status recorded for B00640761-A8 is “Approved.”

    095
  96. New building approved

    Filing B00640761-A4 reached an approved status.

    096
  97. New building now approved

    The latest status recorded for B00640761-A4 is “Approved.”

    097
  98. Permit recorded for new building

    DOB lists a first permit date for B00640761-I1. That is not by itself confirmation of activity on site.

    098
  99. New building now approved

    The latest status recorded for B00640761-S6 is “Permit Entire.”

    099
  100. Permit recorded for new building

    DOB lists a first permit date for B00640761-S3. That is not by itself confirmation of activity on site.

    0100
  101. New building now approved

    The latest status recorded for B00640761-S3 is “Permit Entire.”

    0101
  102. Permit recorded for new building

    DOB lists a first permit date for B00640761-S4. That is not by itself confirmation of activity on site.

    0102
  103. New building now approved

    The latest status recorded for B00640761-S4 is “Permit Entire.”

    0103
  104. New building now approved

    The latest status recorded for B00640761-S5 is “Permit Entire.”

    0104
  105. New building filed

    Install temporary construction fence as per plans filed. Filing B00640761-B7.

    0105
  106. New building now approved

    The latest status recorded for B00640761-S9 is “Permit Entire.”

    0106
  107. New building approved

    Filing B00640761-B7 reached an approved status.

    0107
  108. New building now approved

    The latest status recorded for B00640761-B7 is “Approved.”

    0108
  109. New building filed

    Provide support of excavation work as per plans filed. Filing B00640761-B6.

    0109
  110. New building now approved

    The latest status recorded for B00640761-S2 is “Permit Entire.”

    0110
  111. New building approved

    Filing B00640761-B6 reached an approved status.

    0111
  112. New building now approved

    The latest status recorded for B00640761-B6 is “Approved.”

    0112
  113. New building now approved

    The latest status recorded for B00640761-I1 is “Permit Entire.”

    0113
  114. New building filed

    Contruct new 22 story building per plans filed herewith. Filing B00640761-C1.

    0114
  115. New building filed

    Plumbing work as per plans filed. Filing B00640761-B9.

    0115
  116. New building filed

    Mechanical work as per plans filed. Filing B00640761-B8.

    0116
  117. New building now under review

    The latest status recorded for B00640761-B8 is “Objections.”

    0117
  118. New building now under review

    The latest status recorded for B00640761-B9 is “Objections.”

    0118
  119. Alteration filed

    Temporary roof/overhead protection at adjoining properties during nb const, filed sep. roof/overhead protection shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing B01319613-P2.

    0119
  120. Alteration now approved

    The latest status recorded for B01319613-I1 is “Permit Entire.”

    0120
  121. Alteration approved

    Filing B01319613-P2 reached an approved status.

    0121
  122. Alteration now approved

    The latest status recorded for B01319613-P2 is “Approved.”

    0122
  123. New building now under review

    The latest status recorded for B00640761-C1 is “Objections.”

    0123