DOB filing B01207494-P1
Alteration filing at 2221 65 Street
Building record · BIN 3430500
2221 65 Street, Brooklyn, NY 11204
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 14 independently sourced records, including 14 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3430500
2221 65 Street
Bensonhurst, Brooklyn
A consolidated public-record view · updated Nov 10, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a vacant land on a 12,000 sq ft lot.
Owner of record
65 & BAY TOWER LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 13, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Apr 7, 2025.
Issued Apr 7, 2025 — REQUESTING AN ENGINEER REPORT DUE TO A SECTION OF OPEN AND UNFILLED AREA LEAVING PREVIOUS CELLAR EXPOSED TO ALL ELEMENTS AT EXPOSURE#4 OF VACANT LOT. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE STABILITY OF CELLAR.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 10, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3430500. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 7 alteration filing, 7 new building. Its latest status categories are 2 under review, 12 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 2221 65 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 14 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Submit curb cut work in conjunction with NB application #320912438. Filing B00061220-I1.
Propose to install temporary construction fence in conjunction with nb #320912438. Filing B00205439-I1.
Filing B00205439-I1 reached an approved status.
Filing B00061220-I1 reached an approved status.
DOB lists a first permit date for B00205439-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00205439-I1 is “Permit Entire.”
The latest status recorded for B00061220-I1 is “Approved.”
To Erect new 6 Story 53 units class A multiple dwelling building. Filing B01253556-I1.
Filing curb cut work type in conjunction with nb app b01253556. Filing B01253556-S1.
Filing structural work type in conjunction with nb app b01253556. Filing B01253556-S3.
Filing foundation & earthwork work type in conjunction with nb app b01253556. Filing B01253556-S2.
Soe/excavation design to facilitate the construction of foundation. the soe system .utilize soldier pile, waler, praker, wood lagging to resist lateral earth pressure. Filing B01253556-S7.
Filing B01253556-S3 reached an approved status.
Filing B01253556-S7 reached an approved status.
Filing B01253556-I1 reached an approved status.
Filing B01253556-S2 reached an approved status.
Filing structural work type in conjunction with nb app b01253556. Filing B01253556-A7.
Filing foundation & earthwork work type in conjunction with nb app b01253556. Filing B01253556-A8.
The latest status recorded for B01253556-S1 is “Objections.”
Filing B01253556-A7 reached an approved status.
The latest status recorded for B01253556-A7 is “Approved.”
Filing B01253556-A8 reached an approved status.
The latest status recorded for B01253556-A8 is “Approved.”
DOB lists a first permit date for B01253556-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01253556-I1 is “Permit Entire.”
DOB lists a first permit date for B01253556-S3. That is not by itself confirmation of activity on site.
The latest status recorded for B01253556-S3 is “Permit Entire.”
DOB lists a first permit date for B01253556-S2. That is not by itself confirmation of activity on site.
The latest status recorded for B01253556-S2 is “Permit Entire.”
DOB lists a first permit date for B01253556-S7. That is not by itself confirmation of activity on site.
The latest status recorded for B01253556-S7 is “Permit Entire.”
Installation of temporary needle beam as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code. Filing B01481062-I1.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code. Filing B01481060-I1.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300psf. Filing B01481021-I1.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the NYC building code. no change in use, occupancy, or egress under this application. Filing B01481022-I1.
Filing for temporary construction fence to fence in property. Filing B01207494-P1.
DOB lists a first permit date for B01481062-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01481062-I1 is “Permit Entire.”
DOB lists a first permit date for B01481060-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01481060-I1 is “Permit Entire.”
DOB lists a first permit date for B01481021-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01481021-I1 is “Permit Entire.”
DOB lists a first permit date for B01481022-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01481022-I1 is “Permit Entire.”
The latest status recorded for B01207494-P1 is “Plan Examiner Review.”