Building record · BIN 3430613

178 Montrose Avenue

178 Montrose Avenue, Brooklyn, NY 11206

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 8 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3430613

178 Montrose Avenue

East Williamsburg, Brooklyn

A consolidated public-record view · updated Sep 22, 2026

DOB filings
8
Active-status
8
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings8
Open or active-status records8
First included filingSep 16, 2025
Latest recorded changeSep 22, 2026

The lot

What is already here?

The lot holds a 1-story warehouse built in 1964, on a 17,000 sq ft lot.

Built
1964
Floors
1
Residential units
0
Building type
Warehouse
Land use
Industrial and manufacturing
Zoning district
R6
Lot area
17,000 sq ft
Building area
17,000 sq ft

Owner of record

156 GRAHAM REALTY LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3430613. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 3 alteration filing, 5 new building. Its latest status categories are 7 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Sep 16, 2025
Latest recorded change
Sep 22, 2026
Highest proposed story count
13 stories
Highest proposed unit count
163 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 178 Montrose Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 8 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    Construct thirteen (13) story Mixed Use New Building with Residential and Community Facility for non-profit w/sleeping and non-profit w/o sleeping accommodations as per plans filed. Filing B01283545-I1.

    01
  2. New building filed

    Mechanical work as per plans filed. Filed subsequent to NB #B01283545. Filing B01283545-S3.

    02
  3. New building filed

    Plumbing work as per plans filed. Filed subsequent to NB #B01283545. Filing B01283545-S4.

    03
  4. New building filed

    Structural work as per plans filed. Filed subsequent to NB #B01283545. Filing B01283545-S2.

    04
  5. Alteration filed

    Installation of temporary plywood fence as per plans. no change in use, egress or occupancy. Filing B01323118-I1.

    05
  6. Alteration approved

    Filing B01323118-I1 reached an approved status.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for B01323118-I1. That is not by itself confirmation of activity on site.

    07
  8. New building approved

    Filing B01283545-I1 reached an approved status.

    08
  9. New building approved

    Filing B01283545-S2 reached an approved status.

    09
  10. New building filed

    Construct thirteen (13) story Mixed Use New Building with Residential and Community Facility for non-profit w/sleeping and non-profit w/o sleeping accommodations as per plans filed. Filing B01283545-P3.

    010
  11. New building approved

    Filing B01283545-S4 reached an approved status.

    011
  12. Permit recorded for new building

    DOB lists a first permit date for B01283545-S2. That is not by itself confirmation of activity on site.

    012
  13. New building now approved

    The latest status recorded for B01283545-S2 is “Permit Entire.”

    013
  14. Alteration filed

    Installation of temporary barricade as per plans. no change in use, egress or occupancy. Filing B01453005-I1.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for B01453005-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration now approved

    The latest status recorded for B01453005-I1 is “Permit Entire.”

    016
  17. Alteration filed

    Installation of temporary plywood fence as per plans. no change in use, egress or occupancy. Filing B01323118-P1.

    017
  18. Permit recorded for new building

    DOB lists a first permit date for B01283545-I1. That is not by itself confirmation of activity on site.

    018
  19. New building now approved

    The latest status recorded for B01283545-I1 is “Permit Entire.”

    019
  20. New building approved

    Filing B01283545-P3 reached an approved status.

    020
  21. New building now approved

    The latest status recorded for B01283545-P3 is “Approved.”

    021
  22. Permit recorded for new building

    DOB lists a first permit date for B01283545-S4. That is not by itself confirmation of activity on site.

    022
  23. New building now approved

    The latest status recorded for B01283545-S4 is “Permit Entire.”

    023
  24. New building now under review

    The latest status recorded for B01283545-S3 is “Plan Examiner Review.”

    024
  25. Alteration approved

    Filing B01323118-P1 reached an approved status.

    025
  26. Alteration now approved

    The latest status recorded for B01323118-P1 is “Approved.”

    026
  27. Alteration now approved

    The latest status recorded for B01323118-I1 is “Permit Entire.”

    027