Building record · BIN 3811113

157 Douglass Street

157 Douglass Street, Brooklyn, NY 11217

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 22 independently sourced records, including 22 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3811113

157 Douglass Street

Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn

A consolidated public-record view · updated Aug 3, 2026

DOB filings
22
Active-status
22
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings22
Open or active-status records22
First included filingMay 25, 2021
Latest recorded changeAug 3, 2026

The lot

What is already here?

The lot holds a 9-story elevator apartment building built in 1965, with 796 homes, on a 273,460 sq ft lot.

Built
1965
Floors
9
Residential units
796
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
273,460 sq ft
Building area
482,780 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 9, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3811113. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 19 alteration filing, 3 new building. Its latest status categories are 22 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
May 25, 2021
Latest recorded change
Aug 3, 2026
Highest proposed story count
1 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 157 Douglass Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 22 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    New 1 story building for mechanical boiler room. Filing B00486866-I1.

    01
  2. New building approved

    Filing B00486866-I1 reached an approved status.

    02
  3. Alteration filed

    Nycha boiler - installation of new plumbing fixtures filed in conjunction with nb application b00486866. Filing B00491448-I1.

    03
  4. Alteration filed

    Nycha boiler - installation of 6 boilers with associated piping filed in conjunction with a new 1 story mechanical boiler room. Filing B00487863-I1.

    04
  5. Alteration approved

    Filing B00491448-I1 reached an approved status.

    05
  6. Alteration filed

    Nycha boiler - installation of mechanical equipment with associated ductwork and piping filed in conjunction with nb application b00486866. Filing B00491068-I1.

    06
  7. Alteration approved

    Filing B00487863-I1 reached an approved status.

    07
  8. Alteration approved

    Filing B00491068-I1 reached an approved status.

    08
  9. Alteration filed

    Nycha boiler - foundation and structural work for new mechanical boiler room 1 story building. Filing B00487090-I1.

    09
  10. Alteration approved

    Filing B00487090-I1 reached an approved status.

    010
  11. New building filed

    New 1 story building for mechanical boiler room. Filing B00486866-P1.

    011
  12. Alteration filed

    Nycha boiler - installation of mechanical equipment with associated ductwork and piping filed in conjunction with nb application b00486866. Filing B00491068-P1.

    012
  13. Alteration filed

    Nycha boiler - installation of new plumbing fixtures filed in conjunction with nb application b00486866. Filing B00491448-P1.

    013
  14. Alteration filed

    Nycha boiler - installation of 6 boilers with associated piping filed in conjunction with a new 1 story mechanical boiler room. Filing B00487863-P1.

    014
  15. New building approved

    Filing B00486866-P1 reached an approved status.

    015
  16. New building now approved

    The latest status recorded for B00486866-P1 is “Approved.”

    016
  17. Alteration approved

    Filing B00487863-P1 reached an approved status.

    017
  18. Alteration now approved

    The latest status recorded for B00487863-P1 is “Approved.”

    018
  19. Alteration approved

    Filing B00491448-P1 reached an approved status.

    019
  20. Alteration now approved

    The latest status recorded for B00491448-P1 is “Approved.”

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for B00487090-I1. That is not by itself confirmation of activity on site.

    021
  22. Permit recorded for new building

    DOB lists a first permit date for B00486866-I1. That is not by itself confirmation of activity on site.

    022
  23. Alteration filed

    Nycha boiler - foundation and structural work for new mechanical boiler room 1 story building. Filing B00487090-P1.

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for B00491448-I1. That is not by itself confirmation of activity on site.

    024
  25. Alteration approved

    Filing B00487090-P1 reached an approved status.

    025
  26. Alteration now approved

    The latest status recorded for B00487090-P1 is “Approved.”

    026
  27. Alteration approved

    Filing B00491068-P1 reached an approved status.

    027
  28. Alteration now approved

    The latest status recorded for B00491068-P1 is “Approved.”

    028
  29. Permit recorded for alteration

    DOB lists a first permit date for B00491068-I1. That is not by itself confirmation of activity on site.

    029
  30. Permit recorded for alteration

    DOB lists a first permit date for B00487863-I1. That is not by itself confirmation of activity on site.

    030
  31. Alteration filed

    Nycha boiler - installation of mechanical equipment with associated ductwork and piping filed in conjunction with nb application b00486866. Filing B00491068-P2.

    031
  32. Alteration approved

    Filing B00491068-P2 reached an approved status.

    032
  33. Alteration now approved

    The latest status recorded for B00491068-P2 is “Approved.”

    033
  34. Alteration filed

    Nycha boiler - installation of 6 boilers with associated piping filed in conjunction with a new 1 story mechanical boiler room. Filing B00487863-P2.

    034
  35. Alteration approved

    Filing B00487863-P2 reached an approved status.

    035
  36. Alteration now approved

    The latest status recorded for B00487863-P2 is “Approved.”

    036
  37. Alteration filed

    Nycha boiler - installation of new plumbing fixtures filed in conjunction with nb application b00486866. Filing B00491448-P2.

    037
  38. Alteration approved

    Filing B00491448-P2 reached an approved status.

    038
  39. Alteration now approved

    The latest status recorded for B00491448-P2 is “Approved.”

    039
  40. Alteration filed

    Nycha boiler - installation of 5 boilers with associated piping filed in conjunction with a new 1 story mechanical boiler room. Filing B00487863-S1.

    040
  41. Alteration approved

    Filing B00487863-S1 reached an approved status.

    041
  42. Alteration filed

    Nycha boiler - installation of 5 boilers with associated piping filed in conjunction with a new 1 story mechanical boiler room. Filing B00487863-P6.

    042
  43. Alteration filed

    Nycha boiler - installation of 6 boilers with associated piping filed in conjunction with a new 1 story mechanical boiler room. Filing B00487863-P5.

    043
  44. Permit recorded for alteration

    DOB lists a first permit date for B00487863-S1. That is not by itself confirmation of activity on site.

    044
  45. Alteration approved

    Filing B00487863-P6 reached an approved status.

    045
  46. Alteration now approved

    The latest status recorded for B00487863-P6 is “Approved.”

    046
  47. Alteration approved

    Filing B00487863-P5 reached an approved status.

    047
  48. Alteration now approved

    The latest status recorded for B00487863-P5 is “Approved.”

    048
  49. Alteration filed

    Nycha boiler - installation of 5 boilers with associated piping filed in conjunction with a new 1 story mechanical boiler room. Filing B00487863-P7.

    049
  50. Alteration now approved

    The latest status recorded for B00487863-S1 is “Permit Entire.”

    050
  51. Alteration approved

    Filing B00487863-P7 reached an approved status.

    051
  52. Alteration now approved

    The latest status recorded for B00487863-P7 is “Approved.”

    052
  53. New building filed

    New 1 story building for mechanical boiler room. Filing B00486866-P2.

    053
  54. New building approved

    Filing B00486866-P2 reached an approved status.

    054
  55. New building now approved

    The latest status recorded for B00486866-P2 is “Approved.”

    055
  56. New building now approved

    The latest status recorded for B00486866-I1 is “Permit Entire.”

    056
  57. Alteration filed

    Nycha boiler - installation of mechanical equipment with associated ductwork and piping filed in conjunction with nb application b00486866. Filing B00491068-P3.

    057
  58. Alteration approved

    Filing B00491068-P3 reached an approved status.

    058
  59. Alteration now approved

    The latest status recorded for B00491068-P3 is “Approved.”

    059
  60. Alteration filed

    Nycha boiler - foundation and structural work for new mechanical boiler room 1 story building. Filing B00487090-P2.

    060
  61. Alteration now approved

    The latest status recorded for B00487090-I1 is “Permit Entire.”

    061
  62. Alteration approved

    Filing B00487090-P2 reached an approved status.

    062
  63. Alteration now approved

    The latest status recorded for B00487090-P2 is “Approved.”

    063
  64. Alteration filed

    Nycha boiler - installation of new plumbing fixtures filed in conjunction with nb application b00486866. Filing B00491448-P3.

    064
  65. Alteration now approved

    The latest status recorded for B00487863-I1 is “Permit Entire.”

    065
  66. Alteration approved

    Filing B00491448-P3 reached an approved status.

    066
  67. Alteration now approved

    The latest status recorded for B00491448-P3 is “Approved.”

    067
  68. Alteration now approved

    The latest status recorded for B00491448-I1 is “Permit Entire.”

    068
  69. Alteration filed

    Nycha boiler - installation of mechanical equipment with associated ductwork and piping filed in conjunction with nb application b00486866. Filing B00491068-P4.

    069
  70. Alteration now approved

    The latest status recorded for B00491068-I1 is “Permit Entire.”

    070
  71. Alteration approved

    Filing B00491068-P4 reached an approved status.

    071
  72. Alteration now approved

    The latest status recorded for B00491068-P4 is “Approved.”

    072