Building record · BIN 4003516

29-10 Thomson Avenue

29-10 Thomson Avenue, Queens, NY 11101

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 15 independently sourced records, including 13 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 4003516

29-10 Thomson Avenue

Long Island City-Hunters Point, Queens

A consolidated public-record view · updated Nov 23, 2026

DOB filings
15
Active-status
13
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings15
Open or active-status records13
First included filingNov 11, 2022
Latest recorded changeNov 23, 2026

The lot

What is already here?

The lot holds a 9-story educational building built in 1951, on a 118,000 sq ft lot.

  1. Floors 2–9Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as public facilities and institutions.
  • Street levelPublic facilities and institutions
Drawn from the outline and roof height the Department of City Planning publishes for this building: 50.3 m over 9 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor.
Built
1951
Last altered
1991
Floors
9
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
M1-4
Lot area
118,000 sq ft
Building area
863,800 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 25, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 65 open notices on record for this building, out of 308 notices on file; the most recent was issued Feb 22, 2024.

  • No report and / or late filing (facade)

    Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024

  • (other bldgs types) - elevator affirmation of

    Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST

  • (other bldgs types) - elevator affirmation of

    Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST

  • 62 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 23, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4003516. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 15 alteration filing. Its latest status categories are 12 approved, 1 under review, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Nov 11, 2022
Latest recorded change
Nov 23, 2026
Highest proposed story count
9 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 29-10 Thomson Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 15 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Filing herewith spinkler modification on the cellar, basement, 1 thru 9 floor as indicated on the drawings. no change in use egress or occupancy. Filing Q08030969-I1.

    01
  2. Alteration approved

    Filing Q08030969-I1 reached an approved status.

    02
  3. Alteration filed

    Proposed selective removals on the 5th and 6th floor of LaGuardia Community College, in preparation for a build out space. All as per plans filed herewith. Filing Q01217682-I1.

    03
  4. Alteration approved

    Filing Q01217682-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for Q01217682-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration filed

    Existing concrete "built-up" areas to be removed. apply floor leveling to existing structural slab. all plans filed as herewith. Filing Q01217682-S5.

    06
  7. Alteration filed

    Infill existing concrete slab openings. no demolition for new slab openings. all plans filed as herewith. Filing Q01217682-S4.

    07
  8. Alteration approved

    Filing Q01217682-S5 reached an approved status.

    08
  9. Alteration approved

    Filing Q01217682-S4 reached an approved status.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for Q01217682-S5. That is not by itself confirmation of activity on site.

    010
  11. Alteration filed

    Interior renovation of the 5th and 6th floors. New construction of barrier-free partitions for classrooms, gathering spaces, and new toilet facilities. New cafe on 5th floor, bleachers between 5th and 6th floors. Providing new equipment and furnishing. Filing Q01363083-I1.

    011
  12. Alteration filed

    Interior fit out work including slab openings, beam removals, structural reinforcement, structural steel and cast-in-place concrete. Partial demo is limited to the interior of the building, handheld equipment only to be used. All plans filed as herewith. Filing Q01363083-S4.

    012
  13. Alteration approved

    Filing Q01363083-S4 reached an approved status.

    013
  14. Alteration filed

    Provide new sprinkler heads and associated piping per the design plans. Filing Q01363083-S3.

    014
  15. Alteration filed

    Provide new AHUs for each floor and associate duct work and VAV boxes. Provide dedicated kitchen exhaust and make-up air for the culinary lab. All plans filed as herewith. Filing Q01363083-S1.

    015
  16. Alteration approved

    Filing Q01363083-S3 reached an approved status.

    016
  17. Alteration filed

    New domestic water booster pump in bsmt, 1 rpz on 9th flr, 3 wash stations in bsmt, 16 flr drains in bsmt, 2 sewer ejectors in sub bsmt, 3 flr drains on 9th flr, 1 floor drain on 7th flr, 1 double check valve assembly sub bsmt 1 hydropneumatic tank. Filing Q01386816-I1.

    017
  18. Alteration approved

    Filing Q01363083-S1 reached an approved status.

    018
  19. Alteration approved

    Filing Q01363083-I1 reached an approved status.

    019
  20. Alteration approved

    Filing Q01386816-I1 reached an approved status.

    020
  21. Alteration filed

    Filing herewith spinkler modification on the cellar, basement, 1 thru 9 floor as indicated on the drawings. no change in use egress or occupancy. Filing Q08030969-P2.

    021
  22. Permit recorded for alteration

    DOB lists a first permit date for Q08030969-I1. That is not by itself confirmation of activity on site.

    022
  23. Permit recorded for alteration

    DOB lists a first permit date for Q01386816-I1. That is not by itself confirmation of activity on site.

    023
  24. Alteration signed off

    DOB recorded a sign-off for Q01217682-S5.

    024
  25. Alteration now completed

    The latest status recorded for Q01217682-S5 is “LOC Issued.”

    025
  26. Alteration signed off

    DOB recorded a sign-off for Q01217682-I1.

    026
  27. Alteration now completed

    The latest status recorded for Q01217682-I1 is “LOC Issued.”

    027
  28. Alteration filed

    Partial demolition of several portion of existing slab on grade and non-structural masonry and concrete walls at basement. No change in use, egress or occupancy under this application. Filing Q08029049-S1.

    028
  29. Alteration approved

    Filing Q08030969-P2 reached an approved status.

    029
  30. Alteration now approved

    The latest status recorded for Q08030969-P2 is “Approved.”

    030
  31. Alteration filed

    Infill existing concrete slab openings. no demolition for new slab openings. all plans filed as herewith. Filing Q01217682-P3.

    031
  32. Alteration filed

    Filing herewith spinkler modification on the cellar, basement, 1 thru 9 floor as indicated on the drawings. no change in use egress or occupancy. Filing Q08030969-P4.

    032
  33. Permit recorded for alteration

    DOB lists a first permit date for Q01363083-I1. That is not by itself confirmation of activity on site.

    033
  34. Alteration now approved

    The latest status recorded for Q01363083-I1 is “Permit Entire.”

    034
  35. Alteration approved

    Filing Q08030969-P4 reached an approved status.

    035
  36. Alteration now approved

    The latest status recorded for Q08030969-P4 is “Approved.”

    036
  37. Alteration now approved

    The latest status recorded for Q08030969-I1 is “Permit Entire.”

    037
  38. Permit recorded for alteration

    DOB lists a first permit date for Q01363083-S1. That is not by itself confirmation of activity on site.

    038
  39. Alteration now approved

    The latest status recorded for Q01363083-S1 is “Permit Entire.”

    039
  40. Alteration filed

    Interior fit out work including slab openings, beam removals, structural reinforcement, structural steel and cast-in-place concrete. Partial demo is limited to the interior of the building, handheld equipment only to be used. All plans filed as herewith. Filing Q01363083-P3.

    040
  41. Alteration approved

    Filing Q01363083-P3 reached an approved status.

    041
  42. Alteration now approved

    The latest status recorded for Q01363083-P3 is “Approved.”

    042
  43. Alteration now approved

    The latest status recorded for Q01363083-S4 is “Approved.”

    043
  44. Alteration filed

    New domestic water booster pump in bsmt, 1 rpz on 9th flr, 3 wash stations in bsmt, 16 flr drains in bsmt, 2 sewer ejectors in sub bsmt, 3 flr drains on 9th flr, 1 floor drain on 7th flr, 1 double check valve assembly sub bsmt 1 hydropneumatic tank. Filing Q01386816-P2.

    044
  45. Alteration approved

    Filing Q01217682-P3 reached an approved status.

    045
  46. Alteration now approved

    The latest status recorded for Q01217682-P3 is “Approved.”

    046
  47. Permit recorded for alteration

    DOB lists a first permit date for Q01217682-S4. That is not by itself confirmation of activity on site.

    047
  48. Alteration approved

    Filing Q01386816-P2 reached an approved status.

    048
  49. Alteration now approved

    The latest status recorded for Q01386816-P2 is “Approved.”

    049
  50. Alteration now approved

    The latest status recorded for Q01386816-I1 is “Permit Entire.”

    050
  51. Alteration now approved

    The latest status recorded for Q01217682-S4 is “Permit Entire.”

    051
  52. Alteration now under review

    The latest status recorded for Q08029049-S1 is “Objections.”

    052
  53. Permit recorded for alteration

    DOB lists a first permit date for Q01363083-S3. That is not by itself confirmation of activity on site.

    053
  54. Alteration now approved

    The latest status recorded for Q01363083-S3 is “Permit Entire.”

    054