DOB filing Q00781658-S3
Alteration filing at 31-40 Thompson Avenue
Building record · BIN 4003535
31-40 Thompson Avenue, Queens, NY 11101
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 5 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 4003535
31-40 Thompson Avenue
Sunnyside, Queens
A consolidated public-record view · updated Sep 1, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 3-story educational building built in 1949, on a 108,000 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 40 open notices on record for this building, out of 148 notices on file; the most recent was issued Nov 14, 2025.
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Jun 29, 2020 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2019
Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
37 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 3, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4003535. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 5 alteration filing. Its latest status categories are 5 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 31-40 Thompson Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 5 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Ms work includes, but not limited to, removal/install of assoc. ductwork/piping, new accu's, air handling units and exhaust fans as per plans on 001-002 and rof. no change in use, egress or occupancy. Filing Q01263303-S1.
Filing Q01263303-S1 reached an approved status.
New structural framing on roof to support mechanical equipment as per plans. no change in use, egress or occupancy. Filing Q01263303-S4.
Filing Q01263303-S4 reached an approved status.
Proposed sprinkler work. all as per plans filed herewith. Filing Q00781658-S3.
Ms work includes, but not limited to, removal/install of assoc. ductwork/piping, new accu's, air handling units and exhaust fans as per plans on 001-002 and rof. no change in use, egress or occupancy. Filing Q01263303-P2.
New structural framing on roof to support mechanical equipment as per plans. no change in use, egress or occupancy. Filing Q01263303-P4.
Filing Q01263303-P2 reached an approved status.
The latest status recorded for Q01263303-P2 is “Approved.”
Filing Q01263303-P4 reached an approved status.
The latest status recorded for Q01263303-P4 is “Approved.”
DOB lists a first permit date for Q01263303-S1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01263303-S1 is “Permit Entire.”
DOB lists a first permit date for Q01263303-S4. That is not by itself confirmation of activity on site.
The latest status recorded for Q01263303-S4 is “Permit Entire.”
Filing Q00781658-S3 reached an approved status.
The latest status recorded for Q00781658-S3 is “Approved.”