DOB filing Q01288130-S1
New building at 42-08 35 Avenue
Building record · BIN 4010893
42-08 35 Avenue, Queens, NY 11101
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 13 independently sourced records, including 13 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 4010893
42-08 35 Avenue
Astoria (East)-Woodside (North), Queens
A consolidated public-record view · updated Oct 29, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 1-story garage or fuel station built in 1920, on a 9,000 sq ft lot.
Owner of record
42-08 35TH OWNER LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4010893. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 8 new building, 3 alteration filing, 2 full demolition. Its latest status categories are 12 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 42-08 35 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 13 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Full demolition to a one story building. Filing Q01243907-I1.
Filing Q01243907-I1 reached an approved status.
Proposed thirteen (13) story mixed use residential and commercial building. Filing Q01288130-I1.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition. Filing Q01243907-S1.
Filing Q01243907-S1 reached an approved status.
Foundation filed in conjunction with nb job number q01288130-i1. Filing Q01288130-S1.
Structure filed in conjunction with nb job number q01288130-i1. Filing Q01288130-S2.
Support of excavation filed in conjunction with nb job number q01288130-i1. Filing Q01288130-S3.
Temporary standpipe system filed in conjunction with nb job number q01288130-s4. Filing Q01288130-S7.
Sprinkler/standpipe system filed in conjunction with nb job number q01288130-s4. Filing Q01288130-S6.
Plumbing system filed in conjunction with nb job number q01288130-i1. Filing Q01288130-S5.
Mechanical system filed in conjunction with nb job number q01288130-i1. Filing Q01288130-S4.
Filing Q01288130-S3 reached an approved status.
Filing Q01288130-S7 reached an approved status.
Filing Q01288130-S6 reached an approved status.
Filing Q01288130-S1 reached an approved status.
Filing Q01288130-S5 reached an approved status.
Filing Q01288130-S2 reached an approved status.
DOB lists a first permit date for Q01243907-S1. That is not by itself confirmation of activity on site.
Filing Q01288130-S4 reached an approved status.
DOB lists a first permit date for Q01243907-I1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01243907-I1 is “Permit Entire.”
The latest status recorded for Q01243907-S1 is “Permit Entire.”
DOB lists a first permit date for Q01288130-S7. That is not by itself confirmation of activity on site.
The latest status recorded for Q01288130-S7 is “Permit Entire.”
DOB lists a first permit date for Q01288130-S6. That is not by itself confirmation of activity on site.
The latest status recorded for Q01288130-S6 is “Permit Issued.”
DOB lists a first permit date for Q01288130-S4. That is not by itself confirmation of activity on site.
The latest status recorded for Q01288130-S4 is “Permit Entire.”
DOB lists a first permit date for Q01288130-S5. That is not by itself confirmation of activity on site.
The latest status recorded for Q01288130-S5 is “Permit Entire.”
DOB lists a first permit date for Q01288130-S1. That is not by itself confirmation of activity on site.
Installation of temporary needle beam as per plans. no change in use, egress or occupancy. Filing Q01473418-I1.
DOB lists a first permit date for Q01288130-S2. That is not by itself confirmation of activity on site.
The latest status recorded for Q01288130-S2 is “Permit Entire.”
DOB lists a first permit date for Q01288130-S3. That is not by itself confirmation of activity on site.
The latest status recorded for Q01288130-S3 is “Permit Entire.”
Filing Q01288130-I1 reached an approved status.
The latest status recorded for Q01288130-I1 is “Approved.”
The latest status recorded for Q01473418-I1 is “Plan Examiner Review.”
Installation of temporary personnel hoist as per plans. no change in use, egress or occupancy. Filing Q01473415-I1.
DOB lists a first permit date for Q01473415-I1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01473415-I1 is “Permit Entire.”
Installation of temporary roof protection as per plans. no change in use, egress or occupancy. Filing Q01478164-I1.
DOB lists a first permit date for Q01478164-I1. That is not by itself confirmation of activity on site.
The latest status recorded for Q01478164-I1 is “Permit Entire.”
The latest status recorded for Q01288130-S1 is “Permit Entire.”