Building record · BIN 4047310

59-17 Junction Boulevard

59-17 Junction Boulevard, Queens, NY 11373

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 21 independently sourced records, including 20 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 4047310

59-17 Junction Boulevard

Corona, Queens

A consolidated public-record view · updated Sep 30, 2026

DOB filings
21
Active-status
20
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings21
Open or active-status records20
First included filingJul 6, 2023
Latest recorded changeSep 30, 2026

The lot

What is already here?

The lot holds a 20-story office building built in 1970, on a 41,380 sq ft lot.

  1. Floors 7–20Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 20.3 m. Nothing on that side reaches this floor.
  2. Floors 2–6Nothing on record
  3. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 7 — the tallest thing within 60 m to the south is 20.3 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 69.2 m over 20 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1970
Last altered
2000
Floors
20
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C4-4
Lot area
41,380 sq ft
Building area
454,645 sq ft

Owner of record

NYC DEP

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 137 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4047310. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 21 alteration filing. Its latest status categories are 18 approved, 2 under review, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jul 6, 2023
Latest recorded change
Sep 30, 2026
Highest proposed story count
20 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 59-17 Junction Boulevard.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 21 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Boiler work consisting removal of two (2) boilers as per plans filed herewith. No change to use egress or occupancy. Filing Q00882417-I1.

    01
  2. Alteration approved

    Filing Q00882417-I1 reached an approved status.

    02
  3. Alteration filed

    Plumbing Systems application replacing the ejector pump located in the cellar a per plans filed herewith. No change to use egress or occupancy. Filing Q01039187-I1.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for Q00882417-I1. That is not by itself confirmation of activity on site.

    04
  5. Alteration approved

    Filing Q01039187-I1 reached an approved status.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for Q01039187-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    General construction work as per plans filed herewith. No change to use egress or occupancy. Filing Q01260714-I1.

    07
  8. Alteration approved

    Filing Q01260714-I1 reached an approved status.

    08
  9. Alteration filed

    Removal and replacement of non-rated column enclosures and non-rated gypsum board finish at concrete block wall core. there is no change to use, egress, occupancy, or fire protection. Filing Q01394839-I1.

    09
  10. Alteration approved

    Filing Q01394839-I1 reached an approved status.

    010
  11. Alteration filed

    Structural work including partial demo of metal stairs and slab for new construction as per plans filed herewith. No change to use egress or occupancy. Filing Q01400208-I1.

    011
  12. Alteration approved

    Filing Q01400208-I1 reached an approved status.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for Q01400208-I1. That is not by itself confirmation of activity on site.

    013
  14. Alteration filed

    Plumbing Systems application replacing the ejector pump located in the cellar a per plans filed herewith. No change to use egress or occupancy. Filing Q01039187-P1.

    014
  15. Alteration filed

    General construction work as per plans filed herewith. No change to use egress or occupancy. Filing Q01417967-I1.

    015
  16. Alteration filed

    General construction work as per plans filed herewith. No change to use egress or occupancy. Filing Q01417973-I1.

    016
  17. Alteration filed

    General construction as per the plans filed herewith. no change to use, egress or occupancy. Filing Q01417327-I1.

    017
  18. Alteration filed

    General construction work as per the plans filed herewith. no change to use, egress or occupancy. Filing Q01417324-I1.

    018
  19. Alteration filed

    Mechanical system work as per the plans filed herewith. no change to use, egress or occupancy. Filing Q01417324-S1.

    019
  20. Alteration approved

    Filing Q01417324-I1 reached an approved status.

    020
  21. Alteration filed

    Mechanical system work as per the plans filed herewith. no change to use, egress or occupancy. Filing Q01417327-S1.

    021
  22. Alteration filed

    Modification of sprinkler system as per plans filed herewith. no change to use, egress or occupancy. Filing Q01417327-S3.

    022
  23. Alteration filed

    Sprinkler modification as per the plans filed herewith. no change to use, egress or occupancy. Filing Q01417324-S3.

    023
  24. Alteration filed

    Plumbing work as per the plans filed herewith. no change to use, egress or occupancy. Filing Q01417324-S2.

    024
  25. Alteration filed

    Plumbing work as per the plans filed herewith. no change to use, egress or occupancy. Filing Q01417327-S2.

    025
  26. Alteration approved

    Filing Q01417324-S1 reached an approved status.

    026
  27. Alteration approved

    Filing Q01417327-I1 reached an approved status.

    027
  28. Alteration approved

    Filing Q01417967-I1 reached an approved status.

    028
  29. Alteration approved

    Filing Q01417973-I1 reached an approved status.

    029
  30. Alteration approved

    Filing Q01417324-S2 reached an approved status.

    030
  31. Alteration now approved

    The latest status recorded for Q01417324-S2 is “Approved.”

    031
  32. Alteration signed off

    DOB recorded a sign-off for Q01400208-I1.

    032
  33. Alteration now completed

    The latest status recorded for Q01400208-I1 is “LOC Issued.”

    033
  34. Alteration now under review

    The latest status recorded for Q01417327-S2 is “Prof Cert QA Review.”

    034
  35. Permit recorded for alteration

    DOB lists a first permit date for Q01260714-I1. That is not by itself confirmation of activity on site.

    035
  36. Alteration now approved

    The latest status recorded for Q01260714-I1 is “Permit Entire.”

    036
  37. Alteration filed

    General construction work as per plans filed herewith. No change to use egress or occupancy. Filing Q01419376-I1.

    037
  38. Alteration filed

    Sprinkler plans filed herewith to show modification of sprinkler heads. No change to use, egress, or occupancy. Filing Q01314130-S2.

    038
  39. Alteration filed

    Plumbing plans filed herewith to cut, cap, and remove all plumbing fixtures in area of work . No change to use, egress, or occupancy. Filing Q01314130-S1.

    039
  40. Alteration filed

    Mechanical work consisting of modifications, and replacement of mechanical systems as per plans filed herewith. No change to use egress or occupancy. Filing Q01314130-I1.

    040
  41. Alteration filed

    General Construction of cellar involving demolition and renovation. No change to use, egress, or occupancy. Filing Q01314130-S3.

    041
  42. Alteration approved

    Filing Q01417324-S3 reached an approved status.

    042
  43. Alteration now approved

    The latest status recorded for Q01417324-S3 is “Approved.”

    043
  44. Alteration approved

    Filing Q01417327-S1 reached an approved status.

    044
  45. Alteration approved

    Filing Q01419376-I1 reached an approved status.

    045
  46. Alteration approved

    Filing Q01417327-S3 reached an approved status.

    046
  47. Alteration now approved

    The latest status recorded for Q01417327-S3 is “Approved.”

    047
  48. Alteration approved

    Filing Q01314130-S3 reached an approved status.

    048
  49. Alteration now approved

    The latest status recorded for Q01314130-S3 is “Approved.”

    049
  50. Alteration now under review

    The latest status recorded for Q01314130-S2 is “Objections.”

    050
  51. Alteration approved

    Filing Q01314130-S1 reached an approved status.

    051
  52. Alteration now approved

    The latest status recorded for Q01314130-S1 is “Approved.”

    052
  53. Alteration approved

    Filing Q01314130-I1 reached an approved status.

    053
  54. Alteration now approved

    The latest status recorded for Q01314130-I1 is “Approved.”

    054
  55. Permit recorded for alteration

    DOB lists a first permit date for Q01417327-S1. That is not by itself confirmation of activity on site.

    055
  56. Alteration now approved

    The latest status recorded for Q01417327-S1 is “Permit Entire.”

    056
  57. Permit recorded for alteration

    DOB lists a first permit date for Q01419376-I1. That is not by itself confirmation of activity on site.

    057
  58. Alteration now approved

    The latest status recorded for Q01419376-I1 is “Permit Entire.”

    058
  59. Permit recorded for alteration

    DOB lists a first permit date for Q01417973-I1. That is not by itself confirmation of activity on site.

    059
  60. Alteration now approved

    The latest status recorded for Q01417973-I1 is “Permit Entire.”

    060
  61. Permit recorded for alteration

    DOB lists a first permit date for Q01417967-I1. That is not by itself confirmation of activity on site.

    061
  62. Alteration now approved

    The latest status recorded for Q01417967-I1 is “Permit Entire.”

    062
  63. Permit recorded for alteration

    DOB lists a first permit date for Q01417324-S1. That is not by itself confirmation of activity on site.

    063
  64. Alteration now approved

    The latest status recorded for Q01417324-S1 is “Permit Entire.”

    064
  65. Permit recorded for alteration

    DOB lists a first permit date for Q01417327-I1. That is not by itself confirmation of activity on site.

    065
  66. Alteration now approved

    The latest status recorded for Q01417327-I1 is “Permit Entire.”

    066
  67. Alteration now approved

    The latest status recorded for Q00882417-I1 is “Permit Entire.”

    067
  68. Permit recorded for alteration

    DOB lists a first permit date for Q01417324-I1. That is not by itself confirmation of activity on site.

    068
  69. Alteration now approved

    The latest status recorded for Q01417324-I1 is “Permit Entire.”

    069
  70. Permit recorded for alteration

    DOB lists a first permit date for Q01394839-I1. That is not by itself confirmation of activity on site.

    070
  71. Alteration now approved

    The latest status recorded for Q01394839-I1 is “Permit Entire.”

    071
  72. Alteration approved

    Filing Q01039187-P1 reached an approved status.

    072
  73. Alteration now approved

    The latest status recorded for Q01039187-P1 is “Approved.”

    073
  74. Alteration now approved

    The latest status recorded for Q01039187-I1 is “Permit Entire.”

    074