DOB filing Q01477530-I1
Alteration filing at 231-02 67 Avenue
Building record · BIN 4163698
231-02 67 Avenue, Queens, NY 11364
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 11 independently sourced records, including 11 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 4163698
231-02 67 Avenue
Oakland Gardens-Hollis Hills, Queens
A consolidated public-record view · updated Oct 30, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 3-story educational building built in 1955, on a 103,850 sq ft lot.
Owner of record
NYC PARKS
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 4, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 5 open notices on record for this building, out of 29 notices on file; the most recent was issued Nov 14, 2025.
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 4, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 4163698. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 11 alteration filing. Its latest status categories are 3 under review, 8 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 231-02 67 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 11 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
213q - filing herewith for the removal of exisitng cmu walls, cleaning of existing slab and installation of new water proofing in the basement, cleaning of areaway walls , replacement of damaged facebrick and replacement and installation of new louvers. Filing Q00756382-I1.
213q - filing herewith for the plumbing work related to the flood elimination upgrade for this school. there will be no change in egress, occupancy or use. sprinklerpiping to be removed and relocated as shown. Filing Q00756382-S2.
213q - filing herewith for the plumbing work related to the site work of the flood elimination upgrade for this school. there will be no change in egress, occupancy or use. Filing Q00756382-S5.
213q - filing herewith for the electrical work related to the flood elimination and boiler conversion of the school. Filing Q00756382-S7.
213q - filing herewith for the civil work related to the flood elimination upgrade for this school. there will be no change in egress, occupancy or use. Filing Q00756382-S4.
Filing herewith for the structural work related to the flood elimination work for this school. there will be no change in egress, occupancy or use. Filing Q00756382-S1.
Filing Q00756382-S1 reached an approved status.
Filing Q00756382-S5 reached an approved status.
Filing Q00756382-S7 reached an approved status.
Filing Q00756382-S4 reached an approved status.
Filing Q00756382-S2 reached an approved status.
Filing Q00756382-I1 reached an approved status.
Pipe scaffold installation for access at work areas in conjunction with job # q00756382-i1. Filing Q00877425-I1.
Support of excavation drawings for new boiler installation. Filing Q00881080-I1.
Filing Q00877425-I1 reached an approved status.
DOB lists a first permit date for Q00877425-I1. That is not by itself confirmation of activity on site.
Filing Q00881080-I1 reached an approved status.
DOB lists a first permit date for Q00881080-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for Q00756382-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for Q00756382-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for Q00756382-S5. That is not by itself confirmation of activity on site.
DOB lists a first permit date for Q00756382-S7. That is not by itself confirmation of activity on site.
DOB lists a first permit date for Q00756382-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for Q00756382-S4. That is not by itself confirmation of activity on site.
The latest status recorded for Q00756382-S7 is “Permit Entire.”
The latest status recorded for Q00756382-S4 is “Permit Entire.”
The latest status recorded for Q00756382-S1 is “Permit Entire.”
The latest status recorded for Q00756382-I1 is “Permit Entire.”
The latest status recorded for Q00877425-I1 is “Permit Entire.”
The latest status recorded for Q00756382-S5 is “Permit Entire.”
The latest status recorded for Q00881080-I1 is “Permit Entire.”
The latest status recorded for Q00756382-S2 is “Permit Entire.”
Installation of sidewalk shed in conjunction with Q00907215. Filing Q01477530-I1.
Installation of chute in conjunction with Q00907215. Filing Q01477534-I1.
Installation of pipe scaffolding in conjunction with Q00907215. Filing Q01477532-I1.
The latest status recorded for Q01477534-I1 is “Plan Examiner Review.”
The latest status recorded for Q01477532-I1 is “Plan Examiner Review.”
The latest status recorded for Q01477530-I1 is “Objections.”